Estimation and Uncertainty H. Scott Matthews 12-706/73-359 Lecture 10 - Oct. 1, 2003.

Slides:



Advertisements
Similar presentations
Design of Experiments Lecture I
Advertisements

Mean, Proportion, CLT Bootstrap
6 - 1 Lecture 4 Analysis Using Spreadsheets. Five Categories of Spreadsheet Analysis Base-case analysis What-if analysis Breakeven analysis Optimization.
Chapter 8: Estimating with Confidence
Sampling: Final and Initial Sample Size Determination
Chapter 10: Estimating with Confidence
Uncertainty and Sensitivity Analysis H. Scott Matthews /
Engineering Economic Analysis Canadian Edition
1 Spreadsheet Modeling & Decision Analysis: A Practical Introduction to Management Science, 3e by Cliff Ragsdale.
Lecture 1: Basics of Math and Economics AGEC 352 Spring 2011 – January 12 R. Keeney.
Estimation and Uncertainty Dr. Deanna Matthews / Lecture 7 - Sept 18, 2002.
Estimation and Uncertainty / Lecture 2.
Estimation and Uncertainty / Original lecture by H. Scott Matthews, CMU Sept 24, 2003.
Estimation and Uncertainty / / Lecture 2 - August 31, 2005.
1 Civil Systems Planning Benefit/Cost Analysis Scott Matthews Final Review Courses: and Lecture /2/2002.
Software Tools for Sensitivity and Uncertainty Analysis H. Scott Matthews / Lecture 11 - Oct. 6, 2004.
1 Course Intro Scott Matthews / Lecture 1.
1 Business 90: Business Statistics Professor David Mease Sec 03, T R 7:30-8:45AM BBC 204 Lecture 23 = Finish Chapter “Confidence Interval Estimation” (CIE)
1 Civil Systems Planning Benefit/Cost Analysis Scott Matthews Courses: /
1 Simulation: Modeling Uncertainty with Monte Carlo /
Sensitivity Analysis and Uncertainty
1 Civil Systems Planning Benefit/Cost Analysis Scott Matthews Courses: and Lecture 8 - 9/23/2002.
1 Business 90: Business Statistics Professor David Mease Sec 03, T R 7:30-8:45AM BBC 204 Lecture 21 = Start Chapter “Confidence Interval Estimation” (CIE)
CHAPTER 6 DISCOUNTING. CONVERTING FUTURE VALUE TO PRESENT VALUE Making decisions having significant future benefits or costs means looking at consequences.
AGEC 608 Lecture 07, p. 1 AGEC 608: Lecture 7 Objective: Discuss methods for dealing with uncertainty in the context of a benefit-cost analysis Readings:
Estimation and Uncertainty / Lecture 8 - Sept 24, 2003.
Software Tools for Simulation H. Scott Matthews / Lecture 17 - Oct. 26, 2005.
Estimation and Uncertainty H. Scott Matthews / Lecture 10 - Oct. 4, 2004.
1 Simulation: Modeling Uncertainty with Monte Carlo /
CHAPTER 8 Estimating with Confidence
Estimation and Uncertainty / Lecture 3 - Sept 8, 2004.
Information Lecture 19 November 2, / /
Chapter 10: Estimating with Confidence
STA Lecture 201 STA 291 Lecture 20 Exam II Today 5-7pm Memorial Hall (Same place as exam I) Makeup Exam 7:15pm – 9:15pm Location CB 234 Bring a calculator,
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 7-1 Chapter 7 Confidence Interval Estimation Statistics for Managers.
Fundamentals of Data Analysis Lecture 4 Testing of statistical hypotheses.
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 9 Section 1 – Slide 1 of 39 Chapter 9 Section 1 The Logic in Constructing Confidence Intervals.
Today’s lesson Confidence intervals for the expected value of a random variable. Determining the sample size needed to have a specified probability of.
CHAPTER 8 Estimating with Confidence
+ The Practice of Statistics, 4 th edition – For AP* STARNES, YATES, MOORE Chapter 8: Estimating with Confidence Section 8.1 Confidence Intervals: The.
Applied Welfare Econ & Cost Benefit Analysis
Section 8.1 Estimating  When  is Known In this section, we develop techniques for estimating the population mean μ using sample data. We assume that.
Stat 13, Tue 5/8/ Collect HW Central limit theorem. 3. CLT for 0-1 events. 4. Examples. 5.  versus  /√n. 6. Assumptions. Read ch. 5 and 6.
Physics 114: Exam 2 Review Lectures 11-16
Standard Error and Confidence Intervals Martin Bland Professor of Health Statistics University of York
Engineering Economic Analysis Canadian Edition
+ The Practice of Statistics, 4 th edition – For AP* STARNES, YATES, MOORE Unit 5: Estimating with Confidence Section 10.1 Confidence Intervals: The Basics.
Copyright © 2015, 2012, and 2009 Pearson Education, Inc. 1 Section 6.1 Confidence Intervals for the Mean (  Known)
STA Lecture 191 STA 291 Lecture 19 Exam II Next Tuesday 5-7pm Memorial Hall (Same place as exam I) Makeup Exam 7:15pm – 9:15pm Location CB 234.
FIN 614: Financial Management Larry Schrenk, Instructor.
Sample Size Determination Text, Section 3-7, pg. 101 FAQ in designed experiments (what’s the number of replicates to run?) Answer depends on lots of things;
Chapter 12 Confidence Intervals and Hypothesis Tests for Means © 2010 Pearson Education 1.
Statistics for Decision Making Basic Inference QM Fall 2003 Instructor: John Seydel, Ph.D.
Inference: Probabilities and Distributions Feb , 2012.
Section 6.3: How to See the Future Goal: To understand how sample means vary in repeated samples.
Sensitivity Analysis and Uncertainty H. Scott Matthews /73-359/ Lecture 6.
One Sample Mean Inference (Chapter 5)
Materials for Lecture 19 Readings Chapter 14
INFERENTIAL STATISTICS DOING STATS WITH CONFIDENCE.
1 Probability and Statistics Confidence Intervals.
Copyright © 2015, 2012, and 2009 Pearson Education, Inc. 1 Chapter Confidence Intervals 6.
Dealing with Uncertainty Assessing a Project’s Worth under Uncertainty or Risk.
Project Management Lecture 22 Readings Chapter 14 Lecture 22 Short Project Management.XLSX Lecture 22 Project Management.XLSX Lecture 22 Event Management.XLSX.
Supplementary Chapter B Optimization Models with Uncertainty
Inference: Conclusion with Confidence
Project Management Lecture 22
“Teach A Level Maths” Statistics 1
Chapter 6 Confidence Intervals.
“Teach A Level Maths” Statistics 1
Chapter 6 Confidence Intervals.
Presentation transcript:

Estimation and Uncertainty H. Scott Matthews / Lecture 10 - Oct. 1, 2003

Problem of Unknown Numbers  If we need a piece of data, we can:  Look it up in a reference source  Collect number through survey/investigation  Guess it ourselves  Get experts to help you guess it  Often only ‘ballpark’, ‘back of the envelope’ or ‘order of magnitude needed  Situations when actual number is unavailable or where rough estimates are good enough  E.g. 100s, 1000s, … (10 2, 10 3, etc.)  Source: Mosteller handout

Uncertainty zInvestment planning and benefit/cost analysis is fraught with uncertainties yforecasts of future are highly uncertain yapplications often made to preliminary designs ydata is often unavailable zStatistics has confidence intervals – economists need them, too.

Sensitivity Analysis zMost of our discussions and examples have been simple (e.g. y=mx+b) zLife is not as simple as this  E.g. y=  x  zWe need to be able to create models and methods that can incorporate our uncertainties

Definition: “Base Case” zGenerally uses single values and our ‘best guesses’ zSensitivity Analysis acknowledges uncertainty exists zIncorporate variables instead of constant assumptions zIf our ‘Net Benefits’ remain positive over a wide range of reasonable assumptions, then robust results

How many variables? zChoosing ‘variables’ instead of ‘constants’ for all parameters is likely to make model unsolvable zPartial sens. Analysis - change only 1  Equivalent of  y/  x yDo for the most ‘critical’ assumptions yCan use this to find ‘break-evens’

Best and Worst-Case Analysis zDoes any combination of inputs reverse the sign of our answer? yIf so, are those inputs reasonable? yE.g. using very conservative ests. yMight want NB > 0, but know when NB < 0 ySimilar to ‘breakeven analysis’

Question 2.4 from Text z3 projects being considered R, F, W yRecreational, forest preserve, wilderness yWhich should be selected?

Question 2.4 Project “R with Road” has highest NB

Question 2.4 w/ uncertainty zWhat if we note that Benefits/Costs of each project are uncertain by plus or minus 10%? ye.g. instead of Project R having benefits of $10 million, could be as low as $9 million or as high as $11 million yRepeat for all project combinations zNow which project is ‘best’?

Question 2.4 w/ uncertainty Best Case: R w/Road (same) Worst Case: Road Only But difficult to determine that from this chart - can we do better?

Using error bars zShow ‘original’ point as well as range of uncertainty associated with point yRange could be fixed number, percentage, standard deviation, other zExcel tutorial available at: yhttp://phoenix.phys.clemson.edu/tutorials/ex cel/advgraph.html ySee today’s spreadsheet on home page yGraphs original points, and min/max deviations from that as error bars…

Error bar result Easier to see ‘best case/base case/worst case’ results - imagine moving a straight edge vertically up and down the axis to see result.

Case: Photo-sensors for lighting zSave electricity by installing sensors in areas where natural light exists ySensors ‘see’ light, only turn light fixtures on when needed zMAIN Posner 2nd floor hallway uses watt fluorescent bulbs for 53 fixtures zHow could we make a model to determine whether this makes sense? yAssume only one year time frame

Photo-sensors for lighting zAssume we only care about ‘one year project’ zCosts = Labor cost, installation cost, electricity costs, etc. yAssume each bulb costs $6 zBenefits = ? How should we set up model? yAssume equal, set up as ‘show minimum cost’ option zCase 1 ‘Status quo’: assume lights used as is yOn all the time, bulbs last 10,000 hours ~ burn out once per year) zCase 2 ‘PS’: pay to install sensors now, bulbs off between 1/3 and 1/2 of time

Lighting Case Study - Status Quo zCosts(sq) - lights on all the time yLabor cost: cost of replacing used bulbs x“How many CMU facilities employees does it take to change a light bulb?” - and how long does it take? xAssume labor cost = $35/hr, 15 mins/bulb x26.5 hours to change all bulbs each year, for a total labor cost of $927.50! Also, bulb cost $636/yr yElectricity: 106*15W ~ 14,000 kWh/yr (on 24-7) xCost varies from cents/kWh ~ $350-$1045 xCost Replacing bulbs is same ‘order of magnitude’ as the electricity! (Total range [$1,911 - $2,608])

Lighting Case Study - PS sensors zCosts(ps) - probably ‘off’ 1/3 - 1/2 of time yLabor cost: cost of installing sensors = ‘unknown’ yLabor cost: cost of installing new bulbs xCould assume 1/2 - 2/3 of bulbs changed per year instead of ‘all of them’ [Total $464 - $700] xBulbs cost [$318-$424] yElectricity: 106*15W ~ 7,000 1/2 x9,333 kWh if off 1/3 of the time xCost varies [ cents/kWh] ~ $175-$700 yTotal cost (w/o sensors) ~ [$955 - $1,740] yHow much should we be WTP for sensors if time horizon is only one year?

PS sensors analysis zWTP [$170 - $1,700] per year (NB>0) yWe basically ‘solved for’ benefit yBut our main sensitive value was elec. Cost, so range is probably [$919 - $1,129] per yr. yNo overlap in ranges - PS always better zShould consider effects over several years yCould do a better bulb replacement model zUse more ranges - Bulb cost, labor, time yCheck sensitivity of model answer to changes yFind partial sensitivity results for each yLook at spreadsheet model yThis is fairly complicated - easier way?

Monte Carlo Sens. Anal. zMonte Carlo analysis’ 3 steps yFirst, specify probability distributions ySecond, trial by random draws (plug them in) yThird, repeat for many (000s) of trials xProduces some distribution of results yLaw of large numbers says convergence ySee Appendix 7A for spreadsheet tutorial yhttp:// xSee sens anal and risk sim excel add-ins, PDFs

Final Notes on Uncertainty zIt is inherent to everything we do zOur goal then is to best understand and model its existence, make better results zWe ‘internalize’ the uncertainty by making ranges or distributions of variables zWe see the effects by performing sensitivity analysis (one of three methods)