1212 / t 1 A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS Henny P.G. van Ooijen J.Will M. Bertrand.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Strategic Decisions (Part II)
Capacity planning and control
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Scheduling Chapter 19.
STCPM title A model of bank price and nonprice competition with endogenous expected loan losses Filipa Lima Paulo Soares de Pinho Emerging Scholars in.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Chapter 7 Dynamic Job Shops Advantages/Disadvantages Planning, Control and Scheduling Open Queuing Network Model.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Optimization Using Matrix Geometric and Cutting Plane Methods Sachin Jayaswal Beth Jewkes Department of Management Sciences University of Waterloo & Saibal.
Presented by: Fadhila MICHAEL C. NAUGHTON. Purpose  Develop and demonstrate a method for deriving and testing regulatory preferences within and across.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Part III Performance evaluation and design of manufacturing systems.
Financial and Cost-Volume-Profit Models
Efficient Scheduling of Heterogeneous Continuous Queries Mohamed A. Sharaf Panos K. Chrysanthis Alexandros Labrinidis Kirk Pruhs Advanced Data Management.
Platzhalter für Bild, Bild auf Titelfolie hinter das Logo einsetzen Ann Melissa Campbell, Jan Fabian Ehmke 2013 Service Management and Science Forum Decision.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Column Generation Approach for Operating Rooms Planning Mehdi LAMIRI, Xiaolan XIE and ZHANG Shuguang Industrial Engineering and Computer Sciences Division.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Modeling & Simulation What can they offer? March 28, 2012 Ottawa, ON Waiting Time Management Strategies for Scheduled Health Care Services: A Workshop.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Coordinating Failed Goods Collecting Policies and Repair Capacity Policies in the Maintenance of Commoditized Capital Goods Henny P.G. van Ooijen J. Will.
Simulation Based Production Planning, Scheduling, and Control Johannes Krauth Sim-Serv.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Cost drivers, cost behaviour and cost estimation
Operations Management Operations Scheduling
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Homework Assignment Job Shop Scheduling MGMT E Operations and Logistics Operations and Logistics Management Management ACME TOOL & DIE, Inc. Due.
S I M U L A T I O N M A R K E T I N G M G T.. S I M U L A T I O N M A R K E T I N G M G T.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Lead-Time and Price Quotation Oğuz Atan. Introduction Technological developments & Globalization Competition in business Customer satisfaction Introduction.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
1 Forecasting, Planning and Scheduling
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Flows and Networks Plan for today (lecture 6): Last time / Questions? Kelly / Whittle network Optimal design of a Kelly / Whittle network: optimisation.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
Towards Robust Revenue Management: Capacity Control Using Limited Demand Information Michael Ball, Huina Gao, Yingjie Lan & Itir Karaesmen Robert H Smith.
AXUG Partner Showcase – Introducing Preactor
Inputs and Outputs to Aggregate Production Planning
For Products and Services
CHAPTER 8 Operations Scheduling
Operations Management
NATCOR Stochastic Modelling Course Inventory Control – Part 2
assemble-to-order (ATO) A system that produces standard modules to be
Chapter 6: CPU Scheduling
13 Aggregate Planning.
CPU Scheduling G.Anuradha
Module 5: CPU Scheduling
Chap 11 Learning Objectives
Most Basic Principle Guiding Your Decisions-- will it: Increase Demand for Product Decrease Cost of Making & Marketing Product.
Dr Sh Salleh bin Sh Ahmad
Chapter 6: CPU Scheduling
Capacity Planning For Products and Services
Chapter 6: CPU Scheduling
Chapter 6: CPU Scheduling
Load forecasting Prepared by N.CHATHRU.
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

1212 / t 1 A SHORT TERM CAPACITY ADJUSTMENT POLICY FOR MINIMIZING LATENESS IN JOB SHOP PODUCTION SYSTEMS Henny P.G. van Ooijen J.Will M. Bertrand

1212 / t 2 Overview Introduction Literature review Research question Policy for capacity adjustment Evaluation Future research

1212 / t 3 Introduction Job shop (functionally organized work centers) –Dynamic, stochastic arrival pattern –Stochastic behaviour on the shop floor Highly fluctuating throughput times => Poor performance Fixed lead times –“Adjust” demand –Adjust available capacity Small change of capacity => big impact on the performance Setting cost optimal due dates –Prediction of throughput times

1212 / t 4 Literature (I) Palaka et al. –Customers sensitive to quoted lead times (fixed capacity/ marginal expansion) So and Song –Demands are sensitive to both price and delivery time (optimal setting of price/delivery time/capacity expansion) Ray and Jewkes –Demand is function of delivery time and price, and price is a function of delivery time

1212 / t 5 Literature (II) Barut and Shridharan –Allocation (dynamically) of capacity to multiple product classes Van Mieghem –Review strategic capacity management literature Setting capacity levels on medium or long term for “average” orders, based on average lead times and/or average delivery reliability

1212 / t 6 Research question Given fixed, realistic short, lead times, and given dynamic, stochastic demand, then how can we obtain an (economically justified) as high as possible delivery reliability?

1212 / t 7 Research question Given fixed, realistic short, lead times, and given dynamic, stochastic demand, then how can we obtain an (economically justified) as high as possible delivery reliability? ADJUST THE CAPACITIES AROUND A GIVEN LEVEL

1212 / t 8 Research question Given fixed, realistic short, lead times, and given dynamic, stochastic demand, then how can we obtain an (economically justified) as high as possible delivery reliability? ADJUST THE CAPACITIES AROUND A GIVEN LEVEL HOW MUCH?

1212 / t 9 Research question Given fixed, realistic short, lead times, and given dynamic, stochastic demand, what can we do to obtain a (economically justified) high delivery reliability? ADJUST THE CAPACITIES AROUND A GIVEN LEVEL HOW MUCH? Estimate the lateness given certain capacity levels

1212 / t 10 Forecasting throughput times (I) Empirically constructed routing normalized waiting time distribution functions F g (.) per order category g Upon arrival an order with g operations and a required reliability of  gets due date:

1212 / t 11 Forecasting throughput times (II) In this research: Estimate of remaining waiting time of an order with g remaining operations, reliability  :

1212 / t 12 Policy for capacity adjustment (I) If n tj is the actual load at a certain work center j at time t, then the total expected lateness is:

1212 / t 13 Policy for capacity adjustment (II) Conjecture: the load at a certain work center can be interpreted as load in relation to the installed capacity “Adjusting” the load can be done by adjusting the capacity.

1212 / t 14 Policy for capacity adjustment (II) Conjecture: the load at a certain work center can be interpreted as load in relation to the installed capacity “Adjusting” the load can be done by adjusting the capacity.

1212 / t 15 Policy for capacity adjustment (III) We assume : Capacity costs for adjusting the load with 1 unit is equal to c 1 ; lateness costs is c 2 per unit late.

1212 / t 16 Policy for capacity adjustment (IV) After some rewriting this leads to an equation of the form: This is a Constrained Least Squares problem

1212 / t 17 Evaluation Simulation study –Ideal job-shop; 5 work centers; 90% utilization; First Come First Serve –Capacities can be varied weekly or monthly –The same lead time for all orders/Different lead times for orders of different categories

1212 / t 18 Future research Evaluation study How to determine capacity adjustment costs How to find the empirical distribution functions Other priority rules