S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.

Slides:



Advertisements
Similar presentations
QUAN 6610 Flow Time Analysis (T)
Advertisements

Process Analysis and Applications Module
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Flow Rate and Capacity Analysis
Slide 1Time and Throughput Management & Improvement© Van Mieghem Bottleneck Management and Improvement  Time and Throughput: –Critical Path vs. Bottleneck.
Lin/Operations/Process Analysis & Apps1 Process Analysis and Applications Module u Operational Measures: Time T, Inventory I, Throughput rate R »Link to.
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
OM&PM/Class 4b1 1Operations Strategy 2Process Analysis 3Lean Operations –Class 3b: House Game –Class 4a: The Paradigm of Lean Operations: The ideal –Class.
Lean Operations (JIT) Module
4. Flow-Time Analysis Flow Time 3-Flow Time Reduction Levers Based on the book: Managing Business Process Flows.
Healthcare Operations Management © 2008 Health Administration Press. All rights reserved. 1.
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.
OM&PM/Class 2b1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2 Process Analysis –Class 2a + 2b: Process Flow.
Based on the book: Managing Business Process Flows.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
Lean Operations (JIT) Module
Process Analysis and Applications Module
OM&PM/Class 2a1 1Operations Strategy –Class 1a: Introduction to OM –Class 1b: Strategic Operational Audits 2Process Analysis –Class 2a: Process Flow Analysis.
Chapter 6: Activity Based Management and the New Manufacturing Environment Identify the true costs of resources consumed in performing the organization’s.
Beni Asllani University of Tennessee at Chattanooga
Supply Chain Management Managing Material Waiting Time
Just-In-Time “Eliminate Waste”.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
ACTIVITY BASED COSTING
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
Lean operations and JIT
Welcome 1 Lean Overview. Housekeeping  Emergencies  Bathrooms  Breaks  Food/drinks 2.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
OPERATIONS MANAGEMENT OPRE 6260 Raymond Lutz. Products, Processes, and Performance - Chapter 1 Learning Objectives An operation as a transformation process.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Candid Comparison of Operational Management Approaches James R. Holt, Ph.D., PE, Jonah-Jonah Washington State University-Vancouver Engineering Management.
S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance.
Operations Managment Kristen’s Cookie - Lecture 4 (Chapters 4 and 5)
Based on the book: Managing Business Process Flows.
OPSM 501: Operations Management Week 6: The Goal Koç University Graduate School of Business MBA Program Zeynep Aksin
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
OPSM 501: Operations Management Week 4: Process analysis Kristen’s Cookie Koç University Graduate School of Business MBA Program Zeynep Aksin
27 Lean Principles, Lean Accounting, and Activity Analysis
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
OPSM 405 Service Operations Management
OPSM 301 Operations Management Class 5: Business process flows: Analysis Koç University Zeynep Aksin
Flow Rate and Capacity Analysis
Process Characteristics
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
3-1Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. Course Code MGT 561 Supply Chain Management Book: Supply Chain Management Strategy,
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Agile or lean? “Lean” works best in high volume, low
Key Learnings: Little’s Law
Theoretical Capacity Theoretical capacity: The capacity (throughput rate) of a process under ideal conditions (units / time) Effective capacity: The capacity.
Class 28: Review for Final Exam
Lean operations and JIT
Synchronous Manufacturing and Theory of Constraints
Pull Manufacturing and Just In Time
Course Summary Organization: A process providing goods and services based on a set of inputs, including raw material, capital, labor and knowledge. The.
Synchronous Manufacturing
Just-In-Time and Lean Production
Value Stream Mapping GEOP 4316.
Just-In-Time and Lean Production
Cost Resource-Activity match High Utilization (Low Safety Capacity)
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Synchronous Manufacturing and Theory of Constraints
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

S. Chopra/Operations/Quality1 Wrap Up Levers for Improving Process Performance

S. Chopra/Operations/Quality2 Strategic Framework u What is “improvement?” –Strategic position »Shouldice, Wriston u Targeting improvement –Link to financials »CRU Computer Rentals

S. Chopra/Operations/Quality3 Process Flow Measures u Key concepts: Flow time, inventory, throughput, process cost, quality. u Key relation: Inventory = Flow time  throughput u Key management activity: Select process flow measures to manage for improvement. u Key metric: Net present value, return on total assets. u The basic managerial levers for process improvement are: 1. Increase in throughput (decrease in flow time). 2. Decrease in inventory (decrease in flow time). 3. Decrease in process cost. 4. Improve quality

S. Chopra/Operations/Quality4 Levers for Managing Theoretical Flow Time u Key concepts: Critical path, critical activity, theoretical flow time. u Key management activity: Identify and manage activities on all critical paths. u Key metric: Length of critical paths. u 1. Reduce the work content of an activity on the critical path. –Eliminate non value-adding aspects of the activity (\work smarter"). –Increase the speed at which the activity is done (\work faster"). –Reduce the number of repeat activities (\do it right the first time"). u 2. Move some of the work content off the critical path. Move work from a critical path to a non-critical path. Move work from a critical path to the \outer loop" (pre- or post- processing).

S. Chopra/Operations/Quality5 Levers for Managing Theoretical Capacity u Key concepts: Throughput, Capacity, bottleneck resource u Key management activity: Identify and manage bottleneck resource(s). u Key metric: Contribution margin per unit time on bottleneck(s). u The basic approaches to increasing the theoretical capacity of a resource pool can be summarized as: –Decrease the unit load on the bottleneck resource. »Work smarter, faster, do it right the first time, or change the product mix. » Move some of the work content to a non bottleneck resource. –Increase the size of load batches at a bottleneck resource. –Increase the scheduled availability of a bottleneck resource (“work longer"). –Increase the number of bottleneck resource units (“scale of operation"),

S. Chopra/Operations/Quality6 Levers for Reducing Waiting Time (Inventory related) u Key concepts: Waiting time, flow time efficiency, cycle inventory, safety inventory, safety capacity. u Key management activity: Manage buffers to reduce waiting time. u Key metric: Waiting time in buffers. u The basic approaches to reducing waiting time can be summarized as: 1. Reduce cycle inventory (reduce batch size). Reduce setup or ordering cost per batch. Reduce forward buying. 2. Reduce safety inventory. Reduce demand variability. Reduce the replenishment lead time. Reduce the variability in replenishment lead time. Pool safety inventory. u Physical centralization u Exploit product substitution. u Use common components. u Postpone the product differentiation closer to the point of demand.

S. Chopra/Operations/Quality7 Levers for reducing Waiting Time (Capacity Related) 3. Manage Safety Capacity Increase safety capacity. Decrease variability in arrivals and service. Pool available safety capacity. 4. Synchronize flows: Manage capacity to synchronize with demand. Manage demand to synchronize with available capacity. Synchronize flows within the process. 5. Manage the psychological perceptions of the customers to reduce the cost of waiting.

S. Chopra/Operations/Quality8 Levers for Lean Operations u Key concepts: Waste, non-value adding activities, cellular layout, demand pull, quality at source. u Key management activity: Synchronize process flows while maintaining efficiency. Set up a framework for process improvement. 1. Synchronizing flows in a plant. Reduce batch size (transfer and production) Level Production and Transfer: Batch size reduction, Heijunka. Pull rather than push work Quality at Source Flexible resources Cellular layout. 2. Continuous improvement: How to increase visibility of waste at low cost?

S. Chopra/Operations/Quality9 Levers for Controlling Process Performance u Key concepts: Normal and abnormal variability, process capability. u Key management activity: Monitor and adjust process performance dynamically over time. Reduce variability and its effects. 1. Measure, prioritize, and analyze variability in key performance measures over time. 2. Feedback control to limit abnormal variability – Set control limits of acceptable variability in key performance measures. – Monitor actual performance and correct any abnormal variability. 3. Decrease normal process variability / increase process capability. –Design for Processing (Simplify, Standardize, and Mistake Proof). –Fewer steps