GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa

Slides:



Advertisements
Similar presentations
1 GLAST Meeting GLASTItalia,Pisa06/06/2002A.Brez–INFN Pisa Colombo manufactured closeout The measured Colombo closeouts are 9 structural closeouts. In.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM1/3 PSR, April 20, 2005 GLAST LAT Tracker Tower-1/3 Pre-Ship Review INFN-Pisa.
Click on this image to open the full PDF document.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
The Gamma-ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE The GLAST LAT Silicon Strip Tracker-Converter.
Status Update on Mechanical Prototype in Rome November 6,
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
1 GEOMETRY FOR TRACKER Eduardo do Couto e Silva - 2/11/00 (drawings are NOT to scale) 1 - List of Figures 2 - Top view of tray with 5 x 5 detectors 3 -
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Measuring height in children and adults. Fixing wall mounted height measuring tape when wall has skirting.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TART recommendations implementation and qualification program results Alessandro.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Flange Plates to be Welded to Beam Flanges.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectPisa 9/1/04 A.Brez 1 GLAST Large Area Telescope: Grid interface proposal Alessandro Brez INFN Pisa Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
Mechanical design and tests of the new X-band flange
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Procedure for MCM rework on tray MID 070
Update on Pavia MM mechanical prototype
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
GLAST Large Area Telescope:
Hybrid Issues.
Open Issues Modification of Cactus Arm bending tool required
Integration issues at IHEP
Tables:.
Building a Nightstand Woods 1 Final Project Step #1
GLAST Large Area Telescope:
Creating a grid by Carl Dellutri.
The encapsulation problem of the LAT heavy trays
Alignment of Main Linac Cryomodule (MLC)
Beam Finder Wire (BFW) Status
Presentation transcript:

GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa Gamma-ray Large Area Space Telescope

GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 2 CMM results

GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 3 Nominal stay clear = 0.2mm Nominal adhesive thick. = 0.2mm Closeout pocket 4.2mm TMCM tolerances (TMCM thickness 3.81 nominal ) By drawing TMCM can stick out by 0.125mm

GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 4 Changes: reduce by 0.1mm the nominal thickness of the adhesive layer and of the thickness of the flange of the fixation pin Recuperate the rest of the tolerance selecting the pins with nominal flange when there is a conflict (small pocket + thick TMCM)

GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 5 Other problems The operator stops to push the tool against the tray closeout at a fixed torque.The tool can stop against the bias circuit surface, leaving a not controlled adhesive thickness. Vertical screws to guarantee the heights matching Horizontal screws to push the TMCM against the closeout

GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 6 LAT_PS_01801 procedure changes This metrology was performed from top side only, checking for pad alignment. The stay clear of the connector could not be observed. A check of the connector stay clear looking from the bottom side will be added A dry mounting test with clearance checkout has to be performed