Hamid Shoaee LCLS Facility Advisory Committee April 2007 1 Control System Overview April 16, 2007 Hamid Shoaee for the LCLS Controls.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Hamid Shoaee Control System Installation 3/16/ Downtime Readiness Review Hamid Shoaee For LCLS Controls Group.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview October 12, 2006 Hamid Shoaee for the LCLS.
Robert C. Sass Facility Advisory Committee April XES Controls/DAQ 1 AMOS/LUSI Controls and Data Acquisition LCLS eXperimental End Stations (XES)
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Plans for 2006 Installation April 20, 2006 Injector commissioning.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
The recent history and current state of the linac control system Tom Himel Dec 1,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Hamid Shoaee LCLS Facility Advisory Committee October Control System Overview Hamid Shoaee for the LCLS Controls Group.
ATF/ATF2 Control System
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF and Beam-based Longitudinal Feedback Readiness
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
Linac Diagnostics Commissioning Experience
2007 Downtime Controls Installation
Control System Overview Hamid Shoaee LCLS Control System Manager
Low Level RF Status Outline Overview showing hardware instances
Outline Goals & Commissioning Schedule
Breakout Session: Controls
LCLS e- Beams System Overview
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
LCLS Control System Personnel Linac & BC2 Controls progress
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Hamid Shoaee LCLS Facility Advisory Committee April Control System Overview April 16, 2007 Hamid Shoaee for the LCLS Controls Group Outline Injector control system installation & commissioning Status update Linac & beyond Summary

Hamid Shoaee LCLS Facility Advisory Committee April Accomplishments in the past six months Field installation of large amount of cable plant, networking, racks, electronics and software for injector control Development of detailed plans for linac and BC2 installation Coordination and re-planning of undulator control with ANL Development of a conceptual design for X-ray End Stations DAQ and Controls AIP projects for MCC networks upgrade, LCLS MPS and Linac BPM Starting the design of next generation applications software

Hamid Shoaee LCLS Facility Advisory Committee April The main focus in the past six months has been the installation and commissioning of the injector Controls Installation of the cable plant including trays, long haul DC and I&C cables, terminations, etc. Phase 1 (Apr. ’06 thru Jun. ’06) Phase II (Aug. ’06 thru Dec. ’06, including Christmas holidays) Final terminations were occasionally delayed pending mechanical installations Installation of the electronics racks, loading of crates, electronics chassis, modules, and intra-rack wiring Installation of the Controls software on the front-end computers (IOC) and production servers

Hamid Shoaee LCLS Facility Advisory Committee April Phase II Installation Scope - Gun to TD11

Hamid Shoaee LCLS Facility Advisory Committee April MCC, Networks, Servers, & Workstations Production Systems Delivered Networks at S20 RF Hut & MCC: physical and wireless LCLSDMZ, LCLS private, wireless MCC infrastructure upgrade: power & racks LINUX Servers for applications and EPICS data archiving Control Room Linux Workstation MCC and S20 Laser Room are actively in use for commissioning

Main Control Center is in full operation

Hamid Shoaee LCLS Facility Advisory Committee April All LCLS Safety Systems Are Operational Laser Safety System (LSS) Was needed early to allow laser commissioning PPS Passed many reviews by internal and external reviewers, citizens committees The FIRST SLAC programmable PPS is online and operational BCS Prevents radiation from ‘escaping’ the shielding enclosure Direct measurements of radiation or beam loss Protection of safety-critical collimators and stoppers The need for BCS was identified late, and the system had an aggressive schedule, but was completed and certified in time for ARR approval

Hamid Shoaee LCLS Facility Advisory Committee April Safety Systems – MPS Interim MPS Using existing linac infrastructure (1553 MPS) Adding new signals and devices for LCLS Interim MPS will be used for gating beam Single Shot Mode Burst Mode Pockels cell and MPS mechanical shutter limit laser rate on cathode LCLS MPS (presentation at break out) Will be used to protect the undulator and photon sections Held conceptual design review, now proceeding to detailed design

Hamid Shoaee LCLS Facility Advisory Committee April Controls Sub-Systems installed Cable Plant, Racks, etc. Networking MCC infrastructure Magnet power supply Vacuum Controls LLRF Timing Laser control Laser alignment OTR/YAG image acquisition BPM Toroid Wire Scanners Faraday Cup Cerenkov monitor Moveable collimator BC1 beamline control Bunch length monitor LSS PPS MPS BCS Gun Temp stabilization Image management Online Models MATLAB interface

Hamid Shoaee LCLS Facility Advisory Committee April …and arriving soon BPM acquisition through SCP (SLC-AWARE IOC) Orbit fitting

LCLS Controls Home Screen Schuh Norum

Hamid Shoaee LCLS Facility Advisory Committee April Graphical displays help with identifying components

Magnet Controls

Hamid Shoaee LCLS Facility Advisory Committee April Magnet software tested & in production

Hamid Shoaee LCLS Facility Advisory Committee April Vacuum System has been in operation over one month with signal in data archiving

Hamid Shoaee LCLS Facility Advisory Committee April Wire Scanner Control D. Murray

Hamid Shoaee LCLS Facility Advisory Committee April Movable Beamline successfully exercised this weekend

Hamid Shoaee LCLS Facility Advisory Committee April Injector LLRF Work Completed Linac Sector 0 RF Upgrade All 3 RF Chassis completed and Installed Sector 20 RF distribution system - Phase and Amplitude Controllers (SPAC) - Operational Phase and Amplitude Detectors (PAD) - Operational Phased Locked Oscillator – Use SPPS unit for Turn On LO Generator - Operational Multiplier – 476MHz to 2856MHz - Operational 4 distribution chassis - Operational LLRF Control and Monitor System 1 kW Solid State S-Band Amplifiers – 5 units PADs – 6 Klystron units in Fabrication PADs – Gun, L0A, L0B, L1S –Operational PACs – Gun, L0A, L0B, L1S –Operational Beam Phase Cavity Pill box cavity with 2 probes and 4 tuners – Complete R. Akre D. Kotturi

Hamid Shoaee LCLS Facility Advisory Committee April S-Band Ref System Laser Gun L0 (A&B) L1-S Operational Phase & Amplitude Detectors

Hamid Shoaee LCLS Facility Advisory Committee April S-Band Reference System Laser Gun L0-A L0-B L1-S Operational Phase & Amplitude Controllers

Hamid Shoaee LCLS Facility Advisory Committee April Monitoring front end computers (IOC)

Hamid Shoaee LCLS Facility Advisory Committee April The injector laser stabilization system includes two feedback loops The first loop includes two mirrors, each with two actuators and one camera. It stabilizes laser traveling through a 10-meter tube The second loop includes one mirror with two actuators and adjusts the laser position on the cathode. The IOC reads the image from camera, calculates the laser’s position error and applies a correction to the actuators. The loop 1 Hz, and the camera is synced to 120Hz. Injection Laser Control System

Hamid Shoaee LCLS Facility Advisory Committee April Timing System ~ Linac main drive line FIDO E V G SLC MPG PNETPNET 119 MHz360 Hz SLC events LCLS events PNETPNET PP STBSTB EVREVR OCOC TTL-NIM convert. LCLS Digitizer LLRF BPMs Toroids Cameras GADCs Old klystrons TTL SLC Trigs OCOC Break out talk

Hamid Shoaee LCLS Facility Advisory Committee April Timing System Progress since October, 2006 Completed Installation in sectors 20 and 21 Commissioning is in progress Finished hardware bench testing Finished PMC-EVR driver EVG sequence RAM programming at 360Hz Timestamp distribution on the EVR IOCs Completed cabling plans and documentation Completed beam-synchronous acquisition

Hamid Shoaee LCLS Facility Advisory Committee April The injector design optics model is now available online

Hamid Shoaee LCLS Facility Advisory Committee April MCC Applications & Infrastructure Configuration management (save & restore) Alarm management Error Logs Data archiving Correlations plot Buffeted acquisition Online model Artemis problem tracking Operations and Physics E-logs The SLC-aware IOC provides beam synchronous data to Buffered Acquisition and Correlation Plots from a number of sources AIP network upgrade at MCC for gigabit traffic to support digital control room

Applications provided in MATLAB Image Management Bunch Length Measurement Emittance and Energy Application

Hamid Shoaee LCLS Facility Advisory Committee April Linac & BC2 Controls Installation (Fall ‘07) BC2 installation, similar scope to BC1 Very little engineering development The biggest challenge is meeting the schedule The scope includes Extending the new timing system Safety systems (MPS, BCS) pulsed horizontal dipole magnet Adding new magnets including pulsed horizontal dipole magnet Adding BPM, x-collimator, OTR screen BPM electronics upgraded (resolution improved)

Hamid Shoaee LCLS Facility Advisory Committee April Linac & BC2 Controls Installation Schedule Overview: Controls ready 12/3/2007

Hamid Shoaee LCLS Facility Advisory Committee April X-Ray End Station DAQ & Controls Developed a conceptual design for end station data acquisition and control Held a Conceptual Design Review Developed a detailed task list and a project plan The AMOS experiment may eventually take producing ~700 MB/second or 2.4 TB/hour or ~58 TB/24 hour The plan is to build on previous experience. Initially use commercial digitizer and COTS CPU for spectrometer data. Use scalable technology developed for LSST for CCD data. Capitalize on years of BaBar experience with hierarchical storage and management of HEP data. ~1 TB/day raw data. ~1 TB/day derived data. ~1.5 PB total Babar data. Extend/integrate several SLAC-developed Java-based technologies for data retrieval and analysis. (Presentation at controls breakout)

Hamid Shoaee LCLS Facility Advisory Committee April XES Detail – Data Acquisition XES Hutch 6. DAQ Data to SCCS D. ADC Control & Digitized Data B. Distributed EVR Hardware Triggers XES private subnet XES Controller Channel Access Gateway Visual Data Monitor C. Beam Line & Timestamp Data (dedicated Enet) EELOG Beam Line Processor XES Data Cache 4. MPS (Reflective Memory Fiber) E. Detector Control & Digitized Data Non-RTOS SBCRTOS PC Non-RTOSPC EVR VME Beam Line Data PMC 1 Gb E 2 Detector Types Spectrometer CCD Pixel Detector 2 DAQ Types SBC DAQ CE Module DAQ PPC 10 Gb Enet Experiment Chamber cPCI ADC RTOS Front End Board TOF/Momentum Instrument EPICS Config PVs Fast Serial 1 Gb E 2. Beam Line 120 Hz Data 3. EVR (Fiber) 5. SLAC WAN (Ethernet) 1. Channel Access (Ethernet) A. EPICS & Local Control (Hutch Subnet) F. DAQ Data to Cache A F B C MPS PMC FPGA 1 Gb E EPICS Config PVs Spectrometer Monitor CCD Monitor 1 Gb E D E G. Visual Monitor Data G G 1 Gb E

Hamid Shoaee LCLS Facility Advisory Committee April Plans for the Next Six Months Complete the majority of Linac BC2 installation Develop detailed plans for LTU, Undulator installation Complete the design of XES controls, DAQ and data management Complete AIP projects Detailed design for next generation high level applications

Hamid Shoaee LCLS Facility Advisory Committee April Breakout Session 4 – CONTROLS Location – Redwood A, Bldg 48 Monday, April 16th TimeTopicPresenter 1:30pmControls commissioning experienceP. Krejcik 2:00pmLCLS MPSS. Norum 2:30pmBPM and Toroid UpdateS. Smith 3:00pmBreak 3:30pmX-ray End Station (XES) ControlsR. Sass 4:00pmTiming Systems update S. Allison 4:30pmBC2/Linac Controls Installation PlanningH. Shoaee 5:00pmDiscussion Tuesday, April 17 th 8:00amMATLAB Applications SoftwareM. Zelazny

Hamid Shoaee LCLS Facility Advisory Committee April Conclusions The injector control system is online & operational It has taken heroic effort by Controls group to meet the commissioning deadline The plans are in place for linac & BC2 installation We have developed a detailed plan for the undulator control in collaboration with ANL A conceptual design is in place for X-ray End Station data acquisition and control The major risk for the above items is schedule rather than technical complexity