1 Disc Mower Optimization Customer: Rich Adams, New Holland Mission: To design, assemble, and test a system which will reduce streaking by optimizing blade.

Slides:



Advertisements
Similar presentations
SMART Telecomm Ambient Air Cooling System Team 5.1: Justin Alms, Ramon Benitez, Jennifer Pahnke Sponsor: Dr. Wilson Poon Advisor: Dr. James Glancey System.
Advertisements

NOISE CONTROL OF MOBILE CONSTRUCTION MACHINERY Ken Meitl Caterpillar Inc.
F our P oints E ngineering and D esign Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Design Specifications Design is directed toward human beings. To design is to solve human problems by identifying them and executing the best solution.
CORPORAT.PPT “A company dedicated to a better world through cleaner air” IMPCO ® Low Emission LPG Off-Road Engines Brian X. Sun Technology & Automotive.
The Design Specification Phase
Group 4 Nick Hatcher, Andrew Taylor, Neil Barnes, Jakob Combs, Chris Cook.
Small Engine Emissions Reduction Project Number Sponsor: Stone Construction Equipment, Inc. Team Members: Celeste Luce (Team Leader – Mechanical.
Unrestricted © Siemens AG 2013 All rights reserved. Siemens PLM Software Industrial Food Processing Equipment Fred Lauzus Senior Application Engineer Greg.
COMPACT MOBILE LIFTING DEVICE Team Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Jim Adkins, Fraunhofer Advisor: Dr. Michael Keefe.
Team #1: Brandon Fichera Dave Rabeno Greg Pease Sean Gallagher Sponsor: Dr. Stephanie Wright Delaware Aerospace Academy Advisor: Dr. Michael Keefe Mission.
Intelligent Tooling Team 8: Joseph Staley Jeff Roushey Andrew Graybill Glenn Gardner Sponsor: Dr. Mike Yu, FRC-DE Advisor: Dr. Michael Keefe.
NCDA Team Resin Flow Controller n Customer: Dr. Suresh Advani n Advisor: Dr. Lian-Ping Wang n Team Members: –Anthony Ripanti –Joshua Radice –Frank.
PASCOR Group Industry Advisor: Craig Smit Academic Advisor: Dr. Chien Wern Group Members: Jeremie Bilisari Steve Greene Joe Hartley Robby Hoff Matt Smith.
1 Composite Generator Enclosure PROJECT New Castle Design Associates.
Senior Design: Tachometer Calibration Device Team 4: Jennifer Egolf, Matthew Hagon, Michael Lee, Christopher Pawson Sponsor: DuPont Advisor: Dr. Glancey.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
ME Project: Air Conditioner Lab Team: 10 Members: Sean M. Gallagher, Brian Davison, Prathana Vannarath, Pam McDowell Customer: University of Delaware Mechanical.
Four Points Engineering and Design Project 99.04: Heat Pump Design for Whalen Co. FPED Team Members: Ricardo Blackett, Andy Parke, Scott Quirico, Brian.
Team CNH Design a less expensive propulsion control system with equivalent or better performance than existing hardware for Hydrostatic Windrower Machine.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Team 10 ME Project: Air Conditioner Lab Members Customer Advisor Sean M. Gallagher, Brian Davison U of D ME Department Dr. Keefe Prathana Vannarath, Pam.
Palletizing the Easy Way
Designing Products and Processes with a Future. What does it take? Involve the customer Meet with the customer Listen to customer Educate the customer.
CONFIDENTIAL © 2013 IDA Singapore. All Rights Reserved. 1 Proposal Concept Submission Template 1. Problem Statement 1. Project Scope Target Users Business.
Design Criteria and Constraints
“HEAR IT AND FORGET IT, SEE IT AND REMEMBER IT, DO IT AND UNDERSTAND IT” R12310: ME and ChemE Lab and Demo Hardware Development DPM – Spring 2012.
Greg Hyde Raymond Zheng Joseph Rojano Katie Bentley Lori Liebman P14414 P3 ARBORLOO WIND RESISTANCE TEST STAND 1.
A Brief Overview Midwest COOLING TOWERS, INC. A Full Checklist of Products & Services for Your Cooling Tower Project Quality Service Integrity Value Quality.
Team 20 Advisor Dr. John Keenan 2:30 pm – 3:00 pm 3:00 pm – 3:30 pm Abstract Course scheduling is an integral part of the college experience. At the University.
Designing Goods and Services and Process Selection
TEAM UP! FOR FAN AND PUMP SAVINGS It can be as easy as replacing an old drive belt.
Engine & Equipment Development Lead Time Requirements are Significant Due to: The Non-Integrated Nature of the Industry Number of Applications Proposed.
Chapter 3, Part 1 Product Design
Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :
Designing Goods and Services Chapter 3, Part 1. Operations and Operations Strategy Designing an Operations System Managing an Operations System Done We.
COMPACT MOBILE LIFTING DEVICE Team 3 Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Fraunhofer Advisor: Dr. Michael Keefe Innovative Lifting.
2005 Michigan Tech Clean Snowmobile Greg Davis David Meyer Advisor: Dr. Bernhard Bettig Incorporation of a High Performance, Four-Cylinder, Four-Stroke.
BICYCLE CELL PHONE CHARGER Senior Design Project Team: Ajeetesh Govrineni (EE), Kellen Warriner (IE), Chris Battaglia (ME) Guide: John Kaemmerlen.
2011 Human Powered Vehicle Challenge 'Mjolnir' Team Members: Tad Bamford Ben Higgins Chris Schultz Aaron Stanton Neal Pang.
Designing Goods and Services and Process Selection
Formula SAE Flow Testing Device
Pleasing in appearance.
Electric Energy  The energy of electrical charges  In order for charges to move, an electric field (area where another object experiences a force) must.
ME Students: Richard Dzionara-Norsen Jeffery Flowerday Jonathan Nguyen IE Student: Kassandra Schlott Project Design Review.
DESIGN 1 DPT224 TOPIC 2: ENGINEERING DESIGN PROCESS.
Friday, October 15 Objective: Students will be able to present information they have found on an engineering career. Bell Ringer: Quick Write: What is.
Defining Design Goals and Design Requirements © 2013 Project Lead The Way, Inc.Engineering Design and Development.
Set-Based Design. Planning Product Development Process Concept Development Concept Development System-Level Design System-Level Design Detail Design Detail.
Air Conditioning Experiment Department of Mechanical Engineering University of Delaware.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Designing Goods and Services Chapter 3, Part 1. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work.
Tata McGraw CHAPTER 4 Product and Service Design.
Control Method Power Control Unit PCU PCU Electro-Mechanical Converter EMC (motor, generator or any) Electro-Mechanical Converter EMC (motor, generator.
Project Final Presentation Joe Featherall.
Design of Goods and Services Chapter 5. Designing Goods Form design: Appearance and other sensory aspects of a product Contributes to customer expectations.
TEAM 14 DESIGN PROJECT I DORIS HO, KEVIN MASTERTON, KYLE NICHOLSON, RYAN SHERIDAN.
Welcome to Parag fans & cooling systems limited, the world's leading manufacturer of high efficiency axial flow frp (fiber glass reinforced plastic) fans.
Tube well pump using wind power Nishan Madushanka HND/CV/03/12.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Value Analysis / Value Engineering using Novo Cut to Length Novo Precision Team 2016.
The Four-legged Water Walker
Turbomachinery Flow Visualization P08453
Table of Contents: Design
Let the IMPS program help you with your obsolescence!
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Chapter 4 Product Design. Chapter 4 Product Design.
NKE AUSTRIA Competence in bearings for agricultural machinery
Vishay Basic training IHLP power inductors Low DCR, reduced EMI / Size
Presentation transcript:

1 Disc Mower Optimization Customer: Rich Adams, New Holland Mission: To design, assemble, and test a system which will reduce streaking by optimizing blade angle, lifter angle and shroud shape through testing and analysis. Advisor: Dr. Valery Roy Team Number:98.09 Members:Michelle Mattera Joseph Salvia Tiffany StithBob Ward Approach: Using TQD, evaluate and modify existing design based on prioritized wants and constraints.

2 Customers: b New Holland Rich Adams:Project EngineerRich Adams:Project Engineer Ken McLean:Design EngineerKen McLean:Design Engineer Joe Griffiths:MarketingJoe Griffiths:Marketing b Chris Peters:Brim Tractor Co. b Ray Coates:Farmer b OSHA

3 Benefits of Solution b b More even cutting of crops b b Cost savings to the end user b b Competitive advantage b b Increased versatility of the mower b b More aesthetically pleasing cut

4 Mission Statement: To design, assemble and test a system which will reduce the amount of streaking of the New Holland disc mower by optimizing one of the following: Blade Angle Lifter Angle / Lifter Shape Shroud Shape

5 : Wants:Metrics: b Maintain drive train b Retrofit capability b Minimize cost increase b Minimize noise b User comfort b Dimensions b Dimensions, Power b Percent of cost b dB b dB, Vibration

6 : Wants:Metrics: b Increase durability b No clogging b Easy to maintain b Resistant to corrosion b SAE standard hardware b Lifetime of part (hrs) b Crop flow rate b Down time (hrs) b Operation hours b Fits standard tools

7 Customer Constraints b b Unchanged power requirement b b Must fit within the existing equipment b b Tractor cutting speed unchanged. b b Adjustable cutting height b b Must cut wet or dry crops

8 Benchmarking / Competitors b b Sickle Cutters b b Kuhn Farm Machinery, Inc.

9 Concept Generation b Major Factors Blade AngleBlade Angle Lifter AngleLifter Angle Shroud shapeShroud shape b Method Velocity profiling with hot wire anemometerVelocity profiling with hot wire anemometer