MICE Project Board 23 rd September 2010 Liquid Hydrogen and General Infrastructure M Hills T Bradshaw M Courthold S Griffiths T Hayler S Ishimoto A Lintern.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Mechanical Safety Systems and DSEAR Compliance
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 Technical Co-ordination, Phase One The shared post of PM/TC has worked quite well Six months ago there was much for us to learn:  Revised the WBS 
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
MOM Report Galina Vankova RAL, MICE Video Conference.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
CM31 - Vacuum System Update Mike Courthold Matt Hills 1.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
S A Griffiths CM42 June 2015 Electrical & Control.
Liquid Hydrogen Infrastructure Update
MICE CM31 Schedule summary
Presentation transcript:

MICE Project Board 23 rd September 2010 Liquid Hydrogen and General Infrastructure M Hills T Bradshaw M Courthold S Griffiths T Hayler S Ishimoto A Lintern I Mullacrane A Nichols D Summers P Warburton C White

MICE Project Board 23 rd September 2010 Outline 1.Infrastructure progress up to now /11 Plans 3.RF Infrastructure 4.Electrical Infrastructure and Sub-Station 5.Hydrogen System and Infrastructure i.The R&D System ii.Absorbers iii.Windows iv.Integration with the AFC 6.Summary 2

MICE Project Board 23 rd September Circa Circa 2007 But this is what we’re aiming for >>

MICE Project Board 23 rd September  Integration engineering of the experiment is driven from a single 3D CAD model (in Solid Edge)  This allows accurate checking of module positions and interfaces  But it doesn’t include much of the infrastructure needed to run the beamline....yet....Installation of MICE Step VI in R5.2

MICE Project Board 23 rd September 2010 Infrastructure Progress Much has been achieved since 2007:  Installation of false floor  Provision of module positioning system for Spectrometer Solenoids  Construction of magnetic shield walls (150 tonnes of iron)  Provision of CCR cooling water system  Up-rated compressed air system  Installation of air conditioning  Up-rated the domestic power, lighting & fire detection  Compliance of R5.2 to all safety & local rules  Installation of extract fans  Accommodation for 28 CCR compressors and services  General civil engineering work 5

MICE Project Board 23 rd September 2010 Planning for 2010/11  Infrastructure for STEPS II and III is complete  Now switching focus to preparation for STEPS IV and V:  RF power work  Design of waveguide/power/cooling infrastructure, placement of amplifiers  ‘Hands on’ work at DL with RAL team – second LBNL amplifier  Advance work on the LH2 system  Vent system  Civil engineering  Pipe/valve & gas panel work  Start work on the Electrical Sub- Station upgrade 6

MICE Project Board 23 rd September 2010 General Infrastructure - Current Work  A new extension to the north mezzanine to accommodate an increase in the number of electronics racks needed for the cooling channel.  A steel cladded building for the LH2 system vacuum pumps on top of the MICE roof and a platform to support the Hydrogen stacks.  Security and protective fencing on the MICE hall roof and pedestrian walkway.  PPS fences and gates for the RF enclosure.  Main door refurbishment and connection to the PPS system.  Gas bottle store outside the MICE hall.  Preparations for laying the floor for step III.  A mechanical system to move the MICE modules, AFC and RFCC, in and out of the beam.  Installation of the RF amplifiers and layouts of the RF components between the Amplifiers and the Cavities. 7

MICE Project Board 23 rd September 2010 RF Power  Two RF amplifiers from LBNL are being reconditioned at DL –Assembly of the first TH116 amplifier circuit is complete, the other is waiting –Plan to deploy some of existing team on second amplifier –Important to do this early while we have time –Led by Daresbury Lab –Very beneficial DL/RAL relationship –RF amplifiers quite big, 4m high and 1 tonne – we have to fit four of them in a very confined space 8

MICE Project Board 23 rd September Need to fit all this Under here!

MICE Project Board 23 rd September 2010 Electrical Infrastructure - Current Work The Daresbury Electrical Engineering, Power Supplies and Controls group continue to progress work on the electrical infrastructure including:  The main power-distribution system design  The cable management for networks  The personnel protection system  AC distribution, lighting and fire protection  Control cables, designs for control racks for the tracker, diffuser and spectrometer solenoids  Work on the Target, Decay Solenoid and Liquid-Hydrogen system The Daresbury group have proved invaluable in getting all areas of the electrical infrastructure work done; the relationship between the two sites RAL and Daresbury is working extremely well.

MICE Project Board 23 rd September STEP I Present power rating (1.25MVA) Point at which we’re in trouble  The electrical supply the MICE Hall needs to be upgraded from 1.25MVA to 2MVA, certainly to run at Step IV and probably at Step III.  A technical solution has been chosen that employs all new transformers, switchgear and cabling.  A list of suitable suppliers has been identified and they are being invited to take part in a (non OJEU) tender exercise.  The delivery date cannot be specified exactly until the project plan is made, but it is not anticipated to be later than Q3, Electrical Substation Status

MICE Project Board 23 rd September 2010 Hydrogen System 12 Relief lines Ventilation ducts Fans Test Cryostat Gas Panel Enclosures

MICE Project Board 23 rd September 2010 Ventilation System Basis of safety –Eliminate sources of ignition ATEX rated fans –Fans have been purchased and are ready to install –Quotes for the ductwork and installation currently being sought through BPG 13

MICE Project Board 23 rd September 2010 Vacuum System –Dedicated pump enclosure to be sited on MICE Hall roof –Will house backing pumps required for all 3 hydrogen systems –Designated Hydrogen Zone 2 (same as Gas Panel Enclosures) for DSEAR purposes –Turbo pumps for AFC modules’ safety vacuum to be sited on South Wall in present plan –Pipe diameters will need to be large (approx. 150mm) to achieve required vacuum Turbo pumps Backing pump 14

MICE Project Board 23 rd September 2010 Safety - DSEAR Zoning  Test Cryostat (or AFC absorber vacuum space)  Gas Panel Enclosure  Pump Enclosure  Connecting ductwork...are Zone 2. (“A place in which an explosive atmosphere....is not likely to occur in normal operation, but, if it does occur, will persist for a short period only.”) The MICE Hall is not 15

MICE Project Board 23 rd September 2010 Safety Issues  Dealing with a power outage  System is passively safe in event of over-pressure  But what about a leak?  The ventilation system is power hungry (2 x 4kW fans) and would require a significant investment (either very large UPS or diesel generator) to keep it running in a mains failure.  An alternative option may be a controlled vent of the hydrogen in the system  Under discussion with MICE TB.  Safety review process  Review of the design conducted in 2005, but control system was not part of this  Clear that a pre-operation safety review is required, but the exact format of this is still to be finalised  Already working with ISIS on safety issues so there shouldn’t be any surprises 16

MICE Project Board 23 rd September 2010 R&D System Manufacture  Buffer Volume, Transfer Line, Test Cryostat and Gas Panel all complete (including wiring of instrumentation)  Manufacture of the enclosure is underway 17

MICE Project Board 23 rd September 2010 Acceptance Testing Several Purposes:  Leak testing  Pressure testing (and certification)  Full system cool-down with buffer tank and gas panel  Testing of instrumentation and logging on PLC  Some testing of control sequences for helium

MICE Project Board 23 rd September 2010 Test Results (1) 19

MICE Project Board 23 rd September 2010 Test Results (2) 20

MICE Project Board 23 rd September 2010 Absorber Development & Testing (KEK)  Absorber #1 now assembled (including temperature and level instrumentation) and tested  See following slides for test results  Some possible improvements to increase H2 liquefaction rate already being considered.  Interface check with Mississippi Window required  Absorber #2 being manufactured

MICE Project Board 23 rd September 2010 Hydrogen Absorber Cooldown 22 Cooling without LN2; 4.5 day Cooling with LN2; 1 day Absorber body H2-IN pipe H2-OUT pipe Absorber temperatures

MICE Project Board 23 rd September 2010 Hydrogen Liquefaction 23 H2 Liquefaction Speed ; 2.5 l/day at 1 bar, 20K Time to Fill 20 L Absorber; 8 days

MICE Project Board 23 rd September 2010 Windows (University of Mississippi) 24  CNC machining 20 aluminum windows to contain LH2  MICE needs 6 LH2 windows and 6 safety windows  MICE needs 5 spares and 3 windows destructively tested  Destructively tests of some windows at T=77K and 300K  Fixtures for destructive LN2 and H2O tests completed  Will pressurize liquid with a tiny volume of throttled helium  Window Production –All 20 windows have been roughed out of 6061-T6 aluminum –Windows turned on lathe with a machined backing plate –Turned on lathe to 2000 microns central thickness –UMiss micrometer measures at 0 and 15 degree angles –LBNL-Berkeley non-contact View Precis 3000 optical CMM  First 11 windows completed. –Burst test 2 windows at 300K, 120, 122 psi (8 atmospheres)

MICE Project Board 23 rd September 2010 Integration with the AFC –RAL, Oxford, KEK and Tesla are working together to ensure that the R&D system and Absorber are compatible with the AFC module –Instrumentation (i.e. level sensors, pressure sensors and thermometry) which must be compatible with UK regulations (i.e. DSEAR – we can ‘self-certify’) –Space for instrumentation connectors –Process line connections –Mechanical mounting in the AFC bore (heat leak issues) 25

MICE Project Board 23 rd September 2010 Absorber Testing at RAL 26 This…into this… Aims:  Iron out any mechanical integration issues  Confirm absorber instrumentation can be read by H2 control system and that all the information required for the control sequences is available

MICE Project Board 23 rd September 2010 Summary  Infrastructure for MICE STEP IV and beyond includes several technically challenging systems  Plan for 2010/11 is to mitigate the associated risks by progressing work in key areas:  H2 Infrastructure  H2 R&D Testing (including the KEK absorber)  RF Infrastructure  Electrical Sub-Station  Both the RF and H2 systems are complex installations with input required from many parts of the collaboration; getting them to work will require an even greater degree of cross-collaboration working  Need to make best use of the ISIS shutdown (September 2010 – March 2011) while there is no call for data taking