F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

Data flow: Main operation: From operation mode program via file operators to file operator servers Trigger generator: Trigger information will be distributed.
D. Lipka, MDI, DESY Hamburg; Temperature Simulation DCCT at PETRA III D. Lipka, MDI, DESY Hamburg.
CEPC BoosterDesign CEPC Booster Design FCC Week 2015, March, 2015 Marriot Georgetown Hotel Huiping Geng Presented for Chuang Zhang.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
ALPHA Storage Ring Indiana University Xiaoying Pang.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Ion Source Update. We now have 2 running sources Source B has been running since the first part of June Both sources have been modified extensively since.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
RREPS'11, Egham (UK) Status of Beam Loss Detector Tests and Developments at PETRA III & ESRF Gero Kube DESY (Hamburg) Introduction: PETRA III Extension.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Positron Source for Linear Collider Wanming Liu 04/11/2013.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
PETRA III, Status and Upgrade
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Status and prospects of VEPP-5 Injection Complex
DESY Test Beam Facilities - Status and Plan
G0 Backward Angle Accelerator Preparations
Junji Urakawa (KEK) for ATF International Collaboration
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
ERL accelerator review. Parameters for a Compton source
Design Study of the CEPC Booster
Interaction Region Design Options e+e- Factories Workshop
BEPCII Background Issues: Collimators and Masks
Proposal for a CESR Damping Ring Test Facility
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation Work laying ahead Operational constrains Summary

Injection for DORIS III and PETRA III Mode 1 (e+) : DORIS needs new injection every 8 hours PETRA runs in top up mode – one new bunch every 1-30 seconds, depending on current and lifetime Mode 2 (e- or e+): DORIS and PETRA are running in top-up mode 1 bunch to PETRA every 1-30 sec 1 bunch to DORIS every sec 450 MeV Linac: Gun delivers electrons, which can be converted to positrons after half of the linac PIA : accumulation of several linac pulses to increase the bunch current DESY : 12.5 Hz / 7 GeV Synchrotron – a trigger generator allows the extraction at different energies to either Doris or Petra

Geometry of the detector and the IP-region

Top view with radiation shielding

View to the IP-region from outside with ARGUS on the left side

Radiation issues: No of particles lost in 30 days at a lifetime of 0.6 h and a maximum current of 140 mA: ~ 5 E14 The dominant loss process is energy loss by bremsstrahlung – the particles would be lost mostly in the arc following the target and at the typical aperture limitations (Harwi, BW1, Septum) Particles lost in normal synchrotron radiation mode: between 3.3 E14 and 5.9 E14 per year ( ) → Radiation dose per year would be doubled Radiation shielding is sufficient Radiation level at HASYLAB with open beam shutters too high ( from measurements when we had a small vacuum leak ) – but the level should be fine when the shutters are closed A significant part would be lost at the wiggler chambers → to protect the permanent magnet material the wiggler gaps should be open and some wigglers have to be moved away from the beam pipe (1-2 days)

New optic with a reduced beam size at the IP : from σ x x σ z = 3.7 x 0.7 mm 2 to 1.1 x 0.3 mm 2 Due to the asymmetry of the detector the target cell is not at the IP but at about 0.75 m Optical functions at the insertion devices and injection are kept nearly unchanged

Target cell To reach a high gas density the target cell conductivity should be as small as possible The conductivity is proportional to the cross section divided by the inner surface of the tube Making the target cell the most stringent aperture limitation in the ring would probably cause background problems and could reduce the beam lifetime Present aperture limitations: –Wiggler BW1, β Z =6.7m, vertikal full aperture = 11mm –Absorber for Harwi, β X =15.5m, horizontal full aperture = 60mm Corresponding target cell dimensions: 28 x 7 mm 2 I would suggest an elliptical chamber of 30 x 8 mm 2 The conductance would be 75% of that of the present 15mm diameter circular pipe

Polarisation For the case that a beam polarisation could influence the cross sections M. Vogt and D. Barber calculated the expected polarisation at the energies of interest Of course the polarisation would be almost completely transversal! At 2.3 GeV: Rise time about 2.5 h and polarisation up to 90% shown are results for 10 seeds with a typical orbit distortion

6 min. rise time at 4.5 GeV 40 min. rise time at 3.1 GeV

View to the IP – the cavities has to be moved to SL 26m

Moving the cavities Present situation Changes for Olympus operation The 2 cavities would be moved to SL 26m The waveguide distribution would be changed such that 4 neighbouring cavities can still be connected to one RF-station – one waveguide passing Olympus Controls, interlocks etc. have to be changed accordingly the costs would be about 10 k€

Magnet power supplies 1 additional power supply is needed for the extra pair of quadrupoles –a device from Hera-p could be used here Most of the P.S. have to be modified to allow the polarity switching: –24 switches for 400 A : 60 k€ –10 switches for 800 A : 40 k€ –Mechanics, cabling and controls : 70 k€ → 170 k€

Injection elements Also the kicker pulses have to reverted Since the high voltage connections with well defined inductance can’t simply be switched, new pulsers would be needed which can change the polarity of the current pulse There are two kickers at DORIS and one at DESY The material costs per pulser including the HV power supply are 29 k€

Vacuum elements Valves to separate the IP-region from the rest of the ring Collimator insertions – have to be specified Intersections to connect the ring vacuum with the experiment vacuum system

Tasks for installing the detector :

Operational issues e + /e - operation of LINAC, PIA and DESY is possible – switching takes about 5 min. ( … on the long term DORIS and Petra should run with electrons only ) For a fast change of the polarity of the DORIS magnets additional power supply switches have to be installed. The change of the particle type in DORIS should be possible within one hour. Due to the lifetime reduction, energy changes and increased radiation a parallel operation with Hasylab is not possible. Due to the frequent changes of the particle type also a common operation with Petra III is excluded ( at least for the normal Top-up mode at Petra! ) The particle optic in DORIS is matched to keep the optical functions nearly unchanged at all wiggler positions – therefore it has not to be changed for the synchrotron radiation runs. The target cell can stay in the ring.

Summary The space for a detector like Blast is still available Some modifications (and investments) are necessary – but no “show-stoppers” are visible An optic has been developed which should work for synchrotron radiation runs as well as high energy runs The most time consuming work can be done outside the Doris tunnel and needs no shutdown time