SCOREPP Source Control Options for Reducing Emissions of Priority Pollutants COST Action 636 – Xenobiotics in the Urban Water Cycle, Vienna meeting, 25-27.

Slides:



Advertisements
Similar presentations
THE EU-LIST OF PRIORITY SUBSTANCES A NEW STRATEGY AGAINST WATER POLLUTION Bernd Mehlhorn, Umweltbundesamt, Berlin.
Advertisements

Dissemination workshop on: Evaluating Source Control Options for Reducing Emissions of Priority Pollutants Opening, by: Peter Steen MIKKELSEN Technical.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
Programming directions for GEF-6 Climate Change Mitigation
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
Substantive environmental provisions Prof. Gyula Bándi.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Knowledge Translation Curriculum Module 3: Priority Setting Lesson 2 - Interpretive Priority Setting Processes.
Improving monitoring campaigns : A case study Dissemination Workshop on Evaluating Source Control Options for Reducing Emissions of Priority Pollutants.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME.
Semi Hypothetical Case City Archetypes -The ScorePP approach to evaluating Emission Control Strategies (1 st preliminary version of D9.6) By multiple colleagues.
WG 3: Impact assessment ► Conceptual framework for impact assessment for xenobiotics in the urban water cycle ► Biotests as analytical tool ► Are we measuring.
T9.7 Multi-criteria evaluation of emission control strategies in semi-hypothetical case city archetypes Lian Scholes, Mike Revitt and Eva Eriksson.
The ScorePP Priority Pollutant Reduction Information System (PPRIS) ScorePP International Dissemination Workshop, Wednesday 03 February 2010.
23/06/2015 THE CITY OF STOCKHOLM PAGE 1 Environment and Health Administration, City of Stockholm, Sweden together with Lian Scholes Middlesex University,
Evidence Based Cohesion Policy Focus on performance incentives Thomas Tandskov Dissing Senior Adviser Ministry of Economics and Business Affairs Danish.
Wenxin Zhang Department of Civic Design University of Liverpool
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
A project implemented by the HTSPE consortium This project is funded by the European Union SUSTAINABLE GROWTH LIFE
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
” Particulates „ Characterisation of Exhaust Particulate Emissions from Road Vehicles Key Action KA2:Sustainable Mobility and Intermodality Task 2.2:Infrastructures.
European Commission, DG Environment Unit B.1: Water, the Marine and Soil TAIEX Seminar « Management of Water Resources: River Basin Management in the Baltic.
TEN-T Experts Briefing, March Annual Call Award Criteria.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
ESPON 2013 Programme Info Day on New Calls and Partner Café Call for Proposals on Applied Research.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Methodologies and Tools for Technology Needs Assessment: an Overview Zou Ji Dept. of environmental Economics and Management, Renmin University of China.
Achievements Work Package 1 Achievements Work Package 4: Identification of good practices and success stories in the region and elsewhere.
AMPS 2 Analysis and Monitoring of Priority Substances and Chemical Pollutants Second Meeting Ispra Review of Actions.
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
The new EC impact assessment: what for? EUROPEAN TRADE UNION CONFEDERATION Sophie Dupressoir.
Technical Support for the Impact Assessment of the Review of Priority Substances under Directive 2000/60/EC Updated Project Method for WG/E Brussels 22/10/10.
REGIONAL POLICY EUROPEAN COMMISSION The contribution of EU Regional/Cohesion programmes Corinne Hermant-de Callataÿ European Commission,
Water.europa.eu Preparation of the Commission’s 2011 proposal on Priority Substances Strategic Co-ordination Group meeting May 2011 Jorge Rodriguez.
Rob Collins Water Group EEA Hazardous Substances in Europe’s fresh and marine waters – An overview Report for publication – 1 st half of 2011 Rob Collins.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Europe-wide monitoring obligations under the EU Water Framework Directive Jos G. Timmerman Institute for Inland Water Management and Waste Water Treatment.
Water quality and water pollution – data for old and new policy questions 5th World Water Forum Session Data integration and dissemination: From.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
Session 3 General RIA Training 6–8 July 2009 EuropeAid/125317/D/SER/TR
Project Cycle Management
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
4th Expert E-PRTR Group Meeting Brussels, 4 February 2011
Diffuse Sources of Water Pollution
Marine Strategy Framework Directive (MSFD)
Chemical state in lakes and rivers
on Priority Substances Strategic Coordination Group
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
European Commission DG ENV Unit C1 Water
1st CHEMICAL MONITORING AND EMERGING POLLUTANTS (CMEP) PLENARY MEETING 25th November 2010 Slovak Hydrometeorological Institute, Bratislava.
Marine Strategy Framework Directive (MSFD)
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
Chapter 5: Water management and adaptation
Diffuse Sources of Water Pollution
Background CRiteria for the IDentification of Groundwater thrEsholds: BRIDGE Co-ordinator: BRGM (Fr) Groundwater Characterisation workshop, 25 June 2004.
Planning process in river basin management
Part I.
Preparation of the second RBMP in Romania
13th Working Group E meeting March 2011 Jorge Rodriguez Romero
DG Environment, Unit D.2 Marine Environment and Water Industry
WG Hazardous substances * Marine Strategy 19 November 2003
Scientific Support to Policies
DG Environment, Unit D.2 Marine Environment and Water Industry
Research on Climate Change on Water, including Natural Hazards Contribution to SSG discussions and science-policy interfacing Philippe QUEVAUVILLER European.
Presentation transcript:

SCOREPP Source Control Options for Reducing Emissions of Priority Pollutants COST Action 636 – Xenobiotics in the Urban Water Cycle, Vienna meeting, September 2006 WG1: Identification, sources and fluxes, 1st parallel meeting, 25 September 2006, 16:00-18:00 Presented by: Peter Steen Mikkelsen Project Coordinator Institute of Environment & Resources, DTU, Denmark

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 The SCOREPP project A Specific Targeted Research Project (STREP) Funded by the European Commission under the 4th Call of the 6th Framework Programme, sub-priority ”Global Change and Ecosystems” Duration: 1 Oct months Contract is currently being signed Budget: 3.6 M EUR, 2.6 M EUR from the EC 9 partners

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Partners and key persons 1.Technical University of Denmark, Institute of Environment & Resources (DTU) –P.S. Mikkelsen, A. Ledin, E. Eriksson, B.K. Rasmussen 2.Middlesex University, School of Health and Social Sciences (MU) –Mike Revitt, Lian Scholes 3.Gent University, Dept. of Applied Mathematics, Biometrics and Process Control (UGent) –F. Verdonck, L. Benedetti 4.Anjou Recherge, Municipal Wastewater Department (AR) –E. Trouve, L. Castillo 5.ENVICAT Consulting (ENVICAT) –A. Lecloux 6.University of Ljubljana, Faculty of Civil and Geodedic Engineering (UL) –B. Kompare, P. Banovec 7.Dosenvolupament i Societat ESTUDIS SA (ESTUDIS) –C. Bessat, J. Trouve 8.Stockholm City, Envionmental Monitoring (MF) –A. Jonsson, L. Sörme 9.Université Laval, Département Génie Civil, modelEAU (modelEAU) –P. Vanrolleghem, L. Rieger

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Partners and case cities Partners: DTU, Denmark MU, UK UGent, Belgium AR, France ENVICAT, Belgium UL, Slovenia ESTUDIS, Spain MF, Sweden modelEAU, Canada Case cities: Stockholm, Sweden St. Malo, France Prague, Czech Republic Quebec, Canada St. Sebastian, Spain

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Text in work programme (interpretation follows on the next pages) Art. 16 of the Water Framework Directive has put in place a mechanism through which a list of 33 priority pollutants, for which environmental quality standards and emission control measures have to be established, was created. From this list, a group of 11 priority hazardous substances were identified, which will be subject to cessation or phasing out of discharges, emissions and losses within an appropriate timetable that shall not exceed 20 years. This action will investigate alternative technologies, management options and monitoring systems for source control of priority substances, carrying out, as well, a multi-criteria comparison with end- of-pipe solutions. The impact of different substitution options of priority substances for their various uses should be assessed. This action contributes to the objectives of the Environmental Technologies Action Plan (ETAP).

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Main SCOREPP objectives Develop comprehensive and appropirate source control strategies that authorities, cities, water utilities and chemical industry can employ to reduce emissions of priority pollutants from urban areas

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 WFD PS (33) and PHS (11) GroupSubstance AlkylphenolsNonylphenols, Octylphenols Aromatic carbonsBenzene Halogenated hydrocarbons C10-C13 chloroalkanes,1,2 Dichloroethane, Dichloromethane, Hexachlorobutadiene, Pentachlorobenzene, Trichlorobenzenes, Trichloromethane PAHAnthracene, Fluoranthene, Naphthalene, Polyaromatic hydrocarbons (sum) PlastizisersDi (2-ethylhexyl) phthalate (DEHP) PesticidesAlachlor, Atrazine, Chlorfenvinphos, Chlorpyrifos, Diuron, Endosulfan, Hexachlorobenzene, Hexachlorocyclohexane, Isoproturon, Pentachlorophenol, Simazine, Trifluralin MetalsCadmium and its compounds, Lead and its compounds, Mercury and its compounds, Nickel and its compounds Organo-metalsTributyltin compounds Note: New list including EQS was proposed in July 2006

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 SCOREPP Priority Pollutants (PPs) The 33 priority substances (PS) identified in the WFD, and especially the 11 PHS Expand list to –Include ”emerging pollutants” (already the case in the FWD) –Local demands for monitoring Reduce list if –Appropriate model compounds can be identified (similar source, fate pattern, legislation) –Analytical difficulties

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Limiting release through: - Substitution - Minimising release from produtcs - Legislation and regulations - Voluntary use reductions The considered physical system OL D+T T T Example: Combined system: D+TT +R Treatment options: - Stormwater BMPs - Household treatment & reuse of WW - On-site industrial treatment - WWTPs - Sludge disposal Sinks: - Primary: Surface water (WFD) - Secondary: Sediments, soils/gr.water, humans,...

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 CHIAT - Chemical Hazard Identification and Assessment Tool Underlying approach

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Work packages WP1: User requirement analysis and dissemination to end-users WP2: Analysis of case studies WP3: Source characterisation of priority pollutants WP4: Limiting release of priority pollutants WP5: Treatment options WP6: GIS-based identification of emission control measures WP7: Models and monitoring strategies WP8: Socio-economic analysis of source control measures WP9: Integration of knowledge and comparison of emission control strategies WP10: Project management and co-ordination

Project plan WP Mth Resp WP1: User requirement analysis and dissemination to end-users DTU WP2: Analysis of case studiesAR WP3: Source characterisation of priority pollutants DTU WP4: Limiting release of priority pollutantsENVICAT WP5: Treatment optionsMU WP6: GIS-based identification of emission control measures UL WP7: Models and monitoring strategiesUGent WP8: Socio-economic analysis of source control measures ESTUDIS WP9: Integration of knowledge and comparison of emission control strategies DTU WP10: Project management and coordinationDTU Establishing technical-scientific facts GIS, models, monitoring Socio-economic and integrated analyses Case studies Advisory board, PPRIS

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Main output from work packages WP8: Socio-economic analysis of source control measures –Maco-economic model, socio-economic cost database, mapping of decision processes, benchmarking, economic assessment, guidelines WP9: Integration of knowledge and comparison of emission control strategies –Uncertainty, integration of methodologies in case-studies, common data structures, comparative screening of ECS, socio-economic criteria, semi-hypothetical case-studies and ECS, MCA

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Main output from work packages WP3: Source characterisation of priority pollutants –Database with properties of PPs, mapping of sources and source dynamics, emission statistics and release factors WP4: Limiting release of priority pollutants –Possible substitutes, minimisation of release from products, legislative/regulatory handles, voluntary initiatives, feasibility analysis WP5: Treatment options –Quantification of PP behaviour/fate in stormwater BMPs, household treatment & reuse systems, on-site industrial treatment systems, end-of-pipe WWTPs and sludge disposal, feasibility analysis

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Main output from work packages WP6: GIS-based identification of emission control measures –Systematic catchment characterisation, unified data formats and GIS databses, visualisation tools, GIS modelling, DSS selection of ECS WP7: Models and monitoring strategies –Models for pollution generation and unit processes in treatment trains, integrated urban-scale PP-exposure model, strategies for monitoring effect of ECS, guidance on model based planning of sampling campaigns

Thanks ! Next time, there will be more results...

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Text in work programme (interpretation follows on the next pages) Art. 16 of the Water Framework Directive has put in place a mechanism through which a list of 33 priority pollutants, for which environmental quality standards and emission control measures have to be established, was created. From this list, a group of 11 priority hazardous substances were identified, which will be subject to cessation or phasing out of discharges, emissions and losses within an appropriate timetable that shall not exceed 20 years. This action will investigate alternative technologies, management options and monitoring systems for source control of priority substances, carrying out, as well, a multi-criteria comparison with end- of-pipe solutions. The impact of different substitution options of priority substances for their various uses should be assessed. This action contributes to the objectives of the Environmental Technologies Action Plan (ETAP).

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Interpretation of call text Focus on the 33 PPs on the EU list, in particular the 11 HPPs. Emerging pollutants should be addresses a little, preferably on a level where we keep well-informed about the developments. The project will not develop new EQS’s for the PPs (there are other projects focusing on this). We will however invest time in following the process of how EQS’s is developed by others for the 33 PPs, to be aware of the boundary conditions to the project in terms of EQS’s. This involves keeping track of the scientific developments, and following the work in stakeholder fora and the policy processes. The focus of the project is on identification, quentification and evaluation of emission control measures

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Interpretation of call text Cessation or phasing out of discharges: The project will look at options for: –Substitution at the source (e.g. products or materials) –Effect of policy instruments and financial incentives –Close-to-the-source control, e.g. on-site industrial wastewater treatment and stormwater treatment in best management practices (infiltration units, ponds, etc.) –End-of-pipe treatment in WWTP’s and similar for stormwater discharges. For WWTP’s we envisage several other, more focused, EU- projects so this project will not put it’s emphasis on WWTPs (we will have to stay informed about the developments though). Time frame for scenarios investigated in the project: maximum 20 year but with shorter time frames when necessary to support European policy and/or legislation.

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Interpretation of call text The project has focus on alternative: –Technologies: This includes up-stream options such as industrial WWTP’s and stormwater treatment especially for surfaces with high traffic load. It also oncludes downstream treatment options, although this is not where this project will put emphasis. –Management options: This includes substition of products and materials, policy instruments, financial incentives, street sweeping, etc. –Monitoring systems: This involves improving the current monitoring systems in receiving waters to target all the 33 PPs as well as possible other relevant emerging P’s. But it particularly addresses how monitoring systems can be modified to be able to characterise the sources of PPs better and to identify the effect of source control options. ”Intelligent design” of up-stream sampling campaigns with increased frequency seems to be an obvious approach. … for source control of priority substances

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Interpretation of call text As a basis for all comparisons sound mass balances respecting the relevant time scales must be established. This sets new demands for modelling tools in the area of source-flux-fate models. Multi-criteria comparison with end-of-pipe solutions includes/demands: –Two types of case-studies: Semi-hypothetical case-studies where ideas can be framed and tested Real case-studies in European cities (where ambitious modelling and monitoring should preferably already take place) –Formulations of realistic scenarios aiming at reducing emissions of PPs –Evaluation of a range of indicators/criteria for use in comarison, most importantly: Cost evaluation (construction and running costs). This was emphasized by A Tilche at the information meeting in Brussels. Socio-economic impacts in a broader sence (to be able to compare ”soft” and ”hard” approaches Environmental impacts, either qualitatively or based on a LCA approach involving definition of a functional unit, similar to the way it is done in e.g. the solid waste sector Due to the potential ”political sensitivity” of the subject area the multi-criteria comparison must be done in a transparent manner in support of an open dialogue process involving inportant stakeholders (both at the case-study and the European level).

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Interpretation of call text The impact of different substitution options of priority substances for their various uses should be assessed, i.e. it must be mapped out/evaluated for each PP: –Substitution options are an important part of the project –The options for substituting each PP for each use must be mapped out –The potential efficiency of substitution for reducing emissions must be evaluated –Substitution must be included in the multi-criteria evaluation

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Interpretation of call text ETAP is composed of actions around three main themes: –Getting from Research to Markets; –Improving Market Conditions; –Acting globally. The participants in the WSSTP will together produce a common vision document for the whole European water industry together with a strategic research agenda and an implementation plan for the short (2010), medium (2020) and long term (2030). The WSSTP will contribute to: –the competitiveness of the European water industry (Lisbon Strategy); –solving the European water problems –reaching the Millennium Development Goals (Johannesburg). Our interpretation is that for this project, the underlined sentences are more important than reaching the Millenium Development Goals.

Mikkelsen, P.S.: Presentation of the SCOREPP project. 25 September 2006 Overall project objectives O1: Identify options to cessate, or phase out of discharges, emissions and losses of PPs O2: Develop appropriate tools to assess if O1 can be achieved in practice (databases, simulation models, monitoring strategies, evaluation tools) O3: Prepare guidance documents O4: Demonstrate usefulness in case studies in different contexts