John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.

Slides:



Advertisements
Similar presentations
Threads and Fasteners Fasteners.
Advertisements

Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
FIRST TERM SCHEME OF WORK.
John Wloch Wind-Aid Critical Design Review 4/22/2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
John Wloch Wind-Aid Preliminary Design Review 26 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
PDR: 3/27/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Small-Scale Solar Power Solar Power Rangers ~ Kevin Kastenholz 13 March 2008.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
John Wloch Wind-Aid Preliminary Design Review 8 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 1 April 2008 Andy CrutchfieldJames Gates Keri Macaulay David Rupp.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
PDR: 3/20/08 Pinwheel Technologies (C3) Heather Blaha Matt Fuxa Joey King Michael McConnell Domenic Tassoni.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Preliminary Design Review Week 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Interactive Xylophonic Keyboard Mini-Mozarts November 9, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey November 9, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
A6: Team Rallye Potable Water Still Presented by: Tim Rodts October 26, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Team Crush Phase II Completion Ryan Gonzalez Brent Rieman Matt Yankow Alec Byrum Patrick David Amanda Koch John Ranalli Mark Kintner Kelly Murphy Spencer.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
What do all of these items have in common? They are all types of fasteners.
Introduction 2 Mechanical Design
Design for Manufacture and Assembly Introduction Note: this is an adaptation of a presentation from Dr. Denis Cormier, intended for use as an Intro to.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
TAIL STOCK ASSEMBLY Modeled & Compiled by R.Rajashekar Asst. Professor Department of Mechanical Engineering U.V.C.E, Bangalore-1.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Prototype Review November 20, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
A6: Team Rallye Potable Water Still Presented by: Mike McConnell November 2, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
John Wloch Wind-Aid Preliminary Design Review 5 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Far Detector Activities Late 2017 – Early 2018
10/month is the present production rate 2 FTE + sporadic contributions
Mechanical Functions.
BASIC MECHANICAL FUNCTIONS
BASIC MECHANICAL FUNCTIONS
Sections, Assemblies & Exploded
Mechanical hardware.
Mechanical hardware.
4D-100, 4D-600 2½”- 10”.
Valve stem “gag” mechanism
Guides & Links Basic Mechanical Function
Assembly drawings Flóra Hajdu B406
First prototype module released from the assembling platform
Presentation transcript:

John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp

Current Status – On Schedule CAD assembly completed Prototype assembly to complete Prototype testing to begin Wind-Aid Show Stoppers: None at this time We are on schedule, per group and class project timetables

Last Week Action Item 1: Purchased HDPE and other components HDPE was purchased and machined into parts Other components were purchased (nuts, bolts, screws, etc.) Wind-Aid Action Item 2: Finished CAD model CAD model of prototype was completed, with the exception of cosmetic parts (bolts, nuts, etc.)

Last Week Wind-Aid Platform for generator Hub for the blades Purchased Components U-bolt Pipe coupler ¼” Bolts ¼” Nuts ½” Washers Epoxy glue L-brackets Machine screws Clasps

Next Week Action Item 1: Finish prototype assembly Utilize all of the components that were machined and purchased to complete the assembly of the prototype. Action Item 2: Begin testing prototype Electronic output Mechanical behavior Ease of set up Wind-Aid

Questions?