© 2008 RUSH Raven Project Demonstration April 14, 2008.

Slides:



Advertisements
Similar presentations
Team 10: SHERPA May 3, Our Team Outline Project Selection Our Project Design Choices Obstacles Our Prototype Future Additions What We Learned Acknowledgements.
Advertisements

S3 Technologies Presents Tactile Vision Glove for The Blind S3 Technologies: Shaun Marlatt Sam Zahed Sina Afrooze ENSC 340 Presentation: December 17, 2004.
Control Over the Internet of a Radio Controlled Robot By Thuc Nguyen, Justin Rodriguez, & Cameron Vandersteen.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor Steven Gutschlag December 7, 1999 Senior Project Proposal.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
Department of Electrical and Computer Engineering He Zhou Hui Zheng William Mai Xiang Guo Advisor: Professor Patrick Kelly ASLLENGE.
Team 5 Chemical Engineering Lab Scheduler Zach Frichtl Brent Ellwein Ryan Poplin Shawn Windler Chris Ciscsko Erik Halvorson Ben Linden.
Watt Smart Wireless Single Phase Power Monitoring System (WPMS) Kamyar G. Osgoei Glen Nogayev Titus Cheund Wenqi Sun Babak Sobhani.
Group Members Ikechukwu Mogbana Adewuyi Kupolati Frederick Tyson Advisor Prof. Mahmood February, Senior Project 2005/06 Undergraduate Project Proposal.
Intelli-Alert™ Personal Emergency Response System Simon Fraser University ENSC 340 © 2003 – GiveLife Systems.
Fivepoint Voiceture Sign Language Translator Bridging the communication gap.
Preliminary Design Report GPS Location System. Introduction GPS COMM Group Team Members Adam Preeo Adrian Migacz Andy Merritt Taylor Hughes.
ECEN 4610 Spring 2006 Hands-Free Low-Profile Wireless Radio Preliminary Design Review Handmade by Robots Team members Derek Lindberg Sean McDevitt Nick.
EE 396 Project Icarus Preliminary Design Review September 22, 2007 Group Members: Jeremy Chan Eric Lee Sae Yoon.
TEAM 8 Barry Li Victor Chen Elyas Sepasi Aron McKinnon ENSC 305/440 April 15 th,
ODOS The Office of the Dean of Students. Projects Interactive Campus Map Global Positioning System - Device for the Visually Impaired Adjustable Table.
Monday, July 13, 2015Websa Technology Ltd. © of 33 May 12 th, 2006.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
University of Massachusetts Amherst InteLock TM Team: Emmanuel Seguin Josh Coffin Anh-Kiet Huynh Christos Tsiokos Remote Access and Proximity Key Advisor:
PIC Evaluation & Development Board Project Team Chad Berg – CprE Luke Bishop – CprE Tyson Stichka – EE Nick Veys - CprE Financial Budget Abstract/Background.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
CS410 - BLUE GROUP Final Presentation communicate2Me.
THE MILESTONES OF MASS TRANSIT CS 410 Blue Group communicate 2Me.
1 PULZE™: Wireless Heart Attack Detector Copyright© Precision Lifestyle Technologies Inc. December 17, The Heart of Medical Advances.
1 Biomedical Embedded Systems Technology Presentation for ENSC 440/305 Instructors: Dr. Andrew Rawicz, Steve Whitmore Department of Engineering Science.
Demo Guidelines Lesson 9. Modules 9.1Demo Video Guidelines 9.2Begin Filming Pitch Video 9.3Continue working on prototype.
Presentation for ENSC 440/305 Instructors: Patrick Leung, Steve Whitmore Department of Engineering Science Simon Fraser University.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Software Engineering Management Lecture 1 The Software Process.
Radio-Controlled Duck Decoy May April 30 th, 2003 Team Members: Faculty Advisors: Jason Freerksen Prof. Robert Weber Kooi-Tjek Lau Prof. Clive Woods.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
HOME AUTOMATION HMI DEMO Michigan State University College of Engineering Team 3.
EE/CS 481 Spring February, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Team Awesome-O Senior Design Project Proposal Presentation 1 October 2008 John Burke Blake Jones David Ladao Bryan Winther.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
EE/CS 480 Fall November, 2007 University of Portland School of Engineering Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano.
Campus Locator Definition Phase May04-04 Client: Senior Design Advisors: Dr. Lamont & Prof. Patterson Team Members Justin Davis Justin Gruca Rachel Hadaway.
1 Saaghy™: Automated Cocktail Maker Copyright© Simple Sophisticated Technologies Inc. The Ultimate art of the Perfect Cocktail. 1.
Request for Proposal (RFP)
Preliminary Design Review Your Logo Here Team Leader: Thomas C. Null, III Team Members: Andrew Tomlinson, Matthew Gunter Faculty Advisor: Dr. Roger King.
Software Engineering 1 Object-oriented Analysis and Design Applying UML and Patterns An Introduction to Object-oriented Analysis and Design and Iterative.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
Chair-Mounted Computer Workstation May06-09 Client: Lockheed Martin Advisors: Dr. Arun Somani Dr. Zhao Zhang Team Members Isi OamenDavid Roberts Shawn.
Midterm Presentation Music Alarm Clock. Team Members Will Kalish Electrical Engineering Removable Media Device User Interface Eric Womack Electrical Engineering.
Smoke Notification System (SNS) Mid-Semester Presentation Senior Design 1 February 28, 2013.
EcoCar User Interface Final Presentation Senior Design I April 19, 2012.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
Design of an Integrated Robot Simulator for Learning Applications Brendon Wilson April 15th, 1999.
Midterm Presentation Music Alarm Clock. Craig Bilberry Team Leader Electrical Engineering Layout and Design Atomic Clock Signal Will Kalish Electrical.
Optical Encoder for a Game Steering Wheel May05-26 Client: Thomas Enterprises Advisors: Dr. James Davis Dr. Douglas Jacobson Team Members: Sam Dahlke,
Computer Asset Management System Project Feasibility CS 410, Fall 2005 Semester October 20, 2005.
 Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration  Questions / discussion.
EE/CS 481 Spring 2008 Project Killdeer Digital Tire Pressure Monitoring System Team John Hirano James Kelly Kevin Young Advisor Dr. Joseph Hoffbeck Industry.
Device Interface Board for Wireless LAN Testing
Smoke Notification System (SNS) Final Presentation Senior Design 1 April 18, 2013.
Team Reach Jessica McCartney Jie Zheng Monica Marinescu Xiaoning Xu Mid-Year Presentation Engineering Design Clinic December 10, 2004.
Advisor Dr. Tammy VanDeGrift Industry Representative Mr. Brian Toole University of Portland Information Services Client Dr. Kenneth Lulay Team  Sam Burich.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
Introduction Software Project Management Plan Software Requirements Specifications Software Design Description Software Test Result.
P ROJECT N OMAD Jay Stenmark Team Leader USB Design David Graham FM Receiver Software Webpage Documentation Aimee Imparato USB Design Hardware / Software.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Smoke Notification System (SNS) Mid-Semester Presentation Senior Design 1 February 28, 2013.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Software Engineering Management
ERP investment Henri Teittinen.
A Secure Wireless Interface between Personal Digital Assistants (PDAs)
Police Car Battery Load Management
Team Members: Member1, … Spring 2013
Presentation transcript:

© 2008 RUSH Raven Project Demonstration April 14, 2008

© 2008 RUSH Overview Our Team Project Motivation System Overview Technical Details Marketability Budget and Timeline Conclusion, Questions and Demo

© 2008 RUSH Our Team Mathew Bond – CEO Robert Hueber – CTO Darren Jang – VP Legal Rob Tyson – VP Development Daniel Hessels – CFO Over 35 years of engineering experience!!!

© 2008 RUSH Project Motivation Need Convenient Communication Current Solutions Cellphones, Handheld Radios Helmets Our Solution The Raven: Everything you need

© 2008 RUSH System Overview

© 2008 RUSH Technical Details Design Process Hardware Firmware and Integration Lessons Learned

© 2008 RUSH Design Process Iterative, performance based Modular designs allowed parallel development and testing of: uC Firmware and interfacing Wireless PTT GPS Audio routing & amplification

© 2008 RUSH Hardware Wireless PTT FRS GPS Audio

© 2008 RUSH Integration and Firmware Hardware sub-systems 3 Firmware Phases Challenges

© 2008 RUSH Technical Lessons Learned Microcontroller nuances FRS Radio Parsing GPS data RF Antenna Design

© 2008 RUSH Marketability Market Potential Production Cost $80 for components Market Price $325 to $400 We hoped for $250

© 2008 RUSH Financials

© 2008 RUSH Timeline

© 2008 RUSH Conclusion Roles of Team Members Team Dynamics Documentation Communication Scheduling Future Plans New technology

© 2008 RUSH Acknowledgments David Hable, Cramped Attic Technology Inc. Tongxin Feng Jeremy So Michelle Nieken

© 2008 RUSH Questions ? ? ?

© 2008 RUSH Photo References The World is Not Enough Screenplay by Neal Purvis & Robert Wade. Metro-Goldwyn- Mayer (MGM). [Video] ressing_button.jpg ressing_button.jpg

© 2008 RUSH Demonstration Introduction to the user interface Test base functionality Advanced features Questions

© 2008 RUSH

Hardware Wireless PTT: numerous prototypes and IC replacements FRS Radio : deconstruction, button interface with NPN GPS: module mounted on eval board, could only prototype with Audio