1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 References For This Page Handbook References Frame Kit References Last revision 5/30/09 References to Forms New or Revised Document of 15 Lowe’s Program.
2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
E-field calculations for the TPC/HBD N. Smirnov Upgrade Working Group Meeting 05/13/03, BNL.
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Click to edit Master subtitle style 4/25/12 Thermal Management By using PLPCB technology with HEAVY Copper in PCB Pratish Patel CEO, Electronic Interconnect.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
BE PREPARED TO TAKE A FEW NOTES TODAY… Pick up the pink sheet at the front.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
What goes up and down but never moves?
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Planning Considerations in planning are: –Function or Usefulness: is it needed? –Kind of Wood: Depends on function and finish used. –Size & Proportion:
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Working Drawings Introduction To Technology Shenendehowa High School
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Construction of Prototype B for the COMPASS-II Polarized Drell-Yan Experiment James Mallon of Abilene Christian University for the UIUC COMPASS Collaboration.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
GEM Foil Development at ECIL
CLAS12 Drift Chamber Prototyping
How to make a PCB.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
JIG’S AND FIXTURE’S RUBRIC JIG: A.CONSTRUCTION EFFORTS (Parts are secure) PTS B.WORKMANSHIP (Neatness, Layout) PTS C.CONNECTIONS.
Sierra Assembly Technology Inc.
Entrance Muon Counter (EMC)
Taxonomy of Wood Products Engineered Wood Products
Development of Gas Electron Multiplier Detectors for Muon Tomography
Summary and update on HGC Entrance Window Design and Testing
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Limited Streamer Tube Project Summary
Presentation transcript:

1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than expected Exploring possibility of manufacturing smaller PCBs and then laminating several together to make a single plane Discussions with Hall D Engineers (their circular chambers are made in pieces). Do NOT do it!!! (if possible!) Vendor Search – industry maximum tooling for PCBs is 40 inches wide. Only two vendors in the USA capable of making such large PCBs Triangle Labs, Inc, Nevada Universal Circuits Inc, Minnesota Start to revise our design to accommodate a narrower PCB.

2 PCB Redesign – U Plane Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 Acceptance unchanged : 80cm X 80 cm Overall width reduced to 38.6 " Side bar width reduced to 3.15 " Frame deflection due to wire tension changes from 0.002" to 0.011" (0.034 % of wire length) Working on procedures for transfer of wire planes from stringing jigs to final assembly station

3 PCB Redesign – X Plane Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 Wire planes now have two HV inputs Overall length unchanged (ex. HV in) Wire cell spacing unchanged

4 PCB Redesign – K (cathode) Plane Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 All designs check for consistency Advice from Fast Electronics Group taken into consideration Redesign means small changes to design and dimensions of front and rear plates Changes mounting frame design

5 Redesign and PCB Status Redesign keeps acceptance unchanged but reduces overall width of pcb to less than 40 inches. Final eCAD drawings completed for cathode (K), U and X wire planes. Final fabrication drawings to be completed for vendor. Complete set of drawings sent to vendor next week. Triangle Labs Inc, Nevada, quoted $ for the whole project. includes spare boards – 2 X, 2 U and 4 K boards Purchase order placed through Hampton University received by vendor and material ordered. Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011

6 Foil Stretching Jig Finished construction of the foil stretching jig. Successful full scale test using mylar foil; see videos separately. Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 Sealed plywood base and wooden sidesPolished polyethylene block in centre

7 Foil Stretching Tests Several stretching tests completed to check foil tension. Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011

8 Foil – Frame Adhesion Test Successfully test glued a stretched foil to G10 frame. Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011

9 Materials Purchased HV wire, signal wire, epoxy, cathode foil and gas window foil purchased. Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 Signal wire: 25  m gold plated tungsten HV wire: 100  m copper-beryllium Cathode foil is copper coated kapton, 1 mil thick Gas window is aluminised mylar 1 mil thick

10 Summary Redesigned PCBs to be able to manufacture each plane as a single piece; acceptance unchanged. Received a reasonable price quote from vendor. Purchase order for PCBs placed. New eCAD drawings complete; fabrication drawings next. Full suite of drawings to go to vendor next week. Foil stretching jig constructed and tested successfully. HV wire, signal wire, epoxy, cathode foil and gas window foil purchased and received; thanks to HCF and SAW. Continuing to develop our techniques and procedures. Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011