Upstream PID Review at CM16 A.Bross VC September 13, 2006.

Slides:



Advertisements
Similar presentations
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Advertisements

TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
1 PeopleSoft Financials version 8.8 Coming Soon. 2 When will the Conversion Happen? Target Date – November 9, 2005 Target Date – November 9, 2005 Several.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
LC Training for RDA: Resource Description & Access Module 5: Authorities I Part 2: RDA Documentation Cooperative and Instructional Programs Division Library.
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
Project manager report paul drumm CM16 October 2006.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
CSE9020 Schedule, / 1 The Suggested Schedule Week Content/Deliverable 1. 4/3Unit Overview, Project Description, Meetings, Group Formation 2. 11/3Project.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
MME-562 Seminar: Issues in Mathematics: Using Advanced Educational Technology to support Data-Driven Decision Making.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
18 December, 2007 Analysis PC 18 Dec PIDer’s Question of Friday 14 Dec: Dear John and Marco, would you be able to give us a first preliminary ball-park.
OHT – HL7 Charter HL7 Tooling Project – Status Report 9 th December 2008 Ravi Natarajan Ken Lunn NHS CfH.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
ATIA 2009 Orlando Strand Managers Call October 6 and October 13 Hosts: Ariane Jaskolka, Senior Education Coordinator, ATIA Headquarters Caroline Van Howe,
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
UCAS 2015 Priestley College Key dates College Process.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
Communication activities
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE news video conference 15 march MICE NEWS 1.TOF0/1/2 funding 2.MICE Installation/Commissioning/Operations group (MICO) 3.Important issues from.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
Status of the MICE Construction Project
Accelerator R&D for Future Neutrino Projects
Chris Rogers, ASTeC, Rutherford Appleton Laboratory
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Collaborations in TB Care and Control: Professional Associations and TB Control Programmes No more than 2 pages The setting: brief description of setting,
1115 Transformation Waiver
UCAS 2018 Priestley College
Project Plan MS Project Example (Optional)
Overview Cost to Complete
Meadows Fence Replacement
Change Tested or Implemented
Lunar Calibration Workshop Status of the preparation
Presentation transcript:

Upstream PID Review at CM16 A.Bross VC September 13, 2006

PID Review  We will review the upstream PID systems (TOF 0/1 and CKOV) at CM16  Dates – October 12 and 13  The agenda will be posted on the CM WEB site and an upload area for support documents for each of the systems will be available u With Marco’s help  Support documentation should be uploaded by September 29 th  Format for each of the sub-systems u Overall description of systems u Cost and Schedule u Risk Analysis s See TB page for template s See Tracker Module page for an example how one group has done it u Discussion  Plus simulation work, magnetic shielding and installation  Review Committee u Bross (Chair), Edgecock, Murray, Soler, Virostek, Drumm (ex-officio)

Agenda

Planning for Downstream PID  There are still a number of uncertainties regarding the downstream system u Transverse Size u Cal implementation (lead-fiber vs. fully active) u Funding  However, we would still like to plan for a review of this system towards the end of November or early December  The likely venue is INFN, Frascati  More to come