Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements.

Slides:



Advertisements
Similar presentations
Randy A. McClay, P.E., CSP Exran Consulting
Advertisements

Summer Projects Patrick Willoughby Maintenance Engineering.
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Williston Basin Petroleum Conference North Dakota May 22, 2012 Recycling of Drilling Waste: The Road to Sustainability Emerging Bakken Technologies.
Drilling Rigs & Equipment
Drilling Engineering – PE311 Circulating System
Innovations in drilling DAP 2015
Marketing Presentation Page 1 Pareto Securities’ 15th annual Oil & Offshore Conference September 10, 2009.
Training in GSP New approach Who is GSP? Established in member of UPETROM Group HQ located in Constanta Port, Berth 34 Activity: offshore drilling,
Crane Operations Objective
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE.
PETROLEUM ENGINEERING 411
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
THRUSTMASTER HOUSTON, TX Largest Thruster Factory In the World
GEOTHERMAL DRILLING James C. Witcher Witcher and Associates
Cranes, Derricks, Hoists, Elevators, & Conveyors for Construction
BASIC MUD LOGGING.
By: Group Group Memebers: Wang Jiale 1O3 (leader) Daryl Chionh 1O3 Daniel Hong 1O3 Michael Liu 1O3.
Case Study – Reducing Drilling hours by up to 54% in the Barnett Shale Douglas Gust P.Eng., Q’Max Solutions Inc. Scott Marquess, Q’Max Solutions Inc. Lane.
Fire Safety. Introduction and Unit Overview The role of CERTs in fire safety:  Put out small fires.  Prevent additional fires.  Shutoff utilities 
INNOVATIONS IN DRILLING DAP 2015 MAARTEN MIDDELBURG FEBRUARY 25, 2015 DELFT.
District Energy Corporation Sustainable Project SW 40 th Thermal Energy Facility To Serve the New Lancaster County Adult Detention Facility April 2011.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Lesson 25 Well Control, cont’d
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Drilling Rig URB-10-2SH property of. 2 “INNCOR” Company Presents multipurpose drilling rig “Buran” URB-10-2SH, for the first time designed by the method.
“Uralmash Oil and Gas Equipment Holding” LLC
Presentation By Dr.Muhammad Salim Site Incharge Underground Coal Gasification, Project Thar.
Compressors, Fans And Blowers Blowers Compressors, AirAir Gas Gas Centrifugal FansAir Washing, Exhaust Turbo- Expander Drivers Engines - DieselDiesel,
“DRILLING” MIDDLE EAST TECHNICAL UNIVERSITY
Lesson 17 KEEPING WATCH. WATCHKEEPING 4 STCW 1978 (1995) 4 Watch (1) time period; (2) personnel 4 Personnel: Engineer officer in charge (watchstanding.
FIRE SAFETY Introduction and Unit Overview The role of CERTs in fire safety:  Put out small fires.  Prevent additional fires.  Shutoff utilities 
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Drilling crew Авторы: А.В. Епихин ассистент кафедры бурения скважин, О.С. Ульянова, доцент кафедры ИЯПР Томск-2015 г.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Western Cape.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
Visual 2.1 Introduction and Unit Overview The role of CERTs in fire safety:  Put out small fires.  Prevent additional fires.  Shutoff utilities  Assist.
NFPA 2 Overview Susan Bershad, Staff Liaison, NFPA.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
P.8 -Deepwater Horizon accident A summary of the accident report and its consequences Source: USA review for improvement of MODU code rules 19 dec 2014.
T o t a l s u b s e a s o l u t i o n s AB-X-PR Subsea 7 Inc. Results for First Quarter April
Design Manufacture Service Electrical Rental. About Us ITC was established in 1999 providing an onsite hydraulic service to the offshore, subsea, agricultural,
Chapter 4. 1 The engine does start on air, but combustion does not immediately begin. What is the possible cause? Low air compression , failure in the.
Gantry Crane Gantry Crane  Rosava Engineering Group presents the Gantry Crane. We provide cranes.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Crane, Conveyor, and Rigging Part I - Crane OSHE 112, Spring 2016
PROCEDURE OF SKYTOP AC-SCR RIG HANDLING
SUSTAINABLE DRILLING OF OIL & GAS WELLS
The Best Quality… The Best Company… PT. Jinwoo Engineering Indonesia
SBS- Counterweight Support and Magnet Assembly - Status
Introduction and Unit Overview
2013. Company Overview 1.
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Status of the cryogenic system for B180
Subsea 100 Global Services Products Presentation
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
يوم السلامة 2012 اقتطع وقتا للسلامة.
SAFETY LEADERSHIP FOR FRONTLINE SUPERVISORS
Suryoday Technologies ISO 9001:2015 Co.
Firefighting equipment
Introduction and Unit Overview
Safety Fabrication, assembly, and installation
Liquid Drainers for the Upstream, Mid-Stream, Down-Stream HPI
Introduction and Unit Overview
Presentation transcript:

Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements and goals easily and according to the global standards and specially API standards and in time although the time provided to it is limited and critical. Projects

Why we start any project? Why we start any project? There are many points that could lead to start a project There are many points that could lead to start a project 1. The company's expansion, by starting up a new rig. 2. The company's equipment upgrading, by installing a new equipment. 3. Modification done to simplify and assist the operation of the rig and make it comply with the global standards, especially API standard. 4. Problems facing operation or maintenance crew due to breakdowns Engineering department does believe that project planning is the key to succeed any project; projects can run on time and interact effectively with both operators and suppliers. Everyone involved understands what is wanted and emerging problems are foreseen (and dealt with) long before they cause damage. Engineering department does believe that project planning is the key to succeed any project; projects can run on time and interact effectively with both operators and suppliers. Everyone involved understands what is wanted and emerging problems are foreseen (and dealt with) long before they cause damage. Project planning Rig in time &Safely Professional personnel All Materials Needed The Time Frame EXCUTE SELECT ISSUE Plan

Projects done New rigs & Refurbishing old rigs 2-1 Top Drive & new equipment installation 2-2 Equipment overhaul 2-3 In progress projects 2-4

Rig up project for the following rigs: Rig..………………………………………start operation Rig..………………………………………start operation ST# 1 (2000 HP)……………………………January,2006 ST# 2 (1500 HP)…………………………....January,2006 ST# 3 (2000 HP)……………………………January, 2007 ST# 4 (2000 HP)……………………………September,2007 ST# 5 (1500 HP)…………………………..April,2008 ST# 6 (1500 HP)…………………………..End of April,2008 ST# 7 (1000 HP)…………………………..July,2008 ST# 8 (1500 HP)…………………………..June,2008 ST# 9 (2000 HP…………………………...March, 2008 ST# 10 (1500 HP)……………………….....End of June,2008 ST# 11 (2000 HP)……………………….....End of Oct.,2008 ST# 12 (2000 HP)………………………….Febrauary,2009 ST# 21 (650 HP-work over)………………January, 2007 ST# 22 (650 HP-work over)………………November,2007 ST#23 (650 HP-work over)………………End of March,2008 ST#24 (650 HP-work over)………………End of August,2008 Sinotharwa Rigs 2-1

Rigs Refurbishing St1 Refurbished, April 2007 Upgrade the rig (Mast, substructure sandblast including MPI) Mud System modification & upgrading upon the operator needs & operation demands

Rigs Refurbishing St2 Refurbished, December 2007 Modify the Rigs (Mast, sub base sandblast steel fabrications, renew rig floor including MPI) Fabricated high pressure mud pump lines & standard standpipe manifold

Top Drive & new equipment installation 2-2 Reduce man power Eliminates the hazard of Drilling operation No need for traditional Kelly Drill complete stand Reduce the Drilling time By 30% Reasons to use Top Drive over classical drilling equipment 2-1) Top Drive

Install the Top Drive on the following Rigs: (Varco TDS-11SA) ST#1,3,4,5,6,8,12 (Tesco ECI900 ) ST#9,10,11 So we

Install H2S & LEL system on all rigs Man Rider Installation for all rigs Install new alarm panels for main engines Install Fuel Purifier on all rigs New installed equipments Install SCR CO 2 fire fighting system on all rigs Isolate all engines exhaust pipe manifolds

ST#1,9 Complete overhaul for the Power Tong ST#2 Top end overhaul for the ShanDong power engine Complete overhaul for the ShanDong power engine ST#5,7 Complete overhaul for the Air hoist 5 ton Equipment overhaul 2-3

ST#10 Complete overhaul for the Crown Block ST#1,21 Complete overhaul for Mud Pump

In progress projects ) Jack Up rig Start fabrication : By End of year 2008 Electrical Rig,VFD system MAST 170 ft clear height Rotary table 49 ½ ” TDS -8SA top drive system Drawworks power: 4600 HP. Operating water depth: 400 ft (122 m). Drilling depth: ft (9,144 m). Quarters capacity: 120 persons. 3 -Mud pumps 2200 HP. Power system of 5 Cat Engines ( 3516B) & 1 Emergency Cat Engine (3512). Three pedestal cranes with 120 ft (36.6 m) boom. Horizontal & vertical pipe handling systems. Three lifeboats (60 person each). Four life rafts (35 persons each). Cascading shaker system & 1 vacuum degasser. Storage of 4,720 bbls fuel oil. Storage of 10,540 bbls drill water. Storage of 2,180 bbls potable water. Storage of 15,800 tons preload ballast. Storage of 17,400 cu.m bulk mud/cement. Storage of 3,960 bbls active & reserve pits sack storage.

2-4-2) Badr yard 2-4-2) Badr yard Badr yard is one of the expansion projects that our company is looking forward to complete as soon as possible. Badr yard will play a very big role for the engineering department which will deduct the outsourcing and hiring cost of workshops to make overhauls in.