A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.

Slides:



Advertisements
Similar presentations
Status of the LANSCE Upgrade LA-UR Eric Bjorklund.
Advertisements

Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Bob Dalesio Controls October 13-14, 2004 Controls Overview LCLS Facility Advisory Committee October 13-14, 2004 Outline Goals.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Dayle Kotturi Controls April 29, 2004 Controls Overview LCLS Facility Advisory Committee April 29-30, 2004 Outline Status.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Pioneering Science and Technology Office of Science U.S. Department of Energy Joseph Xu, apsctl, anl LCLS Motion Control Architecture Motion Drive/Devices.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Integrating Acquired Subsystems Bob Dalesio 11/29/98.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Pioneering Science and Technology Office of Science U.S. Department of Energy UNDULATOR SYSTEMS REVIEW MARCH 3-4, 2004 ARGONNE NATIONAL LAB. 1 LCLS Optical.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Motion Control at the Advanced Photon Source Argonne National Laboratory Mark Rivers University of Chicago 7 GeV synchrotron x-ray light source, the largest.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Mark Rivers University of Chicago
ATF/ATF2 Control System
SLS Timing Master Timo Korhonen, PSI.
LAMP Vacuum System Documentation
Undulator Scope, Management, and Organization
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Breakout Session SC3 – Undulator
Presentation transcript:

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department of Energy LCLS Facility Advisory Committee April 29-30, 2004 Undulator Controls Overview S. Joshua Stein

Pioneering Science and Technology Office of Science U.S. Department of Energy 2 Undulator Controls : Design Philosophy The LCLS Undulator Control System (UCS) will be designed as a stand-along control system with interfaces to the existing SLAC control system. Commercial products will be used whenever possible to avoid duplication of effort and maximize the benefits of product maturity. When a novel design is required, all attempts will be made to create a “product” which will be useful to all control subsystems of the LCLS.

Pioneering Science and Technology Office of Science U.S. Department of Energy 3 Undulator Controls : Resource philosophy Whenever possible, APS manpower will be utilized in the design and implementation of the Undulator Control System. External consultants will be used to help bridge the gap between SLAC and APS and fill in for engineering manpower that APS is unable to supply. -Bob Dalesio (LANL) is currently working with both APS and SLAC on LCLS control issues. One of his goals is to ease the communication between the different (independent) control systems. His experience in implementing control systems for multi-laboratory projects make him uniquely qualified in this role. -Technical design effort will be outsourced as needed from a wide pool of talent in the EPICS community.

Pioneering Science and Technology Office of Science U.S. Department of Energy 4 Undulator Controls : Schedule and cost Whenever possible, real-world experience was used as a basis of estimate for both material and effort costs. Using engineering experience from within the APS controls group (who designed and implemented the control system for the APS and LEUTL), initial estimates were gathered from a diverse resource pool. Also, consultant effort has been utilized to check and scrub the initial Undulator Control System schedule. Many controls requirements are still not defined well enough for accurate vendor-based quotations. However, making practical assumptions allowed for creating estimates that we feel are significantly better than a wild guess.

Pioneering Science and Technology Office of Science U.S. Department of Energy 5 Undulator Controls : Interface with SLAC While the Undulator Control System will be self-sufficient, there is by necessity a large amount of communication required between the two control systems. -Software - It is expected that the undulator section will be accessible from anywhere within the LCLS control structure. As such, software interfaces will be designed to accommodate such a requirement, while maintaining the integrity of the individual control systems. - To leverage the knowledge of the APS controls group staff and minimize unnecessary effort, the EPICS control system platform was chosen for the Undulator Control System. EPICS has a proven track record in the accelerator (and FEL) community.

Pioneering Science and Technology Office of Science U.S. Department of Energy 6 Undulator Controls : Timing Interface -Timing - Significant effort will be expended in research and design to assure that timing information from the injector is available to the Undulator Control System and Undulator diagnostics. - We envision the design of EPICS compliant timing boards which will reside in both VME and PCI backplanes. These boards will accept the SLC timing messages and output EPICS compatible data for all of the subsystems within the UCS that require timing and time-stamp information. - The SLC aware IOC design will be utilized extensively in the integration of the Undulator Control System.

Pioneering Science and Technology Office of Science U.S. Department of Energy 7 Undulator Controls : MPS Interface -Machine Protection - To protect the undulator components, a machine protection system (MPS) will be implemented along side the Undulator Control System. This system will be responsible for notifying the LCLS injector of a shutdown condition when a (machine oriented) dangerous situation arises.

Pioneering Science and Technology Office of Science U.S. Department of Energy 8 Undulator Controls : “Fine” motion Beam Code + EPICS Time EVREVR CPUCPU AIAI SMCTLSMCTL Motor Controls Wire Position Read-backs Fine Motion Control (strong back cradle motion) Motors Wire Scanners And Motors EVREVR CPUCPU SMSM ADCADC LVDT GADCGADC Motor Controls

Pioneering Science and Technology Office of Science U.S. Department of Energy 9 Undulator Controls : Strongback Motion CAM based platform used for strongback cradle motion -Purpose: Beam Steering and tuning within the intra-undulator space -Servo motors with integrated brake - Reduced power (no holding current) reduces heat load in tunnel - Radiation susceptibility due to integrated electronics - magnitude unknown - Testing at APS to begin during the next run (June 04) - Position feedback via wire position monitors (installed within the Undulator Alignment scope)

Pioneering Science and Technology Office of Science U.S. Department of Energy 10 Undulator Controls : Scanning Wire Arm Scanning Wire Transducer - Using SLAC standard SWA assembly - Stepper motors with rotary encoders - Purpose: Characterize the beam Position Size Shape

Pioneering Science and Technology Office of Science U.S. Department of Energy 11 Undulator Controls : Macroscopic Motion Beam Code + EPICS Time EVREVR CPUCPU SMCTLSMCTL Motor Controls Macroscopic Motion Control

Pioneering Science and Technology Office of Science U.S. Department of Energy 12 Undulator Controls : Macroscopic Motion Rough (Macroscopic) Motion -Motion without encoder feedback - Diagnostic Stage Selection - Translate diagnostic “elevator” Stepper motors Purpose: Select which Diagnostic stage (OTR, SWA, “No-Diagnostic”) is in use at each station - Camera controls - Adjust Focus and aperture for both OTR and inspection cameras Stepper motors Purpose: “Tune” video picture

Pioneering Science and Technology Office of Science U.S. Department of Energy 13 Undulator Controls : Signal Analysis EVREVR BPMBPM CPUCPU BPMBPM BPMBPM BPMBPM BPMBPM BPMBPM BPMBPM EVREVR CPUCPU GADCGADC BPM Pickups Charge Monitors (Toroid) EVREVR CPUCPU GADCGADC Scanning Wires ADCs 3 IOCs Downconverters 33 BPMs 33 IOCs 2 Charge monitors 2 IOCs Beam Code + EPICS Time

Pioneering Science and Technology Office of Science U.S. Department of Energy 14 Undulator Controls : Signal Analysis RF BPM [33 in total - one per break section] -Physics design to be done by SLAC - Detectors (RFBPM) - Front-end electronics (amplification) -Interface with Timing triggers -Physics requirements will determine ADC resolution and conversion rate - expected to be bits at 40MHz - VME backplane -High data rates may necessitate individual processors for each BPM.

Pioneering Science and Technology Office of Science U.S. Department of Energy 15 Undulator Controls : Signal Analysis Charge Monitor [1] -Controls hardware to be designed by SLAC - Toroid and ICT pair -COTS VME based ADC -Interface with Timing triggers Scanning Wire [33] -Hardware to be designed by SLAC - Mechanical Assembly including motors -COTS VME based ADC -Interface with Timing triggers

Pioneering Science and Technology Office of Science U.S. Department of Energy 16 Undulator Controls : Video 11 OTRs Ethernet EVREVR CPUCPU BIBI BOBO DACDAC Lamps & Actuator Cameras Electronics OTR Monitors 7 stations Ethernet EVREVR CPUCPU BIBI BOBO DACDAC Lamps & Actuator Cameras Electronics Observation Video Beam Code + EPICS Time

Pioneering Science and Technology Office of Science U.S. Department of Energy 17 Undulator Controls : Video OTR Stages [11] -Acquire and analyze beam - Position - Shape - Size -30 Hz capture and analysis rate (possibly up to 120Hz in the future) -Large FOV requirement at “reasonable” resolution - Allows digital “zoom” - No need for two camera configuration - Digital interface for frame grabber

Pioneering Science and Technology Office of Science U.S. Department of Energy 18 Undulator Controls : Temperature monitoring Two thermal sensors per each strongback -Used for low data-rate trend analysis and alarms CPUCPU AIAI AIAI AIAI AIAI Strongback Temperature 66 temperatures

Pioneering Science and Technology Office of Science U.S. Department of Energy 19 Undulator Controls : Vacuum control GPIBGPIB CPUCPU 2 gauges BIBI BOBO AIAI AOAO AIAI GP307 IG HP937 CCG 38 ion Pumps Power Supplies 1 exit valve SLAC PMVC RGAs PPS CPUCPU Gauge RGA

Pioneering Science and Technology Office of Science U.S. Department of Energy 20 Undulator Controls : Vacuum control Pump controller interface to control system -Whenever possible, commercial pump controllers will be purchased with standard communications protocols (Serial, Ethernet, etc.). Vacuum gauges -Whenever possible, commercial gauges will be purchased with standard communications protocols (Serial, Ethernet, etc.). RGA -Typically, these devices use embedded PCs as both a user interface and data acquisition unit. Integrating these into the UCS will most likely be done via Ethernet based function calls. Vacuum Valve -Position monitoring only via binary inputs from limit switches.

Pioneering Science and Technology Office of Science U.S. Department of Energy 21 Undulator Controls : Software Control software will be run on the EPICS ‘platform’ -Defines a low level control schema and implies higher-level software. Whenever possible, existing software will be utilized -Software maturity is an important part of creating a stable control system. Re-use / borrow high level apps from other facilities whenever possible High level tools will be installed or written to allow flexible ‘science’ software and support the LCLS community as much as possible without compromising the UCS. -Correlated and consistent operator screens -Data archiving -External software hooks

Pioneering Science and Technology Office of Science U.S. Department of Energy 22 Undulator Controls : Machine Protection System (MPS) Scope needs to be fully defined before details extracted Must interface with Injector to inhibit beam trigger Local (inter-undulator) machine protection may include: -Cherenkov detectors -Motion limit detectors -Vacuum - Pressure - Gas detection - Valve position

Pioneering Science and Technology Office of Science U.S. Department of Energy 23 Undulator Controls : Design documentation It is important to create and maintain system documentation from the beginning of the design process to avoid the “as built” syndrome. In particular, all installed hardware and software will be logged and tracked via ‘live’ tools such as the APS developed IRMIS suite. -Maintain an integrated, comprehensive and searchable database of: - Installed hardware - Control software - Cable - And all interconnections…

Pioneering Science and Technology Office of Science U.S. Department of Energy 24 Undulator Controls : Conclusions Immediate goals -Begin prototyping a video capture system for the OTR diagnostic - Camera choice - Capture options - Software model -Strongback cradle Motion tests - Servo motor radiation susceptibility - Software modeling of five axis motion control -Documentation of controls requirements for ‘high-risk’ tasks - OTR Video - Strongback Motion - BPM Acquisition and analysis