LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Advertisements

LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
NEH ARR PPS 11AUG09 LCLS NEH Hutch Protection System E. Michael Saleski; QC Manager Michael G. Harms, Patrick Bong, James Murphy, Alan Hill; Engineers.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
1 Enzo Carrone 1 NEH Safety Systems NEH ARR 2009 NEH Safety Systems Enzo Carrone June 30 th, 2009.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
LUSI Coordination with LCLS
Experimental Facilities Planning
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
LINAC OPS Budget Review
Stefan Moeller – XES Manager May 14, 2009
Electron Beam Systems ETC and Methodology
John N. Galayda – Director, LCLS Construction May 13, 2009
X-Ray Endstations Update
Project Management Issues John N. Galayda, SLAC April 24, 2002
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
The Transition to User Operations
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
LCLS Operation in 2009 Roger A. Erickson
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
Safety Program for LCLS Experiments
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
Presentation transcript:

LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities Division June 30, 2009

2 H. Tompkins 2 NEH status NEH ARR – June 30, 2009 Current NEH status LCLS is operating through the Front End Enclosure, just upstream of NEH New NEH building is fully functional NEH hutches & shielding are in place Hutch door installation being finalized PPS systems are installed Safety systems not yet certified

3 H. Tompkins 3 NEH status NEH ARR – June 30, eV to Hutch eV to Hutch eV to Hutch 3-6 insertable Beam delivery to NEH Shadow Wall Wall 2 NEH FEE stoppers Temp stop

4 H. Tompkins 4 NEH status NEH ARR – June 30, 2009 LCLS operating structure LCLS Director Dale Knutson Accelerator Systems Div John Seeman operate accelerator for science Business Div Cindy Lowe Experimental Facilities Div Jochen Schneider operate instruments for science Engineering Physics Div David Schultz Strategic Projects Div John Galayda LCLS Construction LUSI

5 H. Tompkins 5 NEH status NEH ARR – June 30, 2009 Near Experimental Hall Far Experimental Hall Front End Enclosure Undulator Hall XFD responsibility ASD responsibility Division of responsibility

6 H. Tompkins 6 NEH status NEH ARR – June 30, 2009 Experimental Facilities Division (XFD) XFD Director Operations Area Mgr Floor Coord’s User Admin Ops tech staff Science Inst Scientists R&D R&D tech staff XFD Safety Officer

7 H. Tompkins 7 NEH status NEH ARR – June 30, 2009 Experimental Facilities Division Tasks Manage safe operations in LCLS experimental areas Manage LCLS user program Maintain and upgrade X-ray instrumentation Enable good user science; initiate in-house research

8 H. Tompkins 8 NEH status NEH ARR – June 30, 2009 XFD processes Strong ties between XFD and ASD ASD operating structure used as a model for XFD Preparing key processes and documentation XFD directives: describe roles/responsibilities and prescribed actions XFD training plan and training records plan SAD, ASE to include NEH Instrument Readiness Review (IRR) process for adding capability to LCLS experimental area incrementally

9 H. Tompkins 9 NEH status NEH ARR – June 30, 2009 XFD operations roles XFD Director Develop long-range goals, schedules Authorize significant changes in operation Delegate operations authority to Operations Head XFD Safety Officer Oversee safety aspects of all XFD activities Participate in scheduling Participate in development of hazard mitigation plans Operations Head Manage operations User Administration Detailed User scheduling User logistics and general training

10 H. Tompkins 10 NEH status NEH ARR – June 30, 2009 XFD operations roles, cont. Area Manager Coordinate activities in area Manage maintenance in area Release work in area Floor Coordinator 24/7 coverage Release all work involving x-ray beams Instrument Scientist Release work on instrument Participate in scheduling Manage maintenance of instrument Supervise Users

11 H. Tompkins 11 NEH status NEH ARR – June 30, 2009 XFD staffing XFD began 2009 with some staff in place J. Schneider, J. Hastings, J. Arthur (upper management) H. Tompkins (NEH Area Manager) P. Stefan, S. Moeller (diagnostics physicists) N. van Bakel (detector physicist) J. Bozek (AMO scientist) D. Fritz, A. Robert, S. Boutet, Y. Feng (LUSI scientists) Matrix support from Laser group, Controls group, DAQ group, Rad Physics A total of about 20 people

12 H. Tompkins 12 NEH status NEH ARR – June 30, 2009 New staff supporting XFD early operations Z. Van Hoover (XFD Safety Officer) J. Bringetto (XFD Documentation Specialist) H. Kamil (LCLS User Admin) C. Bostedt (AMO scientist) D. Rich, J-C Castagna, M. Holmes (operations engineers) C. Brown, D. Peterswright, W. Polzin (Floor Coordinators) Being hired, needed for AMO commissioning 3 more Floor Coordinators (offers going out now) Coming soon, not essential for AMO commissioning Additional technicians Administrator Additional scientists XFD staffing

13 H. Tompkins 13 NEH status NEH ARR – June 30, 2009 End of Presentation