Bagby/Mulhearn 7.26.05 L1_Cal Int/Comm Team  Daily Toolbox meetings DAB1 u Links for updates s Schedule: Tasks for Review –http://d0server1.fnal.gov/users/bagby/www/L1_Cal/Minut.

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

A+ Certification Guide
Experts in the art of firmware. Our Values USA Firmware Value's Statement R.PACT with our Employees, Customers and Partners We hire and reward employees.
U.S. Department of Transportation Federal Highway Administration ACS-Lite FHWA Adaptive Signal Control Systems Raj S. Ghaman, P.E. Team Leader, Office.
Morning – 9am Getting Started Agile Manifesto Values & Principles Scrum Framework ~~ 10:40 to 11:00 Break ~~ Scrum Roles Backlog Grooming Estimation.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
This courseware is copyrighted © 2011 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
Improving Process for Better Software. Who We Are An experiential learning program that provides technology solutions for our partners, and real- world.
I-heliostat 6/30 update Amy Whitcombe, Kendall Pletcher, Eric Kolker, Kiefer Hicks.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Bagby/Mulhearn L1_Cal Int/Comm  The L1_Cal Integration and Commissioning team has a new schedule based on the Review Committee’s charge and Dan’s.
H. EvansRun2b L1Cal Meeting: 03-Oct-021 Nevis Design Status: Summary Hal EvansColumbia University Trigger Algorithm Board –Done  Jet, EM & Tau Sliding.
FIC R.Bernard, J.F.Renardy DSM/DAPNIA/SPP. Saturday, February 6th. Level 2 Review 2 Requirements èBridge between G-Link from central trackers and standard.
Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)
H. EvansRun IIb L1Cal Meeting: 1-May-031 Goals of the Summer Integration Test Summer Integration Schedule –16-Jul-03 – 8-Oct-03 Test Infrastructure –what.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
EE400D DOCUMENTATION INSTRUCTIONAL SERIES MEETING MINUTES.
Release & Deployment ITIL Version 3
Introduction to the Common Electrical Interface (CEI)
ICS – Software Engineering Group 1 The SNS General Time Timestamp Driver Sheng Peng & David Thompson.
Travel Website Enhancement Project Project Update First Name Last Name.
Controls for High-Availability Magnet PS’s for ATF2 Glen White SLAC September
CHEMS ANNUAL TRAINING Topics For Today CHEMS CHEMSPRO.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
8 th Grade School Year Norman S. Edelcup Sunny Isles Beach K-8.
Project Status Report Presenter Name Presentation Date.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
25 October Run IIb Director’s ReviewAlan L. Stone - Univ. of Illinois - Chicago1 Run IIb L1 CAL Installation Constraints Transition System Cabling.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
1 Monitoring and Evaluating Employee Wellness Programs.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
BROOKHAVEN SCIENCE ASSOCIATES Advanced Monitor/Subscription Mechanisms Ralph Lange EPICS Collaboration Meeting October 11, 2009.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
Tell1 status: firmware Stéphane T’Jampens Nicolas Dumont Dayot Presented by Bolek Pietrzyk Calo commissioning session - 16 January 2008.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Marc Kelly, Maurice Goodrick, Bart Hommels CALICE / EUDET DAQ – DESY CALICE (ECAL) / EUDET DAQ: DIF and LDA Status.
Project Control n How do I spot problems? n What do I do once I find them? n How do I stay on track? n What happened to my plan? n How do I stay flexible?
Status Report #8 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
To improve home wireless network speed Find the Perfect Spot for Your Router For best Wi-Fi coverage, the wireless router needs to be placed in.
PROGRESS REVIEW 1 Team Aware Amit Agarwal, Harry Golash, Yihao qian,
CompTIA Server+ Certification (Exam SK0-004)
Update on CSC Endcap Muon Port Card
IEEE Std 1074: Standard for Software Lifecycle
Brother Printer technical support toll-free helpline ( )
Call to Fix HP Printer Installation Error Code 1603
Easy download driver from
D I s , a ·.... l8l8.
Progress on L1Cal at Nevis
Communications channels تقديم المهندس سنان محمد حسن
CPM plans: the short, the medium and the long
CC DEVELOPMENT PROGRESS and SCHEDULE
Final Presentation Wireless mouse over BLUETOOTH By: David Gabay
Before During After Follow-up Resolve Review Pre-review Familiarize
I ll I
Operational procedures for preventing misuse
' 1 A ./.\.l+./.\.l

Presentation transcript:

Bagby/Mulhearn L1_Cal Int/Comm Team  Daily Toolbox meetings DAB1 u Links for updates s Schedule: Tasks for Review – es/Daily_Toolbox/Schedule.pdf s Daily Plan: Progress – es/Daily_Toolbox/Daily_Plan.pdf u Everyone at Fermilab working on L1_Cal should attend this VERY short meeting.

Bagby/Mulhearn Status  ADF  TAB u Transition Parity Test write-up available by Rahmi. s ocs/ADF_TAB_Parity.pdf u Focusing on synchronization.  TAB  L2/L3 u “g-link” errors to L2 resolved. s SCL/VME driver, VTM, noisy Ch0 EOFL (word error) s Now looking at GOFL (protocol errors) u Investigating VRB application firmware to establish BER.  GAB  L2 u No transmission errors detected.

Bagby/Mulhearn Status  WIENER  EPICS u Hardware available for GUI work.  Transition System u Investigating ACT FP spacing. u Several full channels tested w/MSU tester. s Establishing testing procedure. u Glenair test set-up s Card is in house. Awaiting tool for press fit connector.  ORC u AC Distribution done. Working on DC.