Keutsch 24” 78” Met CO 24” 30” Met 24” 18” AC 20” interior 40” exterior Doors 4” Holes for sampling tubing, several on top of each other 4” Holes for tubing.

Slides:



Advertisements
Similar presentations
PREPOSITIONS OF PLACE WHERE? IN BEHIND ON BETWEEN UNDER NEXT TO
Advertisements

Crescent Academy International
New Squidget Glide Top Tiny Travel Trailer Design Overview
Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.
Pump HR-ToF-AMS DMA Long Column Ambient SMPS O 3 Denuder PAM on roof 510 OutsideInside OPC Logging PC 2 TD O3O3 O3O3 SO 2 Monitor DMA Long Column Switch.
What is the MA of a forklift that requires 480 N of input force and gives 6,600 N of output force? Round to nearest whole number MA = OF/IF MA = 6600.
Low Post Offense point post wing trailer Point looks to pass to a wing (either wing) Point cuts thru on the pass.
CERT MEOC Mobile Emergency Operations Center Concept designed by Keith Morin & Associates - Tucson, AZ.
Think of the parallel lines being the walls of a building, and the transversal is a firewall through the building, and a door in the firewall.
Competency: Design and draw interior elevations for kitchens and baths Objective: Explain the elements of kitchen and bath design.
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
Mauna Loa, Hawaii (MLO) At MLO, the sampling stack is cantilevered away from the tower so that the stack can go through the building roof while the tower.
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
4x + 2y = 18 a. (1,8) = 18 a. 4(1) + 2(8) = 18 b. (3,3)20 = 18 b. 4(3) + 2(3) = = = 18 15x + 5y = 5 a. (-2,7) NoYes b. (-1,4) a.
Start Presentation October 25, 2012 Thermal Modeling of Buildings This lecture deals with the model of a space heating system of a building by means of.
computer
1 LIGO-D V5 LLO Y-End CERY VEAY PVC – 6” x 10 PVC – 6” Cap ¾” QuickEdge 5/8” QuickEdge 6+” hole centered 24” up, 39” over.
12 feet 4 feet Top view Removable fronts 4x4 posts Slats 1x4x ¾” spaced ¾”
BARC Prevailing wind Tower 1 Pristine snow field Balloon The prefab buildings at Barrow 09 Tower 2 25m DOAS View direction Exhaust Line and blower Tower.
BICEP Beam Testing Site Survey Dowell, Chiang, Kovac, Nguyen 2004 May 7.
 Windows-5ft each  Doors- 3ft each  Walls (with the white boards)- 21ft each  Width of walls:10.27  Mini walls: 5ft each  Space between windows:
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
Haramain High Speed Train.
REVIEW LECTURE #1 KNOWLEDGE BASE REQUIRED: STRENGTH OF MATERIALS
Density Lab Equipment, Procedures & Safety Density Lab Equipment, Procedures & Safety.
Town Hall April 24, Exterior Building Design.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Joeun F. Product 1. Life K - Account Book. Joeun F. Product 1. - Account Book Life K.
Honors Env Sci 19 Oct 2009 This week: Water pollution labs – I’m setting up three different labs for this week. We need water samples to work with. Today,
Glenn Lopez P0Dule Production Planning. Glenn Lopez Overview Eventually want a detailed procedure for P0Dule production Workspace layout is efficient.
Photosynthesis Lab - Elodea & Bromothymol Blue
Angles continued Interior Angles are those angles inside the parallel lines. Exterior Angles are those angles outside the parallel lines.
Title Procedure Lab Name Date Class. Purpose Students will understand the significance of following procedure properly step by step. (Remember the cookbook.
Well 30 Modeling. Model Grid and Setup Well 30 Well 31 Well 27 Well UC-H2.
3’ door 32 ‘ 14 ‘ 18 ‘ Rear ramp door 8’4” 3’ x 16’ slide out 3’ x 10’ slide out 3 ‘ 8 ‘ 12 ‘ FRONT Top View Dimensions.
University of Houston Passage measurements and ½ inch width 79 and ½ inch height Elevator cabin measures 56 ½ x 79 ½ inches.
Text - Chapter 3 Lab Manual - Chapter 3 Student CD Tutorials Course Planner Pipetting Skill Assessment Fun with Volume Measurement.
The proposed trailer will have the capability to be pulled by a GSA pick-up and LMTV. The new trailer will also be wired with the proper type of electrical.
U.S. Department of the Interior U.S. Geological Survey Repository Report for the USGS Woods Hole Science Center or, How I lost my mind and found it in.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Fig. 6-CO, p p. 185a p. 185b p. 185c p. 185d.
Annexure II Presentation of decorate the Mobile Science Lab (Sample purpose)
Kasbeer Hall, 15th Floor of 25EP
Restriction Digest Laboratory
Experimental study of shaft resistance of energy pile
Parallel Lines Discovery Activity
Representing Sample Spaces
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Crime Scene DNA Profiling Lab
Parallel Lines Discovery Activity
Process Flow For Electronic Component Prep
Splash Screen.
Representing Sample Spaces
Section 11.7 Probability.
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Figure 9.1.
A # Gasket spacing between flanges are not included in dimensions.
Fig. 6-CO, p. 211.
07CO, p. 190.
Chapter 40.
C.2.10 Sample Questions.
9.4 Find the measure of the interior angles. You are at Poster A.
Objective: Explain the elements of kitchen and bath design.
Five-Minute Check (over Chapter 11) Mathematical Practices Then/Now
C.2.8 Sample Questions.
Depression and Elevation
C.2.8 Sample Questions.
KNOWLEDGE BASE REQUIRED:
Kitchen sink with fold away doors
Presentation transcript:

Keutsch 24” 78” Met CO 24” 30” Met 24” 18” AC 20” interior 40” exterior Doors 4” Holes for sampling tubing, several on top of each other 4” Holes for tubing to pump shed Current Container new layout Faloona 32” 68” Main door Old CG comp Holzinger? 24” 30” Old GC Workspace 24” 36” Work space and storage 24” 48” Tower Location

26’ interior length Mobile Lab, 28 ft exterior GC/Mass spec 24” 60” Cohen HONO 24” 60” Goldstein PTRMS 32” 36” Cohen comp 25 ” 20” Cohen Blue NOy gradient 40” 38” Cohen Dye NOy Flux 40” 38” Cohen comp 25 ” 20” GC/MS Aerosol 24” 60” Door 45” AC 20” interior 40” exterior Roll up door Thornton 36” 46” This end will be near new scaffolding tower.

17’ interior length Jimenez AMS 42” 25” Jimenez Computer 24” 36 ” New Container, 20 ft exterior Jimenez Thermal denuder 24” 96” Jimenez DMA 24” 36” Brune TEOM 24” 48” Table Dye Brune Electronic Rack 36” UPS Vong Computer 30” 19” Covert 30” 19” This end will be near scaffolding tower. Please note: this trailer will be quite full, and there was no space left for doors and other obstacles which might be present. Some shuffling might occur.