Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,

Slides:



Advertisements
Similar presentations
Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Advertisements

Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project - design of the support and mover system.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Robert Ruland MMF Bench/CMM Procurement Plan October 14, 2004 MMF Review 1 MMF Bench / CMM Procurement Plan Robert Ruland Procurement.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Zack Wolf Undulator Magnetic April 11, 2006 LCLS Undulator Magnetic Measurements Zack Wolf, Scott Anderson, Ralph Colon,
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
PACMAN : technical objectives Hélène Mainaud Durand.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Magnetic Measurements At SLAC
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Magnetic Measurements For The LCLS Undulator System
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
X-ray Pump-Probe Instrument
Beam-Based Alignment Results
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Undulator Tuning Status
Undulator Integration Test Status
Undulator Assembly and Installation Planning
Physics Requirements for Conventional Facilities
Undulator Alignment Plan
Alignment Diagnostic System Status
Breakout Session SC3 – Undulator
LCLS Undulator Magnetic Measurements
Presentation transcript:

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment, Magnetic Measurements and Fiducialization Robert Ruland Organization Installation Alignment Error Budget Ab-initio Alignment for BBA Conventional Global Straightness Magnetic Measurements Status of Magnetic Measurements Facility (MMF) Location, Construction Schedule Lay-out Test Bench Acquisition Status Test Stands Development Status Fiducialization Pointed Magnet Fixture Development CMM Acquisition Status Monitoring Systems Organization Installation Alignment Error Budget Ab-initio Alignment for BBA Conventional Global Straightness Magnetic Measurements Status of Magnetic Measurements Facility (MMF) Location, Construction Schedule Lay-out Test Bench Acquisition Status Test Stands Development Status Fiducialization Pointed Magnet Fixture Development CMM Acquisition Status Monitoring Systems

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 2 Organization

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 3 Undulator Alignment Tolerance Undulator The measured values for K eff shall be within ± (i.e., ± 0.015%) of the design values (LCLS Undulator Requirements PRD 1.4 – 001) 1.5*10 -4 correlates to 70 µm in Y, about 180 µm in X Quadrupoles 3 µm in X and Y over ~140 m Ab-initio alignment for BBA ~150 µm, desired 80 µm

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 4 Alignment Approach Global alignment of 70 µm very tough Instead will use BBA quads as alignment references for undulator segments Quadrupole and undulator segments are rigidly coupled by “cradle” mounting system, undulator segments follow quads BBA will align quad – undulator segment units to 3 µm level over undulator system length 70 µm tolerance is “reduced” from global (~140 m length) to relative (cradle) Relative alignment can be done on CMM in MMF

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 5 Undulator – to – Quad Tolerance Budget

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 6 Ab-initio Alignment Conventional alignment methods, Total Station, Laser Tracker, Digital Leveling yields ~200 µm Adding additional observations should yield position uncertainty of less than 100 µm Absolute measuring hydrostatic level measurements (ultra-sound sensor) Absolute measuring stretched wire measurements (optical wire detection)

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 7 Installation Alignment Workflow Will use standard installation alignment approach. Requirement: All components use registration features to preserve pre-alignment Install and measure alignment network Install floor anchors and foot plates Align foot plates to better than 0.5 mm Install granite tables onto foot plates Re-measure alignment network Align undulator mechanical supports and cams of mover system Install cradles Install Monitoring System: HLS and WPM Align Cradles Straightness measurements: Alignment Stretched Wire System, Portable HLS Align Cradles

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 8 LCLS Magnet Measurements Facility Proposed Location: Bldg 81, about 0.8 km away from tunnel Sufficient power for HVAC & test equipment Ground motion and vibration measurements did not indicate potential problems Manageable space constraints Construction Schedule T1 Aug 04 (Engineering) T2 Dec 04 (Final Construction Drawings) T3 May 05 (Construction Start) Beneficial Occupancy February 2006

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 9 Layout Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Full set of specs: LCLS-TN-04-1 Z. Wolf, R. Ruland, "Requirements for the Construction of the LCLS Magnetic Measurements Laboratory“.LCLS-TN-04-1 Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 10 MMF Set-up Magnetic Measurements Undulator Test Bench #1 (8 m) final gap setting, final tuning Undulator Test Bench #2 (4 m) – existing prototyping procedures, software development, initial gap setting Hall Probe Calibration System Test magnet and NMR system Quad Integrated Field Strength Bench Stretched Wire Quadrupole Fiducialization Platform Vibrating Wire Pointed-Magnet Fixture Calibration Bench Fiducialization & Assembly Fiducialization CMM 4.5 m Quadrupole Fiducialization Platform Vibrating Wire mounted on CMM BPM, Diagnostics Fiducialization Assembly Cradle Assembly Bench Vacuum Chamber Alignment Bench Granite table with Height Gauge Undulator Segment / Cradle Storage At least 2 Und. Segments in MM lab (0.1º C) At least 2 Und. Segments in F&A lab (1º C) 8 Cradles, quads, BPMs, Vacuum chamber and misc. supports in F&A lab (1º C) About 20 undulator segments / cradles in storage area (2.5º C) Magnetic Measurements Facility Requirements, PRD

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 11 Undulator Test Bench Status 8m Magnetic Measurements Test Bench (MMTB) Implementation Schedule Evaluating RFP responses Award expected for early May delivery to coincide with MMF BO in Febr. 06 Installation, commissioning, MMF ready for measurements 5/30/06 Are using 5m bench obtained from APS for developing procedures and software (bench is being outfitted with equivalent hardware as 8m bench. Will be using 5m bench for preliminary gap setting during production

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 12 Undulator Fiducialization & Cradle Alignment Will use Coordinate Measurement Machine (CMM) for mechanical fiducialization measurements and alignment of components on cradle Specs: 2µm +L/350 accuracy, 4.5m x 1.2m x 1.0m volume Min 1500kg load capacity RFP being issued, due mid May Award expected for early June Delivery to coincide with BO of MMF

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 13 Undulator Fiducialization Status Proposed Method: Pointed Magnet Fixture Step 1: measure offset between undulator axis and pointed-magnet reference fixture on MM Bench Step 2: Measure pointed-magnet reference fixture wrt undulator fiducials on CMM Test measurements show an accuracy of 10 µm in X and 5 µm in Y See LCLS-TN Y. Levashov and Z. Wolf, “Tests of coordinate transfer from magnetic to mechanical reference for LCLS undulator fiducialization”, in preparation

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 14 Quadrupole Fiducialization Status Finding the axis Will use Vibrating Wire prototype set-up. It promises better yaw and pitch resolution than pulsed wire. Implementation based on setup by Dr. Temnykh from Cornell Completed prototype setup for permanent magnets. Routinely achieved repeatabilities even in environment with wide temperature swings of better than 5 µm Test stand being re-designed for electro magnets Transfer onto quadrupole fiducials Use Wire Finders (developed for VISA) to locate wire and reference to its tooling balls Use Coordinate Measurement Machine (CMM) to transfer information from WF to Quad fiducials. Vibrating Wire system will be mounted onto optical table which can be set-up on undulator fiducialization CMM

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 15 Integrating Monitoring Systems into Cradle / Support System Since the cradle needs to be easily removable, we cannot attach the monitoring systems to it. Hence, both WPM and HLS need to be mounted to support table. However, the mounting has to be accomplish in a way which will force the sensors to follow the cradle motion

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 16 Hydrostatic Level System 3 rd generation sensors with: Improved stability Changed interface from RS485 to TCP/IP over 10BaseT with POIP

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 17 HLS Stability and Resolution

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 18 Stretched Wire system

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 19 WPM Stability and Resolution

Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 20 END of Presentation