GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 September Status 09-01-04.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
GLAST Large Area Telescope:
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration James Swain Stanford Linear.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT Project4.1.7 G. Haller V22 Test-Stand Summary Finished TKR test-stands ACD was already finished Produced 3 more CAL FM TEM/TPS including conformal coating/stacking –Were 2 short, made one additional spare, in testing Added one compete test-stand for trigger (Su Dong/Martin) –Delivered GASU’s were delivered to I&T, only PDU remains to be provided (in test)

GLAST LAT Project4.1.7 G. Haller V23 Test-Stand Maintenance TKR Returns –One TEM came back for repair, output signal was shorted to VCC, possible from safe-to-mate probing and shorting out two neighbor pins (saw that before) ACD Returns –One VME crate failed (power switch). Being replaced. CAL Returns –One CAL TEM Bit was stuck in GCCC ASIC. Original TEM test did use unscreened ASICs. ASIC screening test does test all FIFO bits. Suck bit was shown in ASIC test. ASIC replaced, tested, returned to NRL. –CAL FM#1 TPS, see next slide

GLAST LAT Project4.1.7 G. Haller V24 CAL FM#1 TPS FM#1 TPS passed initial vib test at NRL, then failed when vibrated on CAL. Sent back to SLAC. Investigation: –One connection of surface-mount inductor (DAQ Supply-section) lost contact to board. Resulted that TEM voltages were 0; thus no TEM power. –FM#1 and FM#2 were stacked by in-house tech, all others were stacked at vendor –Flight relevance: EM inductors have only two surface-mount leads. Package used on flight TPS board has 4 leads for better mechanical connection (plus stacked at flight-assembly house). Stacked in-house: Inductor failure stacking apparently not sufficient Stacked by vendor

GLAST LAT Project4.1.7 G. Haller V25 ACD Teststand Last ACD test-stand was already delivered last month Issue with high-rate testing -> CPU crashes -> GASU needs to be power-cycled (since high-rate trigger is still present and will crash CPU as soon as it is up) –Cause: CPU fills up 100% and, due to CPU/LCB bug, CPU crashes –Happens at about 300 Hz (note that TKR, CAL run several KHz, DAQ up to 5 KHz without problems). Difference is how events are processed by sub-system software. Mitigation: Short Term: –DAQ/I&T to send ACD instruction on how to reset GASU after CPU crash so that GASU does not need to be power-cycled. (Done as of yesterday) –ACD to either Change code to process all events off-line (transmit from CPU to PC instead of process them in the CPU), or Change code to process only fraction of events real-time in CPU (prescaling) –Testing can continue by First look at rate-counters to confirm that rates are not high If rates are low, one can take data, if rates are high, there is a problem anyways Mitigation: Longer Term (couple of weeks) –DAQ/I&T to send ACD 4 each LCB’s with updated FPGA code New revision I&T release (back-ward compatible, transparent) –This will fix crashes, but in order to do high rate processing, ACD code still needs to change code as described above

GLAST LAT Project4.1.7 G. Haller V26 TEM/TPS Production Status Received Novacaps, another cap which was surge-tested, parts from lead-forming Parts kit shipped to General Technology, being audited Interim Milestones –TEM/TPS Qual + 2 ship to I&T 12/1/04 –TEM/TPS Production units to I&T 3/7/05 Tasks left to be completed –Release of some modified test procedures –Delivery/review of detailed vibration/TC procedure from GT –Delivery of test-stands including engineers to GT (in two weeks) Schedule risk mitigation efforts in process –3x weekly production meetings to assign and status action item matrix (Brigitte Estey) –1x weekly meeting with assembly house to prepare for production and work documentation/process issues prior to receipt of kits

GLAST LAT Project4.1.7 G. Haller V27 ASIC All GTCC1, GCCC1 TEM ASIC’s screened –Function/Performance test: 95% yield –Burn in –No failures after burn in Radiation testing –7 burned-in samples TID tested, up to 10 krad, no failures –1 non-burned in sample tested, no failures –Original plan was for 8 burned-in chips NCR to be created GLTC ASIC’s (for GASU) –Test documents to be released before testing can commence

GLAST LAT Project4.1.7 G. Haller V28 GASU & GASU-PS & PDU & SIU Brigitte is working on getting very detailed production schedule entered (like for TEM/TPS) Driver is getting all fabrication documentation approved and contract put in place –SIU/EPU mechanical drawings released Requisition written for flight fabrication –PDU mechanical drawings in review Requisition written for flight fabrication –GASU mechanical drawings in review Requisition written for flight fabrication Drivers –Getting parts audited to check whether there are problems (not on reel, correct parts, not sure-tested, late parts, etc) –Getting SIU/PDU/GASU internal harness components ordered Have draft SOW, need vendor to quote on –Getting Assembly SOW written and PO placed –Getting electronics drawings released

GLAST LAT Project4.1.7 G. Haller V29 GASU & PDU & SIU Electrical GASU: –Added poly-switches in each of the 12-FREE power-switch channels. Reason is to isolate one FREE power-switch failure from impacting other 11 boards. –Some cap foot-prints are being modified on flight GASU layout. Will be resubmitted for release next week. Including BOM. PDU: –Flight layout finished, in review –BOM, layout, schematic

GLAST LAT Project4.1.7 G. Haller V210 GASU & PDU & SIU Electrical SIU/EPU –LCB FPGA code change in concert with FSW driver update. Will update all LCB boards including LCB PCMCIA cards on VME processors in EGSE –Problem found on SIB/LCB Requirement to turn on 3.3V to ACTEL after 2.5V to ACTEL (GIDEP alert from ACTEL) Design works for reasonable turn-on of 28V supply source 3.3V feeds 2.5V converter, which in-turn controls power-delay switch to generate 3.3V-actel Works for SIU Problem in EPU, since PDU limits in-rush current and resulting power- up ramp is 80 msec MAX724 5-V supply starts working at 7V, IR AFL 28/3.3V converter hybrid only at 16V. When 5V comes on that much earlier than 3.3V supply together that there is apparent leakage (pull-up R’s, etc) from 5V to 3.3V-actel: –3.3V-ACTEL is comes up, via 5V, before 2.5V –Solution: added two NPN transistors on crate-power supply to inhibit MAX724 until 3.3V is coming up Works, but CPS needs to be modified –In addition some pull-up resistors needs to be added on SIB board to insure address 0 of EEPROM does not get corrupted by power-up.

GLAST LAT Project4.1.7 G. Haller V211 Heater Control Box & Harness Heater Control Box drawings sent for release Harness drawings submitted for review/release SOW for harness in progress.

GLAST LAT Project4.1.7 G. Haller V212 FES/Testbed Status Hardware Complete: –All 16 TEMs, GASU, PDU upgraded –ACD-FES Cabling Complete –System connectivity verified using FES FES input datasets have been generated from GLEAM MC –Mostly muons in tower centers –With this MC, the FES has been used to self trigger the LAT Resulting in the readout of all 16 Towers Rates up to 10 KHz w/o deadtime Rate of 20 KHz results in well understood deadtime. Run durations of ~minutes Data integrity checked by eye –Collaborators from The OSU have been integral in the process The FES/Testbed is now being used to test T&DF design!

GLAST LAT Project4.1.7 G. Haller V213 FES/Testbed Plans Immediate Goals –Begin using “new LCB” and associated FSW when available –Begin systematic tests of all aspects of T&DF Data integrity Timing and edge effects –Take data for extended periods (hours-days?) without error –FES/TB will be used for SIIS Acceptance Longer Term –Testing the Event Filter (recall, this is the original purpose of the FES/TB) FSW & SW Testing driven by requests FES/TB Group –Weekly meetings –OSU group instrumental in the development of tools to verify T&DF

GLAST LAT Project4.1.7 G. Haller V214 Schedule/Budget Total budget: $22,055 Work Scheduled up to date: $20,048 Work Performed: $ Actuals: $19,295 Schedule Variance $-2,112k (-10.9%) –Qual/Flight work should have been started, reflects current status Cost Variance: $-1,360k (-7%) EGSE is over budget ( )