Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wednesday September 14th
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tue :25 Beams dumped due to RF vacuum interlock
Summary of Week 13 G. Arduini, B. Holzer
Saturday 2/4/ :00-09:00 Problems with SPS:
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday 26th July 13:21 Fill 2880 beam dumped
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
LHC - Week 38 Technical stop: Katy Foraz
Summary Tuesday h23: Machine closed. Precycle started.
Thursday
Saturday 24 September 2011.
Friday 15th February - morning
Monday 10th December - morning
Tuesday
Presentation transcript:

Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention point 8 during technical stop  See Serge Claudet’s presentation last Friday Week LHC status

7:00 – 9:13 Access Point 8 for QPS RQD A78 7:24 MKB (dilution kickers) in fault B1 & B2  reset by piquet SIS positioning wire on IR8 triplet out of tolerance (why?)  changed WPS limits 8:05 cryogenics is back Critical settings check on MKD settings failed, hardware setting off (not by much)  changed LSA values to be able to continue; need 3 hour access to update hardware setting. Saturday

12:22 MKI B1 tripped during soft-start (MKISS)  was reconditioned by several soft-starts at 14:22 (M. Barnes: probably insufficient conditioning of a new switch)  A modified soft-start procedure would have been desirable (more gradual change), but not possible due to absence of experts  Access for Alice and CMS  16:10 Access finished 16:52 update of LBDS energy tracking tables Saturday cont.

17:30 pilot injection:  Optimization at 450 GeV (orbit, tune, chromaticity, RF phasing)  Instrumentation: BPM calibration (phasing-in); Set-up of BSRT and abort gap (injection energy) F. Roncarolo  Temporary injection line steering (SPS orbit to be corrected) 19:40 Trip of RQ10.L1B2  Dry ramp for testing before access  which verified that the new LBDS energy tracking tables are OK  access afterwards: 22:21 water flow increased RQ10, reset OK  Water flow generally too low for quadrupoles? MKI thresholds for IQC updated  first iteration - Etienne Carlier 21:36 RQ6.L8B1 and RQ6.L8B2  (same fault as the RQ10: “EXTERNAL DC CABLE WATER FLOW”)  reset ok Saturday evening

22:42 UJ14 patrol lost: problem with access doors 1:00 machine closed 1:37 pilot injection - ramp 2:24 Beams dumped at top energy, RQ4.R6B2 tripped: again the “external DC cable water flow”  Injection test for MKI - IQC limits (inject and dump 10 times)  Ramp – squeeze – collide with pilots  Software issues but OK Night

Tune and Chromaticity during ramp LHC status

Second ramp: tune and orbit feedback trims LHC status

Carried out a TCDQ-TCSG consistency check with defining a clear beam edge with the TCP and then bumping the beam on to the TCSG and TCDQ. The obtained results do not comply with a retraction of 1 sigma between TCSG and TCDQ.  More tests have to be carried to study the offsets at the TCDQ after the intervention in the TS. Sunday morning LHC status

11:11 Lost sector 81 11:35 Major CERN wide electric perturbation -  A series of unfortunate events…. LHC 18 kV loop down for a sustained period  RF, ADT, MKIs and beam dump tripped, fault-off.  Collimators  BI Access chain for LHC and TI2 lost. Patrol lost in points 2, 3  All vacuum valves closed. No communication  Technical network in a bad shape  Cryogenics conditions lost sectors 23, 34, 45, 78, 81.  Experiments and injections hit hard Sunday LHC status

Mass mobilization  EL, TI/OP, Cryo, cooling, ventilation, vacuum, controls, collimators, radiation protection… Several accesses in the tunnel  Fire brigades – false ODH alarms  Mainly related to EL and cryo.  Experiments, VAC, cooling… Recovery LHC status

Several BLM crates were down: tried reboots and contacted experts. They will need to follow this up tomorrow. Collimators went in autoretraction due to the power cut. This requires an important work to recover the settings because in some cases also the UPS were lost (recalibration might be needed). Various kickers tested by E. Carlier: no problem found Various communication problems for the access systems around P3. Needs urgent follow-up by access team. Recovery LHC status

VAC: affected by communication problems. One real interlock in P4 due to pumps that stopped. Needs follow- up Monday. Tried to recover some FGC's of the RF system without success: needs follow-up Monday. Rebooted various BPM servers. Further checks by BI are needed. EPC: experts checked the systems around the ring and found no issue, but recommend to reset and switch on asap to check. Recovery LHC status

VAC: P4 (pumps not working) VAC: S12, S67, S81 Access team: intervention for PZ33 BLM team: at least 4 accesses: P2-right, P5-right, P4- left, P8 TCDQ: verification of survey to check suspected position errors. Collimator: power of one rack in SR2 could not be recovered and required manual intervention. UX451: EL team requested an access. List of required accesses known so far, LHC status To be confirmed

PZ33 (access system controls down) UJ27 (cause by problem in PZ33) UJ43 (cause by problem in PZ33) UP55 (lost at the moment of the electrical power cut) PM56 (lost during today's accesses) Lost patrols LHC status

Accesses as required Patrols as required Cryogenics  Status – Serge Claudet PS recovery – still down with PFW problem Tests and dry run SVC back on around LHC Atlas and CMS magnets not before Thursday  Will continued with beam commissioning and bunch number ramp up… minimal luminosity loss. Today LHC status

Verification tests:  TCDQ and TCSG relative position  follow-up required  beam presence flag intensity limit  Beam Dump (inject and dump mode)  Asynchronous dump 450 GeV B2 (pilot or 1-2 nominal bunches)  loss maps at injection Pilot + 2 nominal bunches  1 hour in stable beams  loss maps at 3.5 TeV 48 bunches per beam - stable beams for 3-4 hours Default is to continue with the satellite collision scheme 264b, 840b… Incoming after recovery LHC status