McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., 2003 7.1 NETWORKS.

Slides:



Advertisements
Similar presentations
Network Models Robert Zimmer Room 6, 25 St James.
Advertisements

Network Models Robert Zimmer Room 6, 25 St James.
Network Models Robert Zimmer Room 6, 25 St James.
BU BU Decision Models Networks 1 Networks Models Summer 2013.
Network Flows. 2 Ardavan Asef-Vaziri June-2013Transportation Problem and Related Topics Table of Contents Chapter 6 (Network Optimization Problems) Minimum-Cost.
1 1 Slides by John Loucks St. Edward’s University Modifications by A. Asef-Vaziri.
Chapter 10, Part A Distribution and Network Models
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Chapter 11 To accompany Quantitative Analysis for Management, Eleventh Edition, Global Edition by Render, Stair, and Hanna Power Point slides created by.
Spreadsheet Modeling & Decision Analysis A Practical Introduction to Management Science 5 th edition Cliff T. Ragsdale.
Table of Contents Chapter 6 (Network Optimization Problems)
Optimisation Methods Network Models.
© 2008 Prentice-Hall, Inc. Chapter 12 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides.
Network Flow Models Chapter 7.
MNG221 - Management Science
Stevenson and Ozgur First Edition Introduction to Management Science with Spreadsheets McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies,
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
Introduction to Management Science
NetworkModel-1 Network Optimization Models. NetworkModel-2 Network Terminology A network consists of a set of nodes and arcs. The arcs may have some flow.
Computational Methods for Management and Economics Carla Gomes
Transportation Model (Powerco) Send electric power from power plants to cities where power is needed at minimum cost Transportation between supply and.
Transportation Models
Example 15.4 Distributing Tomato Products at the RedBrand Company
Max-flow/min-cut theorem Theorem: For each network with one source and one sink, the maximum flow from the source to the destination is equal to the minimal.
Network Flows Based on the book: Introduction to Management Science. Hillier & Hillier. McGraw-Hill.
Computational Methods for Management and Economics Carla Gomes Module 9d Network Models Maximum Flow Problem (Slides adapted from J.Orlin’s and Hillier’s)
Table 1. Shipping costs, Supply, and Demand for Powerco Example
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Network Models Chapters 6 and 7.
7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Network Flow Models Chapter 7.
7-1 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Network Flow Models Chapter 7.
Operations Research Assistant Professor Dr. Sana’a Wafa Al-Sayegh 2 nd Semester ITGD4207 University of Palestine.
Networks and the Shortest Path Problem.  Physical Networks  Road Networks  Railway Networks  Airline traffic Networks  Electrical networks, e.g.,
Network Optimization Models
Chapter 5 Network Models. Thomson/South-Western 2007 © South-Western/Cengage Learning © 2012 Practical Management Science, 4e Winston/Albright Introduction.
Introduction to Operations Research
Network Models Tran Van Hoai Faculty of Computer Science & Engineering HCMC University of Technology Tran Van Hoai.
The Supply Chain Customer Supplier Manufacturer Distributor
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Table of Contents Chapter 6 (Network Optimization Problems) Minimum-Cost Flow Problems (Section.
Table of Contents Chapter 7 (Network Optimization Problems)
Network Optimization Problem
Spreadsheet Modeling & Decision Analysis:
1 Minimum Cost Flows Goal: Minimize costs to meet all demands in a network subject to capacities (combines elements of both shortest path and max flow.
Minimum Spanning Trees: Chapter 6s The Modern Corp. Problem Modern Corporation has decided to have a state-of-the-art fiber-optic network installed to.
Network Optimization Problems
Stevenson and Ozgur First Edition Introduction to Management Science with Spreadsheets McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies,
DISTRIBUTION AND NETWORK MODELS (1/2)
Location decisions are strategic decisions. The reasons for location decisions Growth –Expand existing facilities –Add new facilities Production Cost.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 Network Models Transportation Problem (TP) Distributing any commodity from any group of supply centers, called sources, to any group of receiving.
1 Inventory Control with Time-Varying Demand. 2  Week 1Introduction to Production Planning and Inventory Control  Week 2Inventory Control – Deterministic.
Network Flow Problems Example of Network Flow problems:
Chapter 8 Network Models to accompany Operations Research: Applications and Algorithms 4th edition by Wayne L. Winston Copyright (c) 2004 Brooks/Cole,
Distribution Manager Supply Chain Man. (SCM), “Logistics” Transport Plans (Production Plans) Facility Location f.ex. warehouses Network Models: Minimal.
Chapter 5: Transportation, Assignment and Network Models © 2007 Pearson Education.
EMGT 5412 Operations Management Science Network Optimization Dincer Konur Engineering Management and Systems Engineering 1.
Mjdah Al Shehri Hamdy A. Taha, Operations Research: An introduction, 8 th Edition Chapter 6: Network Models.
Transportation, Assignment, and Network Models 9 To accompany Quantitative Analysis for Management, Twelfth Edition, by Render, Stair, Hanna and Hale Power.
Network Models Chapter 12
St. Edward’s University
Network Flow Problems – Shortest Path Problem
Network Models Please carefully study the following examples:
Network Models Chapter 12
Chapter 12 Network Models 12-1
Routing and Logistics with TransCAD
Transportation, Assignment and Network Models
MATS Quantitative Methods Dr Huw Owens
Chapter 5 Transportation, Assignment, and Transshipment Problems
Network Models Chapter 12
Chapter 6 Network Flow Models.
Network Flow Problems – Maximal Flow Problems
Presentation transcript:

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., NETWORKS

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Distribution Unlimited Co. Problem The Distribution Unlimited Co. has two factories producing a product that needs to be shipped to two warehouses –Factory 1 produces 80 units. –Factory 2 produces 70 units. –Warehouse 1 needs 60 units. –Warehouse 2 needs 90 units. There are rail links directly from Factory 1 to Warehouse 1 and Factory 2 to Warehouse 2. Independent truckers are available to ship up to 50 units from each factory to the distribution center, and then 50 units from the distribution center to each warehouse. Question: How many units (truckloads) should be shipped along each shipping lane?

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The Distribution Network

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Data for Distribution Network

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., A Network Model

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The Optimal Solution

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Terminology for Minimum-Cost Flow Problems 1.The model for any minimum-cost flow problem is represented by a network with flow passing through it. 2.The circles in the network are called nodes. 3.Each node where the net amount of flow generated (outflow minus inflow) is a fixed positive number is a supply node. 4.Each node where the net amount of flow generated is a fixed negative number is a demand node. 5.Any node where the net amount of flow generated is fixed at zero is a transshipment node. Having the amount of flow out of the node equal the amount of flow into the node is referred to as conservation of flow. 6.The arrows in the network are called arcs. 7.The maximum amount of flow allowed through an arc is referred to as the capacity of that arc.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Assumptions of a Minimum-Cost Flow Problem 1.At least one of the nodes is a supply node. 2.At least one of the other nodes is a demand node. 3.All the remaining nodes are transshipment nodes. 4.Flow through an arc is only allowed in the direction indicated by the arrowhead, where the maximum amount of flow is given by the capacity of that arc. (If flow can occur in both directions, this would be represented by a pair of arcs pointing in opposite directions.) 5.The network has enough arcs with sufficient capacity to enable all the flow generated at the supply nodes to reach all the demand nodes. 6.The cost of the flow through each arc is proportional to the amount of that flow, where the cost per unit flow is known. 7.The objective is to minimize the total cost of sending the available supply through the network to satisfy the given demand. (An alternative objective is to maximize the total profit from doing this.)

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Properties of Minimum-Cost Flow Problems The Feasible Solutions Property: Under the previous assumptions, a minimum-cost flow problem will have feasible solutions if and only if the sum of the supplies from its supply nodes equals the sum of the demands at its demand nodes. The Integer Solutions Property: As long as all the supplies, demands, and arc capacities have integer values, any minimum-cost flow problem with feasible solutions is guaranteed to have an optimal solution with integer values for all its flow quantities.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Spreadsheet Model

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The SUMIF Function The SUMIF formula can be used to simplify the node flow constraints. =SUMIF(Range A, x, Range B) For each quantity in (Range A) that equals x, SUMIF sums the corresponding entries in (Range B). The net outflow (flow out – flow in) from node x is then =SUMIF(“From labels”, x, “Flow”) – SUMIF(“To labels”, x, “Flow”)

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Typical Applications of Minimum-Cost Flow Problems Kind of Application Supply Nodes Transshipment Nodes Demand Nodes Operation of a distribution network Sources of goods Intermediate storage facilities Customers Solid waste management Sources of solid waste Processing facilitiesLandfill locations Operation of a supply network Vendors Intermediate warehouses Processing facilities Coordinating product mixes at plants Plants Production of a specific product Market for a specific product Cash flow management Sources of cash at a specific time Short-term investment options Needs for cash at a specific time

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The BMZ Maximum Flow Problem The BMZ Company is a European manufacturer of luxury automobiles. Its exports to the United States are particularly important. BMZ cars are becoming especially popular in California, so it is particularly important to keep the Los Angeles center well supplied with replacement parts for repairing these cars. BMZ needs to execute a plan quickly for shipping as much as possible from the main factory in Stuttgart, Germany to the distribution center in Los Angeles over the next month. The limiting factor on how much can be shipped is the limited capacity of the company’s distribution network. Question: How many units should be sent through each shipping lane to maximize the total units flowing from Stuttgart to Los Angeles?

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The BMZ Distribution Network

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., A Network Model for BMZ

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Spreadsheet Model for BMZ

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Assumptions of Maximum Flow Problems 1.All flow through the network originates at one node, called the source, and terminates at one other node, called the sink. (The source and sink in the BMZ problem are the factory and the distribution center, respectively.) 2.All the remaining nodes are transshipment nodes. 3.Flow through an arc is only allowed in the direction indicated by the arrowhead, where the maximum amount of flow is given by the capacity of that arc. At the source, all arcs point away from the node. At the sink, all arcs point into the node. 4.The objective is to maximize the total amount of flow from the source to the sink. This amount is measured in either of two equivalent ways, namely, either the amount leaving the source or the amount entering the sink.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., BMZ with Multiple Supply and Demand Points BMZ has a second, smaller factory in Berlin. The distribution center in Seattle has the capability of supplying parts to the customers of the distribution center in Los Angeles when shortages occur at the latter center. Question: How many units should be sent through each shipping lane to maximize the total units flowing from Stuttgart and Berlin to Los Angeles and Seattle?

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Network Model for The Expanded BMZ Problem

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Spreadsheet Model

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Some Applications of Maximum Flow Problems 1.Maximize the flow through a distribution network, as for BMZ. 2.Maximize the flow through a company’s supply network from its vendors to its processing facilities. 3.Maximize the flow of oil through a system of pipelines. 4.Maximize the flow of water through a system of aqueducts. 5.Maximize the flow of vehicles through a transportation network.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Littletown Fire Department Littletown is a small town in a rural area. Its fire department serves a relatively large geographical area that includes many farming communities. Since there are numerous roads throughout the area, many possible routes may be available for traveling to any given farming community. Question: Which route from the fire station to a certain farming community minimizes the total number of miles?

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The Littletown Road System

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The Network Representation

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Spreadsheet Model

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Assumptions of a Shortest Path Problem 1.You need to choose a path through the network that starts at a certain node, called the origin, and ends at another certain node, called the destination. 2.The lines connecting certain pairs of nodes commonly are links (which allow travel in either direction), although arcs (which only permit travel in one direction) also are allowed. 3.Associated with each link (or arc) is a nonnegative number called its length. (Be aware that the drawing of each link in the network typically makes no effort to show its true length other than giving the correct number next to the link.) 4.The objective is to find the shortest path (the path with the minimum total length) from the origin to the destination.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Applications of Shortest Path Problems 1.Minimize the total distance traveled. 2.Minimize the total cost of a sequence of activities. 3.Minimize the total time of a sequence of activities.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Minimizing Total Cost: Sarah’s Car Fund Sarah has just graduated from high school. As a graduation present, her parents have given her a car fund of $21,000 to help purchase and maintain a three-year-old used car for college. Since operating and maintenance costs go up rapidly as the car ages, Sarah may trade in her car on another three-year-old car one or more times during the next three summers if it will minimize her total net cost. (At the end of the four years of college, her parents will trade in the current used car on a new car for Sarah.) Question: When should Sarah trade in her car (if at all) during the next three summers?

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Sarah’s Cost Data Operating and Maintenance Costs for Ownership Year Trade-in Value at End of Ownership Year Purchase Price $12,000$2,000$3,000$4,500$6,500$8,500$6,500$4,500$3,000

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Shortest Path Formulation

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Spreadsheet Model

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Minimizing Total Time: Quick Company The Quick Company has learned that a competitor is planning to come out with a new kind of product with great sales potential. Quick has been working on a similar product that had been scheduled to come to market in 20 months. Quick’s management wishes to rush the product out to meet the competition. Each of four remaining phases can be conducted at a normal pace, at a priority pace, or at crash level to expedite completion. However, the normal pace has been ruled out as too slow for the last three phases. $30 million is available for all four phases. Question: At what pace should each of the four phases be conducted?

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Time and Cost of the Four Phases Level Remaining ResearchDevelopment Design of Mfg. System Initiate Production and Distribution Normal5 months——— Priority4 months3 months5 months2 months Crash2 months 3 months1 month Level Remaining ResearchDevelopment Design of Mfg. System Initiate Production and Distribution Normal$3 million——— Priority6 million$6 million$9 million$3 million Crash9 million 12 million6 million

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Shortest Path Formulation

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Spreadsheet Model

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The Optimal Solution PhaseLevelTimeCost Remaining researchCrash2 months$9 million DevelopmentPriority3 months6 million Design of manufacturing systemCrash3 months12 million Initiate production and distributionPriority2 months3 million Total10 months$30 million

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Minimum Spanning Trees: The Modern Corp. Problem Modern Corporation has decided to have a state-of-the-art fiber-optic network installed to provide high-speed communication (data, voice, and video) between its major centers. Any pair of centers do not need to have a cable directly connecting them in order to take advantage of the technology. All that is necessary is to have a series of cables that connect the centers. Question: Which cables should be installed to provide high-speed communications between every pair of centers.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Modern Corporation’s Major Centers

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., The Optimal Solution

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Assumptions of a Minimum-Spanning Tree Problem 1.You are given the nodes of a network but not the links. Instead, you are given the potential links and the positive cost (or a similar measure) for each if it is inserted into the network. 2.You wish to design the network by inserting enough links to satisfy the requirement that there be a path between every pair of nodes. 3.The objective is to satisfy this requirement in a way that minimizes the total cost of doing so.

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Algorithm for a Minimum-Spanning-Tree Problem 1.Choice of the first link: Select the cheapest potential link. 2.Choice of the next link: Select the cheapest potential link between a node that already is touched by a link and a node that does not yet have such a link. 3.Repeat step 2 over and over until every node is touched by a link (perhaps more than one). At that point, an optimal solution (a minimum spanning tree) has been obtained. (Ties for the cheapest potential link at each step may be broken arbitrarily.)

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Application of Algorithm to Modern Corp.: First Link

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Application of Algorithm to Modern Corp.: Second Link

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Application of Algorithm to Modern Corp.: Third Link

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Application of Algorithm to Modern Corp.: Fourth Link

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Application of Algorithm to Modern Corp.: Fifth Link

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Application of Algorithm to Modern Corp.: Final Link

McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Applications of Minimum-Spanning-Tree Problems 1.Design of telecommunication networks (computer networks, lease-line telephone networks, cable television networks, etc.) 2.Design of a lightly-used transportation network to minimize the total cost of providing the links (rail lines, roads, etc.) 3.Design of a network of high-voltage electrical power transmission lines. 4.Design of a network of wiring on electrical equipment (e.g., a digital computer system) to minimize the total length of the wire. 5.Design of a network of pipelines to connect a number of locations.