The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities.

Slides:



Advertisements
Similar presentations
2007 CAH HF Program Group 2 Roadmap Next Steps for Phase II January – March 2007 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Engage Internal Stakeholders Plan/Educate.
Advertisements

Bronze Award: Library/Media Center
Design Review Planning to date Project scope summary
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Provide and support mission ready Arctic Warriors from America’s premier Joint Base community 673d Air Base Wing Leadership Update JBER-Richardson Housing.
UO Lewis Integrative Science Building CUG Meeting - Schematic Design Wednesday, October 7.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Ford Hall A New Concept for Liberal Arts Colleges Stylianos Scordilis Occupant Update.
CS Faculty Lunch, March 10, 2008 u Status of Sutardja Dai Hall u Tentative CITRIS Occupancy Plan u Projected Impact on Soda Hall u Proposed Occupancy Plan.
COE Faculty Meeting, Fall 2001 Building Projects and COE Master Plan 2001 Carlo H. Séquin.
CITRIS Building Startup Space Committees Gary Baldwin, Keat Saw, Carlo Sequin, Scott Shackleton Overview and Guidelines December 14, 2005.
Jess Albino FAC CF April 16, 2007 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities Jess.
CITRIS Building Startup Space Committees Carlo Séquin, Gary Baldwin, Keat Saw, Scott Shackleton Design of the “Macro-Lab” February 22, 2006.
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
1 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) Design Ove Dyling Assistant Director for Design Management CFAC Review November 9 – 10,
Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Guiding Principles: –Neo Georgian Aesthetic – Civic proportions –Beautiful – “Wow factor” – distinguished –Campus Great Lawn with outdoor teaching opportunity.
Welcome to UW-BC In 2006, a $6.4 million expansion/renovation project was completed which provided state-of-the-art science labs, high-tech classrooms,
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
LISD Board of Trustees Construction Committee Meeting Tuesday, December 11, 2001.
Schematic design presentation School of Business South Hall Renovation.
Advanced Technology Center Blue Ridge Community College New Construction Project of Distinction Moseley Architects 2012 Exhibition of School Planning and.
Winchester Medical Center Campus Expansion June 21, 2011.
Physical Sciences Complex at the University of Maryland 30sept05 MAPP.
NOAA Center for Weather and Climate Prediction. NOAA Center for Weather and Climate Prediction Construction Pictures December 10, sq.ft atrium.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
Classrooms of the Future: Education Building Renovation/Addition.
St. Cloud High School Phased Comprehensive Construction Project April 28,
ASSIGNMENT. Luanda, Angola Latitude: 8° 50' 18 S Longitude: 13° 14' 4 E.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
The U.S.S.E Team #4 Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz Antonio F. Alvarez Miguel A. Rivera Jose L. Gamboa Janice O. Cruz.
West Contra Costa Unified School District Long-Range Facilities Master Plan West Contra Costa Unified School District Long-Range Facilities Master Plan.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
Building for the Future of Education: Propositions S and N
Jan 2016 Solar Lunar Data.
GVSU Case Study Analysis of HVAC filter using MERV 13 filter with low pressure drop design. 1.
Joint Classroom Steering Committee Report
INDOOR BASEBALL / SOFTBALL FACILITY
Centralized Classroom and Event Scheduling: Spring 2019
Airport Air Quality Study Update
Minuteman Vocational Technical Regional High School Progress
Carleton College Summer 2018 Science and Campus Construction Plan
CITRIS Building Projects
Mississippi Riverbank Project (Final Presentation) May 14, 1999
Minuteman Vocational Technical Regional High School Progress
PBIS Update November 2005.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
PBIS Update October 2005.
416 UA College of Pharmacy Skaggs Building Addition and Renovation
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
The Anschutz Health Sciences Building Construction Update 8 April 2019.
Minuteman Vocational Technical Regional High School Progress
Multi-Family Fourplex Apartment
Facilities Inspected Facility Parking Map Reference Comments
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
PBIS Update January 2006.
26 Oct 2017 – May 2019 Well water level monitoring data
Presentation transcript:

The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities u High-tech Classrooms u Interdisciplinary Research Space u A new focal point for COE Integrate with COE Master Plan 

Sutardja-Dai Hall & Marvell Lab u A Brief review of the construction

Demolition of Old Davis Hall Sept. 2004

Excavation (next to Cory Hall) Excavation (next to Cory Hall) Dec. 2004

A Big Hole … 5/ /2006

A Crane, 190 feet tall, Aug. 2006

View from the Top (Shackleton, Séquin)

The Steel Frame Starts to Grow Oct. 2006

Wall Constructions, Dec. 2006

Concrete Pour, Feb. 2007

More Steel … Much More!

Topping-out Ceremony, March 2, 2007 u Honoring Dean A. R. Newton ( )

Roof and “Penthouse” Construction

Hanging GFRC Facade, Aug. 2007

Waffle Slab for Marvell Lab, Oct. 2007

Topping-out the Marvell Lab, Dec. 2007

Marvell Lab, Jan. 2008

Terrace at Level 6, next to Davis Hall, Feb. 2008

Hoisting a Big Air Handler, Mar. 2008

Sutardja-Dai Hall & Marvell Lab u A look of what is going on inside

Level 1: Computer Room

Level 1: Corridor

Level 1: Future “Macro-Lab”

Level 1: Utilities under Marvell Lab

Level 2: Machinery under Marvell Lab

Level 2: Peet’s CyberCafe

Level 2: Distance Learning Rooms

Level 2: Atrium Stairs

Level 3: Atrium

Level 3: Auditorium

Level 3.5: Lower Marvell Lab u (Photolithography)

Level 3.5: Marvel Lab (Air Filtration)

Level 4: Carrel Space (West)

Level 5: Carrel Space (East)

Level 5: Lab Administration

Level 5: Upper Marvell Lab u (Diffusion Furnaces)

Level 6: Terrace

Level 6: Bridge to Cory

Level 6: Lounge

Level 6: Lounge (and view)

Level 6: Carrel Space (East)

Level 7: Carrel Space (East)

Level 7: Carrel Space (West)

Level 7: Carrel Space (East)

Level 8: Roof (March 2008)

Roof (April 2008)

Roof: Air-Handler Maze

Level 9: View of Marvell Lab Roof (Mar. 2008)

Marvell Micro- Nano-Lab

Equipment Replacement Bay

CITRIS Davis Hall (CEE) Cory Hall (EECS)

Sutardja-Dai Hall, April 10, 2008

Sutardja-Dai Hall: Status Summary u It is real u It is on schedule u Move-in starts January 2009 u Grand opening on March 6, 2009 u Initial occupancy is being finalized now...

Initial Occupancy (tentative) -- Phase 1 Move-in u F7: AI, Robotics, Machine Learning u F6: MEMS Applications, Sensors & Control u F5: Micro- & Nano- Device Technology u F4: Design, New Media, Human-Computer Interface u F3: CITRIS & GLOBE administration; Auditorium. u F2: CyberCafe, Seminar rooms, 24-7 IT room. u F1: Computer room, Macro-Lab, Motion Capture.