Technology Planning 2009 Session 1 Mary A. Warren, Director LTC1C Sept., 2009 Sept., 2009.

Slides:



Advertisements
Similar presentations
Quantitative and Scientific Reasoning Standard n Students must demonstrate the math skills needed to enter the working world right out of high school or.
Advertisements

Engaging Families for Student Growth
Technology Integration Plan (TIP) Overview Meeting Welcome TIP Teams.
Blogging at Btown. How might I use a blog? As a Do-Now starter activity To build a vocabulary or other collaborative list To cross class and/or grade.
Chairing a Florida Catholic Conference Accreditation Visitation.
MIS 470: Information Systems Project Yong Choi School of Business Administration CSU, Bakersfield.
Welcome to Manufacturing Processes Online Class! Dr Simin Nasseri (PhD, PE) Southern Polytechnic College of Engineering and Engineering Technology.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
District Improvement Facilitators Network January 30,
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Commissioner’s Memo RT Regulatory The technology plan can be access via the following website
C&I 209, Section 08 Welcome! August 23, 2011 Please make a name card and sign the attendance sheet.
Welcome to the Second Tutorial Welcome to the second part of this communication system website tutorial! This tutorial is for church planters. When you.
MSM Computer Orientation PowerSchool MSM Web Page SchoolFusion/Class Pages.
This will explain how to make an online assignment using Skyward. Students need to know how to log into their Skyward account to complete this assignment.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Using the Online HSOPS & RC Apps for CSTS Armstrong Institute for.
Job Search 101 Free Geek Instructor: Wayne Flower.
Science Fair Projects Developed by Ms. Sica-Fosella 10 Easy Steps to Science Project Completion.
WESS Module 4 Chopping and Releasing HAZREPs Web Enabled Safety System.
CLASSROOM EXPECTATIONS Ms. Bain Holgate Middle School 8 th Grade Language Arts.
+ C: 17 Sept Homework: Background info paragraphs Objective: SWBAT test a hypothesis by collecting, organizing and analyzing data. Do now: Rearrange.
General Classroom/Ryan Information. Transportation/Bus Procedures Please fill out the transportation form on the front table. Our school will have teachers.
Week 25: Mon + Tues. (Watch video before taking survey) *Check to take Survey!!!
Connections MOBILE O2 and Vodafone. Connections Select the Customer Find the correct customer by using the alphabetical tabs in the Customer section:
Welcome to the Interactive Survey System. 2 What Is the Interactive Survey System? Online, interactive version of the documents needed for NCQA accreditation,
Introduction & Step 1 Presenter: Updated 6/21/2013.
Welcome to Technology Planning FY 2013 Learning Technology Center 1 Central Mary A. Warren, Director.
 Complete the credit check worksheet  Look for duplications, missing grades or no credit  Be sure to sign the form  Return to Guidance Office.
Important to Remember! Name of tool used to collect data. Date the tool was administered.
Rhode Island Model Educator Performance and Support System Training.
ESource Help and Step-by-Step Instructions for Honeywell Suppliers.
E-Rate 103: Completing form 471 Funding Year 2010 July 1, 2010-June 30, school year.
TECHNOLOGY PLANNING FOR Mary Mehsikomer Division of School Improvement November 2006.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
District Technology Plan (DTP) Overview Meeting Area III Learning Technology Center John Closen.
Technology Integration Plan (TIP) Overview Meeting Area III Learning Technology Center John Closen.
Post-Secondary Information. Agenda How to find information about applications, scholarships, financing Post Secondary Information Sessions Transcripts.
English 28: Last Class Class Reflection PLO Survey Discussing the Final Exam.
AMSA SUPERVISOR EDUCATION PROGRAM ONLINE APPLICATION Helpful hints for Registered Users (Students) MRW Computer Systems, Inc. July 14, 2012MRW Computer.
WELCOME - As you enter the room… Walk around, Read the posted questions, and Use the colored dots provided to select the four questions that are most important.
CM220 College Composition II Friday, January 29, Unit 1: Introduction to Effective Academic and Professional Writing Unit 1 Lori Martindale, Instructor.
Information and Communication Technology Literacy III Grade 8 Ms. Green The key to unlocking your future.
TECHNOLOGY PLANNING WRITING SESSION #3 January 2011 Cyndie Mutka McCarley.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Updated 12/9/2015 Hiring Manager Training Guide. Updated 12/9/2015 Table of Contents Introduction System Overview Review Applications Using Highlights.
Welcome to Accounting II Professor Kris Friestad Unit 1 Seminar.
USING EASYBIB TO CREATE A WORKS CITED Rhonda Samuels Roberts Library EDM 595—A Spring 2011.
LOAN RADAR Media Center, LLC. Keep your team on the same page Update your in-process loans with loan status.
Welcome to the webinar! This session will commence at 12:00pm Here are some tips for this session: Adjust audio here (and make sure that the volume on.
Agriculture & Food Systems Evaluation SHANNON DILL, AGRICULTURE EXTENSION EDUCATOR TERESA MCCOY, ASSISTANT DIRECTOR, EVALUATION & ASSESSMENT FEBRUARY 24.
Student Technical Support If experiencing any technical difficulties, please call Technical Support at:
Technology Planning Session I October 15, 2009 Facilitator: Patti Furlano October 15, 2009 Facilitator: Patti Furlano.
SCC P2P – Collaboration Made Easy Contract Management training
Writing and Submitting Student Learning Objectives
The E-Rate Program Tips for Success Fall 2011 Applicant Trainings.
Training Guide for Faculty
Show My Homework for Parents
Generating Multiple Players Cards February 2017
Student Registration/ Personal Needs Profile
Welcome! Are you ready?.
Training Guide for Faculty
All about Azmerit.
Welcome to the New Mexico State Personnel Office (SPO) Day 2
Coordinator of Field Placements
Making a Change.
Student Registration/ Personal Needs Profile
Student Registration/ Personal Needs Profile
American Government Welcome to 6.06!
All about Azmerit.
This is a template for a presentation that you can use to introduce your team to Harvest. You can customize the content of the slides. You’ll want to pay.
Presentation transcript:

Technology Planning 2009 Session 1 Mary A. Warren, Director LTC1C Sept., 2009 Sept., 2009

Welcome Please get a name tag! Introduce yourself to someone you don’t know Share your technology planning ‘experience’ with that person Rate your experience!

Today’s Objectives Understand the technology planning process Be able to locate and use resources provided for technology planning Complete the ‘basic’ technology plan documents in order to establish a ‘creation’ date Prepare to collect data to be summarized and analyzed

Think/Write What is your objective for today? Write it out on a post it note, attach to front of your folder.

Oops! DON’T FORGET THE PARKING LOT! QUESTIONS CONCERNS WORRIES

Basic Plan Submission WHY??? –Pre E Rate Application –USAC requirements-E Rate purposes Please review these 5 pieces Basic Plan Resources – Basic Plan Guide – read please ?? Highlight anything needing more clarification –Template Provided Basic Template_2010 (excel doc) –Basic Info –ActionPlan-I –PartF-Monitoring

Documents Needed –Did you bring your last tech plan? –Did you bring inventories? –Do you have E Rate information? Action Plan – Tech Deployment Part E Make sure your E rate items for 2010 are listed here! –Example of necessary information!

Stretch and Share Stand up Turn to another As you stretch Share your level of comfort at this time

Introducing IIRC Online Tech Plan –Walk through – iirc.niu.edu –Usernames/Passwords

BASIC Plan Submission Review Basic Plan Submission –Resources Provided Basic Guide Erate_TechnologyPlan_Template_2010 –Complete all 3 pieces to complete basic plan.

What Next? – Option #1 Hard copy document – proof of creation of your technology plan Complete spreadsheet Basic Template –Print out/save with E Rate/Tech Plan documents locally. –Stamp Date and save. – yourself and/or superintendent.

What Next? – Option #2 Log into iirc –Username/Password –Go to Technology Plan tab Complete pieces for Basic Plan Save (do not ‘submit’) – This will establish a creation date! Print.pdf – from iirc Date stamp – save locally! self/superintendent, save .

Work Time!!! Basic Plan – use Basic Excel document to complete and print hard copy, or Use iirc website to enter appropriate information!

LUNCH

Check for Understanding!!

FACT Basic Technology Plan was formerly called the Draft Technology Plan

MYTH ISBE must approve your Basic Technology Plan

FACT Basic Tech Plan must be completed before you apply for E Rate funding for FY

FACT Basic Technology Plan must be created before Form 470 is submitted

MYTH ISBE Approved Tech Plans may be written for 3 to 5 years

FACT Writing the Technology Integration Plan should be a team effort

FACT CIPA refers to the Children’s Internet Protection Act

MYTH There are 20 required USAC elements to be in your tech plan

FACT Local School Boards do not need to approve the technology plan to be submitted.

MYTH Technology Plans should be submitted to the IRS

Refocus Complete the ‘basic’ technology plan documents in order to establish a ‘creation’ date Understand the technology planning process Be able to locate and use resources provided for technology planning Prepare to collect data to be summarized and analyzed

What we hope to accomplish PM! Basic Plan Submission- Finish? IIRC Website –Usernames/Passwords –Show log in directions! Understand the Process –Section I – Data Collection –Section II – Action Plan –Section III Stakeholder & CIPA Policy Data Collection Pieces!

IIRC Website Log in Directions – /Part_II/LogInEPlans.pdfhttp:// /Part_II/LogInEPlans.pdf Understand the Process –Review Parts of Online Plan Section I Data Collection Section II Action Plan Section III Stakeholder & CIPA Policy

Data Collection Prepare to collect data to be summarized and analyzed Review of Data Pieces needed Description of Tools (Surveys, Logs, Evaluations, etc.) Used Summary/Analysis of Data Key Factors – identified gaps Conclusions – how to address gaps

Date Tools - Surveys Report Card Data (iirc) –Example Summary/Analysis Student Survey Educator Survey Home/School Connection Library Survey Take time to look at these surveys and mark the items you might use for your own survey! Use highlighter, pen!

This Just In!! Next Steps On Line Data Collection 8 th Grade Technology Proficiency Test Data Application Form

Let’s Review Description – Provide a description of other data collected during the development of the action plan. It may include existing data considered in the writing of this plan. This is a list of __________ and, when appropriate, _______ administered. TOOLS DATES

Let’s Review Summarize the Data – This box should include a _______________and _____________ of the significant data. Key Factors – The information in this box are directly aligned to the data __________and identify probable __________ or contributing __________ to the identified _________/gaps and can be influenced by the objectives and strategies in this plan SUMMARYANALYSIS FACTORS NEEDS CAUSES

Let’s Review Conclusions – The information in this box will include one or two solid _______________ statements drawn from __________ and information stated above. The statements should be relevant to the development of the action plan. CONCLUSIONS DATA

Homework! Finish Basic Plan Information Save information on iirc website Vision? Data Collection –Use surveys? –Develop own surveys? –Have surveys in place? Bring Data pieces to next session!

Exit Slip Post your exit slip What was the most important thing you learned today? What additional information might you need to complete your plan? Post on your way out!

Next Step Tech Planning October 7, 2008 West 40 ISC Bring your data, be ready to summarize and analyze it.

Welcome Please get a name tag Introduce yourself to someone you don’t know Share your technology planning ‘experience’ with that person Use dot to rate! Experienced Familiar with Process Novice, little or no experience