ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.

Slides:



Advertisements
Similar presentations
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Advertisements

By: Matt Mihelish Joe Winston
Principle of the process Design For Manufacturing (DFM)
ISE 311 Sheet Metal Forming Lab Cup Drawing in conjunction with Section 20.3 in the text book “Fundamentals of Modern Manufacturing” Third Edition Mikell.
Living with the lab Prototyping with Sheet Metal.
Main Functions of Buildings 4 Provide a safe and comfortable environment for work and rest. (Protect us from wind, rain and the wild animals) 4 Two types.
ME 450 Group Adrian Conrad Chris Cook Thomas Hylton Nathan Wagers High Pressure Water Fixture Conceptual Design Analysis December 10, 2007.
Pellet Dies: User Instructions Read these instructions carefully before beginning work. Read the risk assessment. If you have not used the die and hydraulic.
Vacuum Vessel Production Readiness Review
ANSYS Workbench Analysis Figure 7 Figure 6 Figure 5 Figure 4 Figure 3 Figure 5: This shows the normal stress of the part. Our maximum stress is at the.
CTC 422 Design of Steel Structures
Fundamentals of Metal Forming Chapter 18
Chapter 17 Design Analysis using Inventor Stress Analysis Module
Bridge Design Project Using SolidWorks and SolidWorks Simulation to design, test and build structures.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
The Paper River Chasm Project Team Canada ME104Q University of Rochester The Paper River Chasm is an opening that extends 8.5” over the Paper River. Several.
Project Unbreakable Debra Rich & Carmen Prieto ME 104Q Fall 2004 The purpose of this project was to design a bridge using Aluminum Alloy as the metal.
Engr 121 – Mechanics of Materials Fall 2007 Skeleton Class Notes Professor Brian Weick What is Mechanics of Materials? –Relationships are studied between.
Redesign and Packaging of Adirondack Chair Team #58 Project # F07-58ADRNDKCH Team Members Craig Craddock William Fogerson Jason Hick John Mathews Mike.
Mike Burgstrom Jeff Cosgrove Trevor DiMarco Laura Wong This picture shows the amount of Maximum Sheer Stress that is created when a load of 565 pounds.
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
Senior Design: Validation of Design December 15, 2008.
Material Storage and Dispensing Device for the Kitchen Charles E Schaefer, Jr. School of Engineering Department of Mechanical Engineering ME 424 Senior.
SHEAR AND MOMENT DIAGRAMS WITH APPLICATIONS IN TWO ORTHOGONAL PLANES
Fundamentals of Metal Forming Chapter 18
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
Much of the material from: COL Stephen Ressler, P.E., Ph.D.
Critical Thinking in Engineering Process
BRIDGE AND ROV GROUP 4. Alex Paige Collin Palmer Sifat Syed Marc Hermann.
STRUCTURAL ENGINEERING: PUSH & PULL A Presentation to the AdVENTURE students.
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
Chapter 4 Process Design.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
Engineering 309: Machine Design I Instructor: Dr. Min Lu Presented by: Mike Kraft Thanh Nguyen.
Key Questions: What is a newton? How does a lever work?
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Mechanics of Materials – MAE 243 (Section 002) Spring 2008 Dr. Konstantinos A. Sierros.
FUNDAMENTALS OF METAL FORMING
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
Column Failures (Credit for many illustrations is given to McGraw Hill publishers and an array of internet search results)
Strength of Material-1 Introduction. Dr. Attaullah Shah.
To design a safer building Lesson 2.3
Enhancing Thinking Skills in Science Context Lesson 6
Engineering I – Statics. Test the Strength of Structural Members To design a structure, an engineer must be able to determine the strengths of the structural.
Bridges Project #3 Introduction to Manufacturing.
Bridge Building Design Challenge
Bridge Design Webquest Jonathan Stacey EDU 505. Phase 1: The strength of different geometric shapes. Websites to look at:
Structures What things do I need to find out in order to predict if what I design will stand up to the use I intend to put it through?
F UTURE I MPROVEMENTS : 1) Upgrade the plastic liner to a more durable material. 2) Upgrade tow cable and/or drive pulley. 3) Place windows in the tank.
Bicycle Wrench Analysis
Engineering Design Process Selecting an idea – design and build Steps 3 and 4.
The Waddell A-Truss Bridge
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
Principle of the process Design For Manufacturing (DFM)
Unit D Structures and Forces
By: Mackenzie Yagodich, Vanessa Steber, AJ Knotts, and Sam Heck
End of Line “Pass Through” Conveyor
Structures.
Engineering materials lecture #12
Equilibrate System upgrade
Prototyping with Sheet Metal
Structures & Buckling Developed by: Lane Azure Bob Pieri Chad Ulven.
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Helping Haiti: Earthquake Resistant Structures
Applied Technology High School (ATHS)
PDT 153 Materials Structure And Properties
Bicycle Wrench Analysis
Engineering Terms Engineers design all structures with enough strength to withstand the force and load that will be placed upon them. Generally loads are.
Practice #3—Pulleys Mr. Burleson
Presentation transcript:

ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built on the idea that all materials have certain properties concerning stress and yield strength that make virtual simulation of them both possible and very accurate. This idea has revolutionized the manufacturing process, and has given way to a new realm of efficiency. A bridge made of aluminum must support a load with minimal deformation. A loading deck holding two people is placed over the center of the bridge. While supporting this load, a long piece of paper must be pulled out from under the deck. The supported load will be divided by the weight of the finished bridge. The highest resulting quotient will receive the highest number of points. In our case, a unique construction of a C-beam aluminum (6061-T651) bridge was modeled and tested in ANSYS Workbench. Changes were made, and the model was retested, until the bridge met our specifications. These virtual models allowed us to simulate several prototypes without actually having to build them. We kept the model that best fit our needs, and drew the assembly and part drawings to have it actually physically built. Holes were drilled into the finished product at low stress areas to reduce weight. In both construction, and amount of material, the safety factor was pushed as far to the threshold of 1 as possible. The People Team Boomerang: Steven Vollmer Max Sicherman Alexandra Wikstrom Patrick Ripp Engineering Student Working in collaboration with: Dr. D.J. Quesnel The University of Rochester Machine Shop Mechanical Engineering Professor This work was made possible with the gracious support of the University of Rochester Department of Mechanical Engineering, under the direction of Stephen J. Burns. We modeled numerous prototypes in ANSYS Workbench. This program allowed us to specify size, material, design, and load. We then tested these prototypes with a slightly higher than intended load. The prototype that fares the best is kept, and tested further to perfect its design. The colors show areas of varying stress. This allowed us to know where to put the holes without sacrificing strength. 1 inch on inside after bend We then turned the details of the accepted prototype into assembly and part drawings. This allowed simple manufacture and construction in the machine shop. We specified all details. The finished product was then built to specifications. We measured it and scrutinized every detail to insure satisfaction. Obvious defects were reported and fixed. 8.5 inches Paper River Table Top Bridge Loading Bar Wooden Plank **All excess weight is put onto the wooden plank The final product will be tested with the loading deck shown above. Two people will stand on the loading deck, and their weight, along with the weight of the deck, provide the total load. We will measure the resulting deformation. The following pictures represent the expected performance of the bridge based on simulations done in ANSYS Workbench. This view displays the Equivalent Stress, or the stress the bridge will suffer. ANSYS simulation of the Maximum Shear Stress. This shows where the metal is most likely to shear, and where it suffers shear stress. ANSYS Simulation of total deformation. This was valuable in determining that this prototype would work. The displacement is small enough to be satisfactory. ANSYS simulation of Safety Factor. We pushed our safety factor as close to 1 as possible. This was one of the important concepts of the experiment. Bridge Statistics: Load Used for Simulation 315 lbs Bridge Mass lbm Material Used 6061-T651 Parts Attachment Pop Rivets Figure of Merit = Mass Supported Mass of Bridge Figure of Merit = _______________ Pass_____Fail_____ Summary Our bridge was designed, modeled, and tested within ANSYS Workbench. Our bridge was built, more or less, to our specifications in the University of Rochester machine shop. The deformations and stresses that are observed in the ANSYS calculations, although close to one, are satisfactory. The bridge, assuming the ANSYS calculations are correct and account for environmental error, should perform as expected. The bridge should support the expected load with less than the shown deformation (the force in the simulations was overestimated). Presentation: December 13 th, :30 am – 12:30 pm