MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)

Slides:



Advertisements
Similar presentations
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Advertisements

D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” LC-TPC-LBL 18-Oct Tracking Detector R&D at Cornell University and.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
MINERvA DAQ Software D. Casper University of California, Irvine.
MINER A NuMI MINER A Director’s Review 10 January 2005 D. Casper UC Irvine Electronics and Data Acquisition D. Casper (Irvine) with P. Rubinov (Fermilab)
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
DPNC Yannick FAVRE Electronics Highlights /12/ Electronics Highlights2 Electronics group  3 Engineers  Daniel La Marra  Stéphane Débieux.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Update on the CDC GlueX Collaboration Meeting October 2006.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 - Data Acquisition Status Report Daniel Haas DPNC Genève Extended SC Meeting 1 Sep 2008.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting September 21, 2004.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
WBS 1.03 Readout Systems Scope, Cost and Schedule
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Trigger issues for the CALICE beam test
State of developments on Readout interface of European DHCAL
Presentation transcript:

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ2 Outline  WBS 7 Components  Design Specifications  Design Issues and Concerns  Progress to Date and Near Term Plans  Cost and Schedule Overview  Cost and Schedule Issues and Concerns  Conclusions

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ3 WBS 7.2 & 7.3: DAQ  CROCs and DAQ (7.2, 7.3) t One CROC per 48 MAPMTs »Each CROC controls 4 LVDS chains of 12 MAPMTs t Three VME crates + computer »Two crates for CROCs »One crates for auxiliary electronics t Front-end/computer interface t Distribute trigger and synchronization from NuMI t Monitor and control MAPMT high- voltages t Configure front-end electronics

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ4 Specifications  Synchronization t Measure global time (between front-end boards) to a few nanoseconds  Trigger t Tap into NuMI timing signals through MINOS  Readout t Handle rates up to 1 kHz (for PMT testing and calibration)  Control t MAPMT HV control and monitoring t Configuration of front-end board firmware

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ5 Design Issues and Concerns  CROC Design t Not technically challenging, but requires EE time  Triggering and Synchronization t Need to flesh-out interface with NuMI and MINOS t Understand what auxiliary electronics are required t Investigate possibility of self-triggering »Firmware issue?  Readout t Requirements for PMT testing unspecified t Requirements for Veto Wall unspecified

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ6 Progress to Date/Near-Term Plans  Progress t LVDS chaining tested successfully (between front-end boards only) t Protocol and Frame for LVDS communications successfully tested (Christian Gingu) »Designed to be forward compatible with full required functionality  Near Term Plans t Begin design of CROC prototype as soon as possible t Procure VME system for testing and writing low-level readout software

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ7 Cost and Schedule Overview (I)

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ8 Cost and Schedule Overview (II)  Current schedule is out of date t e.g. CROC design did not begin on 6/1/05 and will not be completed on 9/20/05  Projected Schedule t CROCs: »Should begin design as soon as possible »Finish production and testing of prototype by July ’06 t VME Readout System »Procurement of VME test system scheduled for October 2005 »Need to complete paperwork for UC Irvine MoU, etc.

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ9 Cost and Schedule Issues and Concerns  PMT Testing (WBS 6) Drives Our Schedule t Need to understand required components and coordinate schedules t M&S costs for CROC prototypes (7.2.3) underestimated (need more than two)  Auxiliary Electronics t MINOS timing module for NuMI synchronization not explicitly included in WBS  Veto Wall DAQ Requirements (if any) Unspecified  Electronics Design t Paul is unavailable until roughly 1/06 t Design of CROC prototype should start as soon as possible t Should request EDIA time from another EE

MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine September 12, 2005Electronics and DAQ10 Conclusions  Base Cost: $349,464 (total, no contingency) t M&S: $210,310 t Labor: $139,154 t Need to update after confirming the number of prototypes needed  Highest Contingency Items: t CROC production: 50%  $48,000 = $24,000 »Need a concrete design t Other M&S contingencies are nominally 20% »Based on old quotes, need to update t Unspecified auxiliary electronics »No big-ticket items, but potentially a number of smaller ones  Schedule Risks: t CROC design should begin as soon as possible, in parallel with front-end work »Not a significant technical risk t Only serious constraint is PMT testing »Understand the WBS 6 schedule and requirements