Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.

Slides:



Advertisements
Similar presentations
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Advertisements

Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Team Poptarts Final Presentation Saad Alqahtani Kyle Skjerven Charles MacCraiger Connor Jacobsen Matt Busby Alexa Warly Corinne Desroches 11/29/11.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team Delta Special Recon Ops Launch Readiness Review Taylor Boe Andrew Gilbert Bobby Stillwell Emily Howard Grace Harsha Andrew Buckner November 11, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Daniel Sayle, Patrick Byrne, Sarah Kemp, Anna McLeland, Katie Thompson 11/2/10 TEAM MUNCHIES LAUNCH READINESS REVIEW.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Team Mate Launch Readiness Review Jason Schelz, Will Hakes, Emma Mossinger, Ethan Long, Brendon Barela, Amelia Weller 11/02/10.
Teamo Supremo Critical Design Review Ahna Issak Wes Roos Kristen Brenner Kimberley Fornall Barton Tofany Nick Martinez Ahna Issak Wes Roos Kristen Brenner.
Team T.E.N Final Presentation Nate Bolt Greg Frank David Maier Luke Pederson David Stagg Matthew Stephenson 12/05/2006.
Teamo Supremo Final Presentation Kristen Brenner Kim Fornall Ahna Isaak Nick Martinez Wes Roos Bart Tofany RevD
Team Thumbs Up Launch Readiness Review Nick Lenk Eddie Cyrus Brian Inglis Chase Prichett Greg Nelson Jake Varey 11/11/08.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Request for Proposal RFP# 2500F03 Radio Reception and Solar Power Balloon Satellite Radio Flyers Engineering is Chris Maytag, Challon Winer, Valerie Slasor,
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
Cydonia Final Review Presentation 6 December 2007 Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Conceptual Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani September 21, 2006.
Echo  Final Presentation Andrew Berg, Shawn Carroll, Cody Humbargar, Jade Nelson, Jared Russell, Austin Williamson
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Team Dionysus Launch Readiness Review Elise Kowalski, Michael Beach, Josh Tiras, Chris Konciljia, Alijah Smith, Becca Seigel November 5, 2009.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
Team Victorious Secret Final Presentation Crawford Leeds Jacob Broadway Tanya Hardon Devan Corona Dylan Reed November 29, 2011.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Team Name Flight Readiness Review (this is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here)
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Ryan Olin, Austin Granger, R.J. Kakach, Seth Frick, Joey Senkyr AEM /24/09.
Sam Bukowski, Emily Daugherty, Chris Lewin, Troy Hayes, Natalie Schaefer, Matt Vaninger November, 2011.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Team Honey Badger R.A.H.D. Final Presentation Team Members: Kyle Daniels, Logan Harrop, Annie Kelly, Gabe Frank Jason Leng, Karyn Perdue, Josh Whipkey,
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Team McLOVIN mission name: G Force, Intensity, and the Power… of Love Deniz Bertuna Gauravdev Singh Soin Gavin Kutil Jay Hohl Ryan Quakenbush Tyler Drake.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Scott Luisi, Abe Fark, Trent Quick, Jack Szmanda, Tom Valkenberg AEM 1905, 11/20/2008.
Panoramic Rays Final Presentation
Mission Statement... The Space Wolverines will;
Brandi Casey Lee Wilson
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
Launch Readiness Review
Team Super 8: Sat Morpheus Final Presentation
Team TWSS Launch Readiness Review
Team SCREAM Launch Readiness Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Panoramic Rays Critical Design Review
Presentation transcript:

Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006

Mission Overview - Objective Our team’s mission is to send a balloon satellite to an altitude of 100,000 feet in order to have it 1) Take still photographs 2) Make a digital recording of the flight 3) Measure the radiation levels of the upper atmosphere.

Mission Overview - Goals What we hope to accomplish is: 1) Obtain a visual record of near space and Earth from high altitude. 2) Discover how the radiation levels change at higher altitudes.

Mission Overview - Flight The flight was very successful overall. All of our components worked as intended and we obtained valuable results. The digital video camera took over an hour of flight footage The still camera used all of its exposures and returned amazing photographs.

Design – Block Diagram Radiation Badges Video Camera Power (23A) Timing Circuit Still Camera Switch Heater Power (9V) Switch HOBO Int. Humidity Int. Temperature External Temperature Dosimeter

We flew two cameras and three different radiation sensors along with the standard equipment Both cameras functioned properly and returned outstanding footage of the flight The radiation equipment survived with room to spare, but data has not yet been received. The experiment was designed to measure low- orbit radiation in order to compare it with that of ground level radiation Design – Experiment

Structure- 18 x 18 x 18 (cm) 555 timer- 4 x 6 x 0.1 HOBO- 6 x 2 x 4 Batteries- 4 x 4 x 1 Radiation sensors- 8 x 6 x 0.1 Still camera- 8 x 6 x 4 Heater- 4 x 4 x 1 Video camera- 4 x 3 x 1

RFP Compliance Mass– we were slightly over the allotted 800g, ≈870g Video Camera- the video camera was changed to look at Earth rather than the balloon Structure- the box was not painted as there was no need Testing- the satellite was not vacuum tested Experiments- the pressure sensor was not flown All other requirements were met

Results and Analysis - HOBO The HOBO had a faulty external temperature sensor that needed to be replaced. Predicted external temperature values were in the realm of -60°C The internal temperature followed predicted highs and lows

Results and Analysis - Cameras Video length 58 minutes of flight time; the extreme cold drained the power from the batteries. The culprit is suspected to be a panel that sealed off the camera from the rest of the satellite The still camera took pictures every 3 minutes and took its last photograph at about 80,000 feet

The Continental Divide

Sun and Earth from approximately 70,000 feet

Last photo taken at about 80,000 feet

Results and Analysis - Radiation Unfortunately our radiation data was lost by the postal system and was not returned to Global Dosimetry for development. The radiation level was expected to increase exponentially as the altitude increased Altitude Radiation Level

Ready to Fly - Correction Video Camera -Change batteries -Remove extra panel -Move the heater closer HOBO -Change the HOBO -Use a different external temperature probe.

Ready to Fly - Storage Temperature extremes, direct sunlight, moisture, etc. should all be avoided during storage The batteries and film inside the components should be removed and reinstalled prior to launch None of the components will wear out if unused New badges should be kept in the shipping material until use

Ready to Fly - Activation One side panel should be left open to activate the video camera After the video camera is activated the open side needs to be sealed with aluminum tape. Right before launch the two switches that control the heater and still camera should be activated The radiation sensors do not require activation

Conclusions The time required to build and test a functioning satellite is roughly one month with six team members taking an average of 15 credit hours All electronics should be protected by the satellite structure as much as possible, even if cameras have to be tucked inside the box Since two cameras were required for this satellite, the mass limit should be increased to allow for sufficient space for other experiments

Lessons Learned Choose a simple design and structure Be interested in your experiment Be thorough in testing Team work is essential and necessary Contingency plans should be made whenever possible Continuously communicate with all partners, team members and companies alike

Message to Next Semester Start as soon as possible Do not aim to high- be realistic Research experiments as much as possible Get a car with a lot of room and fill it to get a GPS on the chase. Try to avoid oncoming semis