US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.

Slides:



Advertisements
Similar presentations
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
Advertisements

MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
US CMS Si Tracker Project presentation to the Program Management Group at Fermilab; 22 October 2004, J. Incandela (UCSB) 1 US CMS Silicon Tracker Project.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Comprehensive Review June 28,
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Annual Review June 15, 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the illustrious and colorful TOB Group Tracker General Meeting.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 1 UCSB in CMS.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Status Brussels GANTRY
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
US Module Production Status
UCSB Testing Status Anthony Affolder
Results from module testing
Hardware Needs (Near Term)
On behalf of the US TOB testing group
US Testing Mailing List
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
TEC Module Production Overview
Hybrid & Module Electrical Testing
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Operations/Failure Analysis
Operations/Failure Analysis
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
Current Necessary for CMN Problem
US Module Testing Progress Report
Operations/Failure Analysis
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004

US CMS Module Production Report - July 2004 – CERN Tracker week 2 Covered in this talk US Group Evolution past year and upcoming year Status of all production equipment and manpower Making US production lines fully robust Steps we have taken What we still need from CMS at large Planning for upgrading production capacity further

US CMS Module Production Report - July 2004 – CERN Tracker week 3 Preparing for the mad rush Eventually we will get good parts in large quantities Deliveries will not be smooth Meeting the schedule will require Higher than expected peak production rates Extremely robust and stable production lines Well trained personnel Current proven capacity in US is 15 modules/day/site Further capacity expansions are possible No further fabrication equipment needed and no expansion in test equipment required Achieve by extending work day (split shifts) and/or adding support personnel to major production tasks Rates under study: FNAL: 18/day sustainable and 21/d peak UCSB: 21/d sustainable and 24-27/d peak

US CMS Module Production Report - July 2004 – CERN Tracker week 4 US CMS Tracker Group Brown University R. Hooper, G. Landsberg, C. Nguyen, H. Nguyen University of California, Riverside (UCR) P. Gartung, G. Hanson, G.Y. Jeng, G. Pasztor University of California, Santa Barbara (UCSB) A. Affolder, S. Burke, C. Campagnari, F. Garberson, D. Hale, J. Incandela, P. Kalavase, S. Kyre, J. Lamb, S. Stromberg, R. Taylor, D. White + technicians University of Illinois, Chicago (UIC) E. Chabalina, C. Gerber, L. Nigra, T. Ten Fermilab (FNAL) M. Demarteau, A. Ronzhin, K. Sogut, L. Spiegel, S. Tkaczyk + technicians University of Kansas (KU) P. Baringer, A. Bean, L. Christofek, D. Coppage Mexican Consortium: Cinvestav: H. Castilla, R. Perez, A. Sanchez Puebla: E. Medel, H. Salazar San Luis Potosi: A. Morelos University of Rochester (UR) R.Demina, R. Eusebi, E. Halkiadakis, A. Hocker, S. Korjenevski, P. Tipton 19 joined group this past year (includes 3 UCSB technicians) We are in the process of adding a few more post-docs & students 9 left or soon to leave the group (includes KSU and 2 UCSB technicians) Manpower no longer a critical concern

US CMS Module Production Report - July 2004 – CERN Tracker week 5 Assembly Plates UCSB Plates # Fabricated (parts made) # Commissioned (ready to be used) plates used in module production so far TOB R-phi775 TOB Stereo331 TEC R5 R-phi222 TEC R5 Stereo222 TEC R6555 TEC R7*200 Total  FNAL TOB assembly plates (all used in production already)  5 r-phi  3 stereo Total of 29 plates in the US  FNAL TOB assembly plates (all used in production already)  5 r-phi  3 stereo Total of 29 plates in the US

US CMS Module Production Report - July 2004 – CERN Tracker week 6 US Production Steps/Status TaskCapacityManpower issuesSoftware Issues? Hardware Issues Hybrid Bonding & Thermal Cycle 84/dMexico has only one experienced tech. Recently resolved No Module Assembly>30/dNoneNo Module Bonding>30/dNoneNo ARC Testing>30/dNoneFinalizingDEPP LT Testing200/wkUCR Repair centerFinalizingYes ARC LED>30/dNoneNo Module Reinforcing >30/dNoneNo Rod Assembly>4/dNoneNo Single rod test>4/d2 people to be addedYes Multi-rod burn-in32/wkNoneYes

US CMS Module Production Report - July 2004 – CERN Tracker week 7 Hybrid Thermal Cycler/ARCS Status Recently upgraded to Bruno’s current code PLL forcing Drifting pedestal check Added xml file auto- upload UCSB, FNAL and Mexico City thermal cycler are commissioned Still have a few minor “features” Single channel shorts, etc. We have all ARCS equipment+spares we need From Tony’s talk in the testing meeting

US CMS Module Production Report - July 2004 – CERN Tracker week 8 DAQ Equipment Status 2 fully equipped Vienna boxes 1 slot in UCSB non-functional 2 single-rod stands Missing TPO to use MUX FNAL missing rod FEC Can’t run 1-rod stand and rod thermal cycler 2 multi-rod thermal cyclers Both MUXs have been used to test 5 rods tested simultaneously Have enough equipment to fully commission system Only 2 MUX cards + DAQ spares missing To instrument UCR Repair Center & have all critical spare components required in the US we need: 2 TSC – in production? 5 TPO – in production? 5 rod FEC Picking these up Friday 1 eMUX crate – 1 week away? 5 eMUX boards – “ “ 4 oMUX boards – “ “ 7 CCU Pick up Friday 10 VUTRI - ? 10 PAACB – half are built, half being assembled now 19 hybrid-to-utri adaptors - ? From Tony’s talk in the testing meeting

US CMS Module Production Report - July 2004 – CERN Tracker week 9 DAQ Equipment Status II With current TPOs : Cannot run single rod stands With 1 failure we lose either: 70% capacity of a Vienna box 1 rod system Cannot run more than 16 APVs in UCR stand Without the additional MUX, CCU, VUTRI, PAACB, hybrid-to-utri adapter boards Can’t run UCR LT which is crucial to ops of US Repair center With current TSC complement: With 1 failure we lose either: 1 Vienna box 1 single rod stand, or 1 rod thermal cycler Without additional hybrid-to-utri adaptors: We cannot load Vienna box fast enough to run two cycles at either UCSB or FNAL. Would have to go to sample cold testing during production Component shortages and failures have potential to severely limit production testing capacity which can no longer afford

US CMS Module Production Report - July 2004 – CERN Tracker week 10 Backup Equipment Spare sensor and hybrid tools being produced at UCSB for UCSB, FNAL and Brussels. Upgraded OGP computer OS and OGP software Automated routine occasionally missed fiducial marks. The new software fixes this problem. Setting up back-up gantry computers with spare U600 controllers and expansion cards already installed. Purchased backup components for every piece of production equipment or tooling that, if it were to fail, would cause a significant reduction in production.

ROD INTEGRATION Aachen Karlsruhe Strasbourg ZurichWien PETALS INTEGRATION Aachen Brussels Karlsruhe Louvain LyonStrasbourg Brussels Wien Lyon TECassembly TECassembly CERN Frames: Brussels Sensors: factories Hybrids: Strasbourg Pitch adapter: Brussels Hybrid: CF carrier TK ASSEMBLY At CERN Louvain Strasbourg Pisa PerugiaWien BariPerugia BariFirenzeTorinoPisaPadova TIB-TID INTEGRATION FNAL UCSB TOBassembly TIB-IDassembly At CERN PisaAachenKarlsruhe.--> Lyon Karlsruhe Pisa Sensor QAC Module assembly Bonding & testing Sub-assemblies FNAL US in the tracker Integration into mechanics RU FNAL UCSB

US CMS Module Production Report - July 2004 – CERN Tracker week 12 UCSB TEC Production Miscellaneous info 10 more shipping boxes (20 modules each) being made now R7 plates ready for module production by end of August Design for R7 module carrier and wirebond fixture is complete, started making 100 carriers: all complete within the next 2 weeks All wirebond fixtures and 100 module carriers for R5 and R6 complete. General capacity issues Could saturate our production capacity with TEC production Actual rate will depend on need and availability of parts as well as TOB production parts availability and schedule Another step higher in production capacity (by extending work day via overlapped shifts): Bonding and Testing capacity adequate LT testing capacity limit is ~100 per week but could eventually be mostly TEC if necessary (TOB burn-in shifted to rods) or sampled

US CMS Module Production Report - July 2004 – CERN Tracker week 13 Other outstanding problems/issues DB stability For our production rates, we must automate all DB queries. Need to standardize and maintain stable all data structures We rely on data to be accurate and complete from all preceding processing of components and structures. Old or un-installable components Prefer to remove them physically from our production sites and to have them properly marked in DB

US CMS Module Production Report - July 2004 – CERN Tracker week 14 Summary No longer have a manpower shortage Have studied all possible threats to production stability Purchased or manufactured spares Some test equipment still needed Studying further increases in capacity Systems status All stages of production have been exercised and are or are near to being finalized except rod testing Multi-rod stands still have substantial work ahead Testing protocols are very preliminary Software has made huge progress but is very fresh and evolving Full coordination of multi-rod daq and chiller systems still to be commissioned