Philae Status and News Venezia; 30 st of March 2009 4 th Philae Post-Launch Workshop.

Slides:



Advertisements
Similar presentations
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
Advertisements

European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
Status update of ASM on Swarm Charlie Swarm 4th DATA QUALITY WORKSHOP 2 December 2014 GFZ Potsdam Jean-Michel Léger.
Status of implementation of the Ronald Vargas and Ines Beernaerts Food and Agriculture Organization of the United Nations Samarkand, Uzbekistan - 10 September.
Mission: Launch 2014/15; Deployment June-August 2019, release alt. 100m Mission duration: 16 hrs of on-asteroid operation Main functions: On-surface up-righting.
Philae Science team meeting. Venezia, March 30, 31, April 1, 2009Palazzo Cavalli Franchetti.
4th Philae Science Workshop, Venice th Philae Science Workshop Venice, 30 March – 1 April ROMAP Status I. Apáthy, U. Auster, G. Berghofer, A.P.
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
Status Venice, 30-Mar-1-Apr 2009 Philae STW 2009.
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Instrument status Final discussion and wrap-up.
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
MOST Status J-F FRONTON / CNES Venice March 2009 LSWT#
Philae Science team meeting Venezia, March 30, 31, April 1, 2009 Palazzo Cavalli Franchetti 1. Criticality of SDL 2. Activity with Orbiter P/L ongoing.
Open Cruise Requirements status and planning LSWT#4, Venice 30/03-01/ LSWT#4.
PHILAE Science Team, Venice LTS phase: the LS standpoint prepared by HBO LTS phase: from end of FSS (mid Nov. 2014) to end of Rosetta mission (31.
Tuesday, March 31Philae Science team meeting Venice March 30 – April 1, 2009 APXS STATUS G. Klingelhöfer (PI) J. Gironés López J. Brückner (Co-I) R. Gellert.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
SDL: MOST point of view CNES / J-F Fronton / D Hallouard LSWT Venice, 30/03-01/04/2009.
Venezia, Mar/Apr 20094th Philae post-launch workshop1 Status Reinhard Roll.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
AMS02 TIM CAB Project Status JSC, January 2007 Prepared by H. Cuesta / G. Muñoz.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Status Graz, 24/25 Oct 2013 MUPUS Team Meeting. 2 LOWG#12, DLR Cologne 18-20th of November 2008 PEN inflight calibration 4  14 inflight calibration points.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
PHILAE Science Team, Venice Philae On-Comet Science Objectives prepared by HBO Document name = Scientific Objectives of the PHILAE Mission (RO-LAN-LI-1000),
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
Payload Safety Review Plan and Issues Leland D. Hill.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
SESAME Status and Cruise Phase Activities
RSOC Overview at SWT #26, 11/12 June 2009
New Horizons launches Neptune orbit crossing
OSIRIS operation summary
I&T&C Organization Chart
SESAME Status, Science goals and On-Comet Activities
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
Solar Orbiter Instrument Testing by MOC-SOC
Philae status 21st Rosetta Science Team meeting
SESAME: Status and On-Comet Science
SD2 Kevin Walsh 16 Feb, 2016.
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
WP 4 - Revision of Natura 2000 dataflow
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
Presentation transcript:

Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop

2 4 th Post Launch Philae Science WS, Venezia, March 2009 Overview  Philae In-flight Activities  Ground Activities  LCC Funding Situation

3 4 th Post Launch Philae Science WS, Venezia, March 2009 Flight Events  In 2008/09 Philae was switched on during 6 operational blocks:  Šteins Rehearsal(Apr 2008)  Active Checkout PC8 (July 2008)  Šteins Flyby(September 2008)  COSAC/CIVA Contingency Slot(November 2008)  Passive Checkout PC9(January 2009)  Thermal Characterization(February 2009)  Operations Activities successful  Problems / Areas of concern (mostly known problems)  Increased secondary battery discharge  Temperature gradients inside Lander higher than estimated  DPU1 booting problem at low temperatures  ESS converter temperatures  Certain deficiencies in CDMS S/W 6.98 (compared to 7.0)  COSAC HV problems with new SW not understood

4 4 th Post Launch Philae Science WS, Venezia, March 2009 Philae In-flight Operations (I)  Šteins Flyby Rehearsal  Test of Solar generator (successful)  Shadowing affects lead to “initial confusion”…  Active Payload Checkout #8 (July 2008)  Maintenance:  New operations:  Upload of CDMS S/W 6.98  Problems:  CDMS  COSAC  CIVA  APX

5 4 th Post Launch Philae Science WS, Venezia, March 2009 Status of CDMS S/W  Version 6.98 successfully uploaded in PC8  It was recommended by the last LOWG#12 to upload final SW version 8.0 prior to DSH (deep space hibernation) in PC12  Workshops for SDL and LTS established; inputs to CDMS SW still pending; due end of April (next SDL/LTS meetings 27/28-April 2009)  Several mission critical aspects need to be taken care of  CDMS SW delivery planned for September 2009  Verification period September to November 2009  SW Upload in April 2010

6 4 th Post Launch Philae Science WS, Venezia, March 2009 Philae In-flight Operations (II)  Šteins Flyby  ROMAP, SESAME and MUPUS operational  ROMAP detects no magnetic signatures due to asteroid  SESAME and MUPUS perform successfully calibration  COSAC/CIVA Contingency Slot (CNT2)  “old” COSAC S/W uploaded  COSAC seems to work nominal (again) with pre-PC#8 SW  COSAC H/W apparently ok  Problem not understood  planned CIVA SW downgrade abandoned  CIVA worked well (no dummy images sent)  Problem during PC#8 not understood

7 4 th Post Launch Philae Science WS, Venezia, March 2009 Philae In-flight Operations (III)  Passive Checkout PC#9  Standard Procedure  Add. APXS measurement  Thermal Characterization (THC2)  Contribution to Lander Thermal Characterization  Calibration measurements for SESAME and MUPUS

8 4 th Post Launch Philae Science WS, Venezia, March 2009 Ground Activities  GRM refinement  Open work for ADS: EQM model exchange; FM01 model implementation planned to be finished by May 2009 GRM is used for all Flight ops preparation !!  Development tests for next CDMS S/W v8.0  Development tests ongoing; SW v8.0 verification period expected for Sep - Nov 2009  LCC Status  Upgrade of ESA interface (PDOP) ongoing  DAVIS (upgrade development delayed, but continues)  SCrOP, Annex G The document provides an overview on the status of all Philae Cruise Phase requirements  Last version V1.5, 11th of December 2008, distributed to RSOC/RMOC and Lander Team  Lander Software Simulator  upgrade delayed due to priority on CDMS SW v8.0 development, but continues

9 4 th Post Launch Philae Science WS, Venezia, March 2009 LCC Funding Situation  New Project plan, based on results of independent review from September 2007 now agreed  Shared LCC funding between DLR Agency and DLR R&D  New staff in the LCC team  Jens Biele (Payload Management)  Ed Trollope (Lander Simulator, Ops preparation (Šteins, Lutetia))  Christian Krause (RLGS Support)  Koen Geurts (GRM, Ops preparation)  Hans-Herbert Fischer (LCCS support, (SESAME)  Franziska Lenski (QA at MUSC)