Bill Atwood, SCIPP/UCSC, Dec., 2003 GLAST ALL GAMMAs using the New Recons First runs of ALL GAMMA – from glast-ts and SLAC Unix farm glast-ts sample: no.

Slides:



Advertisements
Similar presentations
CU Beamtest Workshop III, June 28-30, 2006 C. Cecchi – S. Germani – M. Pepe Offline Monitor for CU Beam Test Claudia Cecchi Stefano Germani Monica Pepe.
Advertisements

STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Bill Atwood, Dec GLAST 1 GLAST Energy or Humpty-Dumpty’s Revenge A Statement of the Problem Divide and Conquer strategy Easiest: Leakage (Depth)
Bill Atwood, August, 2003 GLAST 1 Covariance & GLAST Agenda Review of Covariance Application to GLAST Kalman Covariance Present Status.
Bill Atwood, SCIPP/UCSC, May 8, 2006 GLAST 1 Partial validation of v9r3 - Bkg. Rej. Comparison 2000 sec. of backgrounds were run using v9r3 (heros: Tom.
Assessment and Proposal W. B. Atwood UCSC, April 6, 2005.
GLAST LAT ProjectIA Workshop 6 – Feb28,2006 Preliminary Studies on the dependence of Arrival Time distributions in the LAT using CAL Low Energy Trigger.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
Bill Atwood, SCIPP/UCSC, Apr. 3, 2006 GLAST 1 Pass 4 and Preparing for the LAT Handoff to NASA Why we can't go with the DC2 Analysis (Pass 3) 1) Background.
Bill Atwood, July, 2003 GLAST 1 A GLAST Analysis Agenda Overarching Approach & Strategy Flattening Analysis Variables Classification Tree Primer Sorting.
Bill Atwood, SCIPP/UCSC, Jan. 30, 2006 GLAST 1 Closer to Reality From Last Talk ( 7-Jan-06) – things seemed Great! However... 1) In estimating the SRD.
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 DC2 Discussion – What Next? 1)Alternatives - Bill's IM analysis - ???? 2)Backing the IM Analysis into Gleam.
GLAST LAT ProjectCU Beam Test 11/8/2005 L. Latronico1 Glast LAT Calibration Unit Beam Test at CERN Overview of Tasks 11/8/2005.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Core Software “Performance Review” TkrRecon How do we know the Tracking is working? GLAST.
T. Burnett: IRF status 30-Jan-061 DC2 IRF Status Meeting agenda, references at:
1 Update on Photons Graham W. Wilson Univ. of Kansas 1.More on  0 kinematic fit potential in hadronic events. 2.Further H-matrix studies (with Eric Benavidez).
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 Background Files Available Processed 500M v7r2 Bkg. events run at SLAC Processed 2M v7r2 All Gammas Processed.
Hardware Failure Impacts Exercises S. Ritz. Issues Recent results from design reliability analysis (system engineering, Thurston et al.) Probabilities.
Bill Atwood, SCIPP/UCSC, Dec., 2003 GLAST 1 DC1 Instrument Response Agenda Where are we? V3R3P7 Classification Trees Covariance Scaled PSF Pair Energies.
Bill Atwood, SCIPP/UCSC, Nov, 2003 GLAST 1 Update on Rome Results Agenda A eff Fall-off past 10 GeV V3R3P7 Classification Trees Covariance Scaled PSFs.
Bill Atwood, SCIPP/UCSC, August, 2005 GLAST 1 Energy Method Selections Data Set: All Gamma (GR-HEAD1.615) Parametric Tracker Last Layer Profile 4 Methods.
Bill Atwood, Rome, Sept, 2003 GLAST 1 Instrument Response Studies Agenda Overarching Approach & Strategy Classification Trees Sorting out Energies PSF.
Residual Background events after Rejection Cuts M total background events (GlastReleasev3r3p7) 344 residual events after Bill's rejection cuts. 342.
Analysis Meeting 17 Oct 05T. Burnett1 UW classification: background rejection Update with new all gamma and background samples.
GLAST LAT Project IA Workshop 4 July 15, 2005 E. do Couto e Silva 1/7 Overview of Data Taking Anders W. Borgland Science Verification, Analysis and Calibrations.
Bill Atwood, SCIPP/UCSC, Jan. 30, 2006 GLAST 1 Post Processing & Pass4 The time for DC2 is drawing to a close. However we're still only part ways up the.
Analysis Meeting 4/09/05 - T. Burnett 1 Classification tree Update Toby Burnett Frank Golf.
Bill Atwood, SCIPP/UCSC, DC2 Closeout, May 31, 2006 GLAST 1 Bill Atwood & Friends.
T. Burnett: IRF status 5-feb-061 DC2 IRF Status Meeting agenda, references at:
Science Requirements Verification GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 2 of 12 GLAST Large Area Telescope Gamma-ray Large.
1 ACD studies: 1. Light Yield Determination for top ACD Tiles 2. Looking for holes (screws) in the ACD data Instrument Analysis Workshop VI Luis C. Reyes.
Background runs at the UW “farm” A little background: we have installed the GRID-standard condor from the other UW in Madison. –Currently 6 CPUs available,
New Ntuple Variable: CalEdgeEnergy Leon R. C&A Meeting 12 December 2005.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
Bill Atwood, SCIPP/UCSC, Oct, 2005 GLAST 1 Back Ground Rejection Status for DC2 a la Ins. Miner Analysis.
Bill Atwood, SCIPP/UCSC, Jan., 2006 GLAST 1 The 3 rd Pass Back Rejection Analysis using V7R3P4 (repo) 1)Training sample: Bkg: Runs (SLAC) v7r3p4.
Tracker Reconstruction SoftwarePerformance Review, Oct 16, 2002 Summary of Core “Performance Review” for TkrRecon How do we know the Tracking is working?
CalRecon Moments Analysis Studies I Tracy Usher1/17 A Brief History of Glast Release GR (Friday, July 15) –Effectively, the first DC-2 2M all-gamma.
R.Dubois Sim/Recon Overview 1/10 GLAST LAT ProjectSoftware Workshop July, SLAC Sim/Recon Overview Elements of Simulation/Reconstruction Development,
LAT Reconstruction (and simulation) Toby Burnett University of Washington.
DC2 at GSFC - 28 Jun 05 - T. Burnett 1 DC2 C++ decision trees Toby Burnett Frank Golf Quick review of classification (or decision) trees Training and testing.
Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Data Sets: Muons: allMuon-GR-v13r9 (14- Jan-2008) AG: allGamma-GR-v13r9.
Bill Atwood, SCIPP/UCSC, May, 2005 GLAST 1 A Parametric Energy Recon for GLAST A 3 rd attempt at Energy Reconstruction Keep in mind: 1)The large phase-space.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
Science Analysis Software DC-2 Kickoff Workshop March 1-3, 2005 Tracy Usher 1/25 Data Challenge II Kickoff Workshop Simulation and Reconstruction Overview.
Mark Dorman UCL/RAL MINOS Collaboration Meeting Fermilab, Oct. 05 Data/MC Comparisons and Estimating the ND Flux with QE Events ● Update on QE event selection.
Gamma Rays Using IceTop Hershal Pandya UDel − May 21, 2014.
GLAST/LAT analysis group 31Jan05 - T. Burnett 1 Creating Decision Trees for GLAST analysis: A new C++-based procedure Toby Burnett Frank Golf.
Bill Atwood, 6-Feb-2008 Pass 6: GR V13R9 Muons, All Gammas, & Backgrounds Muons, All Gammas, & Backgrounds Overview Overview Data Sets: Muons: allMuon-GR-v13r9.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
Report of GLAST Balloon Flight October Annual meeting of Astronomical Society of Japan T. Mizuno and other GLAST Balloon Team
LAT Performance Updates Plans and Procedures
Background Rejection Activities in Italy
Background Rejection Prep Work
Comparison of GAMMA-400 and Fermi-LAT telescopes
GLAST Large Area Telescope:
Instrument Analysis Workshop II
GLAST Large Area Telescope:
DC1 Energy Evaluation.
Event Classification & Background Rejection
LAT Software Quality Assurance
A First DC2 Analysis with New Recons
Overview Goal Study GEM variables in SVAC ntuple
Gamma-ray Large Area Space Telescope
Testing some CAL specs Level 3 CAL requirement 5.5.5:
Tower A: A First Look Finding the Data: Login: THIS ONE! user: glast
Searching for photons in the LAT
CR Photon Working Group
Studies of the Time over Threshold
Presentation transcript:

Bill Atwood, SCIPP/UCSC, Dec., 2003 GLAST ALL GAMMAs using the New Recons First runs of ALL GAMMA – from glast-ts and SLAC Unix farm glast-ts sample: no cuts – cal. only events, "NoCal" events, + regular 200K SLAC Unix Farm: cuts - TkrNumTracks > 0 940K (Sat.) + 510K (Sun.) Available.... ftp://ftp-gla st.slac.stanford.edu/glast.u06/richard/allGamma /merit pruned-2.root There are new nTuple Variables for both Tracker & Cal

Exercise Goals 1)Begin re-building 1)"GoodEnergy" Analysis 2)PSF Analysis 3)Back Ground Rejection Analysis 2)Exercise the MC Pipeline ( For DC2 estimate 5x10 8 background events) 3) Provide data for DC2 workshop ( Background events coming this week) ALL GAMMA Definition: Disk generation area = 6m 2 ; Soild angle: 2  str. A eff x  = 37.7 m 2 -str. (SR: 2.0 m 2 -str)

GoodEnergy Analysis Step 0: Look at the data! Events in nTuple (10.3 m 2 -str) No Cuts TkrNumTracks > 0 Events: ( 5.68 m 2 -str) SR: Convert > 65% of  s

Switch to  cos(  ) CsI RLnGap Fraction

Angle between Tracker Dir and Cal Dir Max. Energy in Single Xtal Tracker Dir - Cal Dir Comparison Energy "Zeros" near LAT Edge

Moments Analysis: Say a Moment of Inertial (see Goldstein). Showers form figures of revolutions about the shower axis. Two larger moments are approx. equal. and a small moment (moment about shower axis). Eigenvector associated with smallest moment is the shower axis. Capture Moments Information by :

A First Gamma Selection: CalTotalCorr < 3.5 & CalDeadTotRat <.15 & CalGapFraction <.30 & CalTransRms < 60 & CalLRmsAsym > 0. & CalCsIRLn > 4 & CalEnergyRaw > 5. ~ 300 Events/Bin A eff x  = 2.8 m 2 -str Aeff vs Log(E MC )

Step 1: Re-do the Energy and cos(  ) dependencies

That's as far as its gone so far. GOOD PROGRESS! Lot's of puzzles to solved. No "Show Stoppers" observed And... The re-write of the Recons is a Success! Go see for yourselves!