Alumni Spotlight Web System Acceptance Test by Initrode Solutions.

Slides:



Advertisements
Similar presentations
Requirements Specification Presented By: Code Shark Solutions 11/3/10.
Advertisements

Preliminary Design: Smart Scheduling Client: Dr. Robert Yoder.
April 29, Simnet View Acceptance Test by InnoSmart Technologies.
Competitive Algorithm Calculation Testing in a Unified System (CACTUS) Software Plan 9/23/ Presented By: ExoNET Solutions.
9/23/2005 SaintSoft: Software Plan 1 Environmental Monitoring System Software Plan by SaintSoft.
04/27/2010 Acceptance Test 1. Our Client… Dr. Timoth C. Lederman Professor of Computer Science Siena College And To All Other Guests 04/27/2010 Acceptance.
Acceptance Test: Smart Scheduling Client: Dr. Robert Yoder.
1 PerformanceSoftware Roger Bacon Science Center, Room 328 September 21, 2005 Automated Grading System for Microsoft Excel - Software Plan -
5/2/2006 SaintSoft: Acceptance Test 1 Environmental Monitoring System Acceptance Test by Saint Soft.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /9/2010Digital Evolutions | Detailed.
10/28/2005 SaintSoft: Requirements Specifications 1 Environmental Monitoring System Requirements Specification by SaintSoft.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /25/2009Digital Evolutions | Software.
Alumni Spotlight Web Systems Software Plan Presentation by Initrode Solutions 9/23/2006.
Pear Software e-SATA (The Electronic Spreadsheet Automated Teaching Assistant) Detailed Design.
1 PerformanceSoftware Roger Bacon Science Center, Room 328 February 21 st, 2006 Automated Grading System for Microsoft Excel - Detailed Design -
October 26th, Simnet View Requirements Specification by InnoSmart Technologies.
9/21/2007SKYNET Software Plan Dynamic Network Device Mapping System (DNDMS) Software Plan By SKYNET Software.
Software Plan: Smart Scheduling Client: Dr. Robert Yoder.
1 Pear Software e-SATA (Electronic Spreadsheet Teaching Assistant) -Software Plan- Roger Bacon Science Center,
Alumni Spotlight Web System Preliminary Design by Initrode Solutions 12/01/2006.
Software Plan MAJIK Software Solutions Virtual Network Device Mapping System Software Plan By MAJIK Software Solutions.
Requirements Specification MAJIK Software Solutions 1 Virtual Network Device Mapping System Requirements Specification By MAJIK Software Solutions October.
5/1/07Acceptance Test1 Automated Excel Grading System Welcome Ms. Jami Cotler and Dr. Scott Hunter And Guests.
Title 1 Software Linked Interactive Competitive Environment Software Plan September 23 rd, 2011.
2/21/2006 SaintSoft: Detailed Design 1 Environmental Monitoring System Detailed Design by Saint Soft.
11/30/2007SKYNET Preliminary Design Dynamic Network Device Mapping System (DNDMS) Preliminary Design By SKYNET Software.
School of Science Network Device Display System Requirements Specification by Orion Technologies Roger Bacon Hall Room 328 October 24, :15 AM.
Alumni Spotlight Web Systems Requirements Specification by Initrode Solutions 10/25/2006.
School of Science Device Networking System Software Plan by Orion Technologies Roger Bacon Hall Room 328 September 21, :15 AM.
March 4, 2008Sonata Software - Detailed Design1 Dynamic Network Device Mapping System Preliminary Design Sonata Software Roger Bacon Hall Room 328 March.
Requirements Specification: Smart Scheduling Client: Dr. Robert Yoder.
Friday 9/25/09 1 Proposed Project: Student/Staff Programming Problem and Solution Manager (S 2 P 2 ASM) Software Plan Presentation Client: Dr. Darren Lim.
12/02/2005 SaintSoft: Preliminary Design 1 Environmental Monitoring System Preliminary Design by SaintSoft.
September 21st, Simnet View Software Plan by InnoSmart Technologies.
10/24/2007SKYNET Requirements Specification Dynamic Network Device Mapping System (DNDMS) Requirements Specification By SKYNET Software.
School of Science Network Device Display System Preliminary Design by Orion Technologies Roger Bacon Hall Room 328 November 30, :15 AM.
Alumni Spotlight Web System Detailed Design by Initrode Solutions 03/06/2007.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Preliminary Design 12/7/2011 Presented By: ExoNET Solutions 1.
Detailed Design: Smart Scheduling Client: Dr. Robert Yoder.
1 Environmental Intelligence Network Systems Remote Monitoring System - Software Plan - Welcome Mr. Ken Swarner Dr. Tim Lederman Mr. Ken Swarner Dr. Tim.
Software Plan Presented By: Code Shark Solutions 9/24/10.
Monday, October 29 st 2012 Requirements Specification.
Welcome Mr. Ken Swarner TCP/IP Packet Descriptor Detailed Design.
26 April 2005Spartacus Computing Solutions1 WELCOME to the Acceptance Test Presentation Ms. Kate Zimmerman, Siena College Assistant to Vice President of.
1 Software Requirements Specification Presentation Client Dr. Darren Lim Friday October 30, 2009 Java.Online.Learning.Tutor.
GUEST REGISTRATION ADVANCEMENT BY SUNNY SOLUTIONS (G.R.A.S.S) Acceptance Test 05/01/ GUEST REGISTRATION ADVANCEMENT SUNNY SOLUTIONS ACCEPTANCE TEST.
Title 1 Software Linked Interactive Competitive Environment Acceptance Test April 26 th, 2012.
Seraphim.  Our Clients: ◦ Ms. J’aimé Pfeiffer (Capital Region BOCES) ◦ Ms. Jen Cannell (Questar III)  Guests ◦ Dr. Meg Fryling ◦ Dr. Darren Lim.
CCRS Comprehensive Conference Registration System Acceptance Test May 1 st,
Welcome Mr. Brian Smith Ms. Kate Zimmerman. Team Members Controlled Decentralized Team Structure Team Leader: Gus Weloth System Admin: Evan Drosky Webmaster:
Title 1 Software Linked Interactive Competitive Environment Detailed Design March 1 st, 2012.
ID-10t Consultants Generation Java Software Plan Roger Bacon Science Center, Room 328 September 19, :15 am 09/19/20081 ID-10t Consultants Software.
Welcome Dr. Eric Breimer Associate Professor of Computer Science Siena College 515 Loudon Road Loudonville, NY /2/2009Digital Evolutions | Requirements.
R.O.S.E.S. Preliminary Design Presented By: Code Shark Solutions 12/8/10.
Wednesday, May 1, 2013 Acceptance Test. IntroductionRestatement of ProblemProject ProgressionUser Case NarrativesUnit TestsIntegration TestAcceptance.
FSH Technologies Acceptance Test: F.I.L.E.T. April 26th, 2012.
Competitive Algorithm Calculation Testing in a Unified System (C.A.C.T.U.S.) Acceptance Test 04/25/2012 Presented By: ExoNET Solutions 1.
1 March 2005Spartacus Computing Solutions1 WELCOME to the Detailed Design Presentation Ms. Kate Zimmerman, Siena College Academic Program Administrator.
 CCRS Comprehensive Conference Registration System Software Plan September 21 st, 2012 S.E.E. Solutions 1.
Acceptance Test By Phoenix Tech AcceptanceTestAcceptanceTest.
1 Acceptance Test Presentation Client Dr. Darren Lim 4/27/2010.
Software Plan By Phoenix Tech. Dr. Darren Lim Assistant Professor Department of Computer Science Siena College Mrs. Pauline White Visiting Instructor.
29 September 2004Spartacus Computing Solutions1 Welcome Mr. Brian Smith, Siena College Webmaster & Ms. Kate Zimmerman, Siena College Academic Program Administrator.
Welcome Dr. LaRow & Distinguished Guests. Visual Design Technologies Meditrak Requirements Specification October 31, Visual Design Technologies.
Welcome Mr. Ken Swarner & Guests April 27, Mirage IncorporatedAcceptance Test2 Acceptance Test Presentation April 27, 2004 Mirage Incorporated Presented.
College Catalog System
Requirements Specification
Preliminary Design Presentation
College Catalog System
Presentation transcript:

Alumni Spotlight Web System Acceptance Test by Initrode Solutions

05/01/2007Initrode Solutions: Acceptance Test2 Welcome Dr. Eric Breimer Webmaster Assistant Professor Siena College Department of Computer Science

05/01/2007Initrode Solutions: Acceptance Test3 Agenda Project and Testing Overview – Elise Hearn Test Results –Charles Feltes Demonstration of Alumni Spotlight Web System –Anthony Angelucci & Christopher McConnell Deliverables and Conclusion –Christopher McConnell

05/01/2007Initrode Solutions: Acceptance Test4 Purpose Report results from development and testing stages Provide client with complete documentation up to this point

05/01/2007Initrode Solutions: Acceptance Test5 Introduction Recap –Web based community of Siena Alumni –Users of the system Administrator Alumni Anyone

05/01/2007Initrode Solutions: Acceptance Test6 Testing Overview Acceptance Test vs. System Test Approach to Testing –System Test –Non Functional Requirements –Unit Testing –Integration Testing Regression Testing

05/01/2007Initrode Solutions: Acceptance Test7 Agenda Project and Testing Overview – Elise Hearn Test Results –Charles Feltes Demonstration of Alumni Spotlight Web System –Anthony Angelucci & Christopher McConnell Deliverables and Conclusion –Christopher McConnell

05/01/2007Initrode Solutions: Acceptance Test8 Results In Document Functional and Non Functional RequirementsFunctional and Non Functional Requirements Unit Tests Integration Tests

05/01/2007Initrode Solutions: Acceptance Test9 Agenda Project and Testing Overview – Elise Hearn Test Results –Charles Feltes Demonstration of Alumni Spotlight Web System –Anthony Angelucci & Christopher McConnell Deliverables and Conclusion –Elise Hearn

05/01/2007Initrode Solutions: Acceptance Test10 Demonstration Alumni Spotlight System Spotlight Demonstration

05/01/2007Initrode Solutions: Acceptance Test11 Agenda Project and Testing Overview – Elise Hearn Test Results –Charles Feltes Demonstration of Alumni Spotlight Web System –Anthony Angelucci & Christopher McConnell Deliverables and Conclusion –Christopher McConnell

05/01/2007Initrode Solutions: Acceptance Test12 Deliverables –The Deliverables for this project will include: A hard copy of the Acceptance Test documentA hard copy of the Acceptance Test document A compact disk including:A compact disk including: –The Acceptance Test document –Test Plan & Results –The Project Website –Source Listings –Our Team Website –PowerPoint Presentation(s)

05/01/2007Initrode Solutions: Acceptance Test13 Conclusion Completion of our Spring Development Schedule

05/01/2007Initrode Solutions: Acceptance Test14 Conclusion Completion of our Waterfall Model

05/01/2007Initrode Solutions: Acceptance Test15 Conclusion Where are we headed next? –May 5 th, 2007 – Academic Celebration –May 8th, 2007 – Software Engineering Party Questions/Comments.

05/01/2007Initrode Solutions: Acceptance Test16 Thank you Thank you all very much for coming, and a special thank you to our client Dr. Eric Breimer, as well as Ken Swarner and Eric Crossman for their efforts.