CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,

Slides:



Advertisements
Similar presentations
NeSSI – Enabling TCO Optimization 29 January 2008 – IFPAC2008, Baltimore MD NeSSI* – An Enabling Platform for the Reduction in TCO** of Process Analytical.
Advertisements

Process Gas Chromatography Siemens Process Chromatographs CPAC-NeSSI Report.pptSlide 1; November 8, 2007 Criteria for Design and Specification Discussion.
Complete, Modular, Ready Today 1 History of ISA SP76 NeSSI Current Standards ANSI/ISA (2002) IEC ( )
Marketing NeSSI™ Globally What’s the Plan?. Issues There are periodic requests for NeSSI™ information from the “press” Should we provide directed mailings.
NeSSI Open Session September 11 th, 2001 Room 311A, Convention Center 1:30 - to about 4:00 PM 1:30 PM. Introduction & review of 3 questions. 1:45 PM. Discussion/Breakout.
ISAExpo October 2003: Houston, TX NeSSI* - A Sampling and Connectivity Platform Comes of Age (* New Sampling/Sensor Initiative) “the best way to.
Instrumentation Surface Mount Technology for Process Analytic Sampling Systems Steve Doe, Parker Hannifin Corporation.
NeSSI*: Full Speed Ahead “Into the Project Stage” CPAC - Seattle, WA - Nov. 4, 2002 NeSSI End Users Group. “the best way to predict the future is to create.
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Interface to the Process Jim Tatera, Rob Dubois, Peter.
© 2006 Swagelok Company. Swagelok confidential. For internal use only. IS CAN Bus – CiA WD 103 Update Low Cost, Intrinsically Safe Transducer Bus Enabling.
IFPAC-NeSSI Report.ppt; 29 January 2008; Slide 1Siemens Energy & Automation, Inc. Criteria for Design and Specification NeSSI Issues Presentation to IFPAC.
IFPAC 2003: Wed PM-II Session "NeSSI: A Sampling Platform for Micro Physical and Micro Analytical Sensors" Session Chair: Peter van Vuuren ExxonMobil Chemical.
Modular Sampling System Initiative CPAC: Nov 6, 2000 Modular Sampling System Initiative Modular Sampling System Initiative Background and Status 2000 Fall.
I²C Bus Development An Implementation of the Generation 2 Bus Siemens Activities Silke Ebbing, March 2007.
NeSSI/ Micro-Analytics Workshop May 4-5, 2003: CPAC, Univ. of Washington, Seattle 2003 Spring Sponsor Meeting Center for Process Analytical Chemistry NeSSI*
This Dog Don’t Hunt* Rob Dubois IFPAC SM Arlington, Virginia, USA January 13, 2004 “the best way to predict the future is to create it” NeSSI™ *...or why.
© 2006 Swagelok Company. Swagelok confidential. For internal use only. NeSSI Life Cycle Cost Model CPAC FALL 2006 SPONSORS MEETING NeSSI WORKSHOP Thursday,
CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy,
NeSSI - Next Steps Turning Vision into Reality. May 9, 2001 Agenda CPAC Sampling Focus Group w Agenda Review and Comments about Monday Session [5 min]
Charting the path to NeSSI* Gen II a comparison of POCA & POCA-2 projects CPAC - Seattle, WA - Nov. 4, 2002 NeSSI End Users Group. “the best way to predict.
NeSSI – The “New Sampling Sensor Initiative” - An Enabling Technology A CPAC Sponsored Open Initiative Prepared by: –Rob Dubois – Dow Chemical –Peter van.
NeSSI™ Open Workshop IFPAC 2004 R. Dubois/J. Gunnell/J. Mosher January 14, 2004 Arlington Salon V 6:00-7:15 PM.
Small Smart Integrated Sensor & Sampling Systems CPAC: Nov 1, 1999 Small Smart Integrated Sensor & Sampling Systems Tutorial Session Sponsored by the Oil.
ISAExpo October 2003: Houston, TX AD Session: ISA03-P247 - Tutorial: AD Session: ISA03-P247 - Tutorial: NeSSI ™ - Evolution of a New Process Analytics.
ISAExpo October 2003: Houston, TX NeSSI - Examples of Some Recent Developments “the best way to predict the future is to create it”
15-Oct SP76.51 Meeting Symbol Library Update Tracy Dye, ABB Steve Doe, Parker Hannifin CPAC November 9, 2006.
New Sampling/Sensor Initiative (NeSSI) & Connectivity (ConnI) Update New Sampling/Sensor Initiative (NeSSI) & Connectivity (ConnI) Update CPAC: May 6,
NeSSI*: The Good, The Bad and the Ugly - Early Implementations and Directions IFPAC Scottsdale, AZ, USA - January 22, 2003 John Cumbus Rob Dubois “the.
Connectivity for PA Systems – Confusion or Opportunity IFPAC 2001 Connectivity for Process Analytical Systems: Confusion or Opportunity Peter van Vuuren.
Smart, Modular Sample Systems What’s in it for us Dan Podkulski.
New Sampling/Sensor Initiative (NeSSI) CPAC: November 5, 2001 NeSSI (New Sampling/Sensor Initiative) Status and Update Jim Tatera, Rob Dubois, Peter van.
YOU HAVE HEARD ABOUT MANY ADVANCES IN HARDWARE, SENSORS AND CONTROLS THESE HIGHLIGHT THE NEED FOR IMPROVED SAMPLING TECHNOLOGIES.
NeSSI*: Activities Update CPAC - Seattle, WA - May 5, 2003 NeSSI End-Users Group “the best way to predict the future is to create it” *New Sampling/Sensor.
MINIATURE MODULAR SAMPLE SYSTEMS – FROM CONCEPT TO REALITY David M. Simko, Swagelok Company Pittcon®2002 New Orleans, March 20, 2002.
Business Careers & Practices Week 1 Careers and Jobs in Accounting and Management Work Functions of Accounting and Management Technicians Business Functions.
NeSSI Update An Implementation of the Generation 2 Bus Siemens Activities November 2006.
Networked Sampling System (NeSSI-Generation II)
Networked Sampling System Development (NeSSI Generation II/III) Progress and Challenges John Mosher, Bob Nickels, Ulrich Bonne Honeywell International.
Solid Performance Solutions This presentation was created to give you the ideas and support to present “Rethinking New Product Training Development” in.
Operational Capability: An underlying simplification of a data encoding standard has been developing over the past decade and is being demonstrated in.
From Research Prototype to Production
NeSSI*: Key Aspects of the NeSSI Gen II Specification ISA - Houston, Texas, USA October 23, 2003 “the best way to predict the future is to create it” *New.
PHASED: a Faster, Smarter & More Affordable Analysis Device - Update U.Bonne, J.Detry, R.Higashi, K.Newstrom-Peitso, H.Pham,
Modular Sampling System Initiative CPAC/ISA: August 23, 2000 Modular Sampling System Initiative ISAEXPO2000 Meeting Center for Process Analytical Chemistry.
CPAC/NeSSI Workshop May 6, 2004 (Times are PST) Best Western University Tower Hotel, Seattle, Washington, USA AMPM 08:00 Welcome – M. Koch (CPAC Dir.)
1 Citius, Fortius, Altius: A New Sampling/Sensor Initiative (NeSSI) Rob Dubois & Peter van Vuuren.
NeSSI™ - Real Products at Work - Today Rob Dubois CPAC Spring Session Seattle, Washington, USA May 3, 2004 “the best way to predict the future is to create.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
1 CPAC NeSSI Focus Group May 3, 2004 Focus Group Agenda –Dave Veltkamp – Roll Out of NeSSI Knowledge Network website (30 min) discussion –John Mosher –
Utilizing NeSSI™ for Analytical Applications Dave Veltkamp, CPAC New Sampling/Sensor Initiative (NeSSI™)
Department of Energy Project Funding MicroAnalytical Sensors Development on NeSSI Platform John Mosher, Bob Nickels, Ulrich Bonne Honeywell International.
NeSSI  connectivity: progress on SAM and Smarts Jeff Gunnell ExxonMobil Chemical Limited.
Next Generation Process Analyzer System Connectivity CPAC Spring 2001 Next Generation Process Analyzer System Connectivity Issues Peter van Vuuren ExxonMobil.
New Sampling/Sensor Initiative (NeSSI) CPAC: May 7, 2001 NeSSI (New Sampling/Sensor Initiative) 2001 Spring Sponsor Meeting Center for Process Analytical.
Industry Analytics Initiatives: Status & Plans IFPAC 2002 January 23, 2002 San Diego, CA IFPAC 2002 Industry Analytics Initiatives: Status & Plans Session.
NeSSI-bus History, Evolution and Selection for Process Analytical CPAC, Seattle, WA, USA November 10, 2005 “the best way to predict the future is to create.
NeSSI II - A Platform for Micro-Analytical Devices
Swagelok confidential. For internal use only.
AGENDA: CPAC/NeSSI™ Workshop, 9 November, 2006
Copyright Danielle Dubois
Session Chair: Rob Dubois, Dow Chemical Process Analytical R&D
NeSSI* - Generation II “Revolution or Evolution?”
Introduction: the NeSSI generations
IFPAC NeSSI Update Item 1
Production The Purpose of Manufacturing and
IFPAC 2002 Roundtable January 23, 2002.
Copyright Danielle Dubois
Agenda: “Electrifying” NeSSI
ConnI (Connectivity Initiative) Status and Update
Modular Sampling System Initiative Background and Status
Presentation transcript:

CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy, Office of Industrial Technology CPAC-May’02 Ulrich Bonne

CPAC-May’02; U.Bonne - New Sampling/Sensor Initiative (NeSSI-II) May’02 CPAC Draft of White Paper to U.S. Department of Energy, Office of Industrial Technology OBJECTIVES Take updated set of NeSSI -II prototype specs and components from the concept stage, through several development steps to a productization plan stage. APPROACH via Tasks: 1. Agree on NeSSI-II specs 2. Build and lab test of first unit 3. Fabrication of NeSSI units 4. Field test and evaluate 5. Market assessment 6. Manufacturing cost estimate SCHEDULE - June ‘02 Presentation to DoE - June ‘03 DoE Funding starts - June ‘04 Tasks 1-3 done - June ‘05 Tasks 4-6 done Fig.1. Typical Sampling Train as Envisioned for a NeSSI-II Unit* * from “NeSSI-II Prelim.Specs..” by DuBois, vVuuren, Tatera

CPAC-May’02; U.Bonne - NeSSI Project Collaboration on - Spec Preparation c/w Sample System Test Design: CPAC (Rob, Peter, Jim, Ken) - Program Management: See Program Management (PM) -Steering Team - Sensor design and adaptation: Honeywell, Rosemount, ABB and others - Mounting base and fittings, including base & enclosure heater: Swagelok, Parker, CIRCOR, Kinetics,... - Combi Valve: Swagelok, Parker, CIRCOR,... - Design and adaptation of CAN-SDS or -DeviceNet communication system: Honeywell in collaboration with users and approval bodies - Design aspects needed for IS qualification, and other approvals: Honeywell with MTL, R. Stahl, P+F; Crouse Hinds, Turck, and other IS manufacturers - Integration and Assembly and Overall Electrical Approval: Spartech, others… - Manufacturing cost: Honeywell, Swagelok, Parker and others - Marketing study: Honeywell, Parker, Swagelok, ABB and others

CPAC-May’02; U.Bonne - Steering Team Contacts: Ulrich Bonne(763) PI/PM,Honeywell Labs Gregg Swenson(763) Bus. Dev.,Honeywell Labs Peter van Vuuren(281) PS Team, ExxonMobil Rob DuBois(780) PS Team, Dow Steve Doe(256) PS Team, Parker-H. Dave Simko PS Team, Swagelok TBD PS Team, DuPont TBD PS Team, ABB Steve Wright(423) PS Team, Eastman Ken Creasy(973) PS Team, Honeywell-SM Bob Nickels(815) PS Team, Honeywell-ACS Mel Koch(206) PS Team, U.Washington, CPAC Honeywell Labs (HL), State Hwy. 55, Plymouth, MN 55441