Production Monitoring and QC FCal1 Production Advancement Review February 20, 2002 1 Peter Loch University of Arizona Tucson, Arizona 85721 FCal1 Production.

Slides:



Advertisements
Similar presentations
Module 3: Business Information Systems
Advertisements

OptiShip ® Multi-carrier Shipping System. OptiShip ® customers save on average 13.6% of parcel shipping costs… OptiShip ® is a comprehensive system that.
1 What’s New in the Therapy Prior Authorization Review Process? December 2011 Therapy Clinical Webinars.
C ARBON P ARTNERSHIP F ACILITY 1 A PRIL 2014 S ELLER P ARTICIPANT T RAINING O VERVIEW OF P ROGRAM AND CPA L EVEL M ONITORING, P REPARATION OF M ONITORING.
St. Michael’s Laundry Tailor Shop Procedures. Garments/items are brought in by customers. Garment/item could be received from production area (i.e., trim.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
Adaptability of learning objects by appropriate knowledge representation Anastas Misev Institute of Informatics Faculty of Natural Science and Mathematics.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Production Project Organization FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production.
Personnel and Manpower Organization FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona Personnel.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
IS Consulting Process (IS 6005) Masters in Business Information Systems 2009 / 2010 Fergal Carton Business Information Systems.
Chapter 8 USING ACCOUNTING APPLICATIONS. Organization of Accounting Applications.
TRANSACTION PROCESSING SYSTEM (TPS)
World Health Organization
Biostatistics Analysis Center Center for Clinical Epidemiology and Biostatistics University of Pennsylvania School of Medicine Minimum Documentation Requirements.
WORKFLOW IN MOBILE ENVIRONMENT. WHAT IS WORKFLOW ?  WORKFLOW IS A COLLECTION OF TASKS ORGANIZED TO ACCOMPLISH SOME BUSINESS PROCESS.  EXAMPLE: Patient.
ALICE Electronic Logbook MEST-CT Vasco Barroso PH/AID.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
February 2007 Commercial Vehicle Drivers Hours of Service Module 24: Daily Log Audits.
Test Of Distributed Data Quality Monitoring Of CMS Tracker Dataset H->ZZ->2e2mu with PileUp - 10,000 events ( ~ 50,000 hits for events) The monitoring.
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
TRANSPORTATION FEFP PREPARING FOR THE “DREADED” OFFICIAL STATE AUDIT.
Plan Design Analyze Develop Test Implement Maintain Systems Development Life Cycle MAT Dirtbikes.
13-1 Application Architecture Application architecture – a specification of the technologies to be used to implement information systems. The blueprint.
Topics Covered: Data processing and its need Data processing and its need Steps in data processing Steps in data processing Objectives of data processing.
IB ITGS Case Study. Introduction: Serving thousands of clients, it is method of environment-friendly green ticketing. User friendly system which minimizes.
Animal Feed Safety System P Timothy E. Costigan Manager of Quality and Analytical Services Prince Agri Products, Inc.
Rod SET QA/QC Protocols Leigh Anne Sharp, LDNR/CRD LFO Data Recording Data Entry Reporting Deliverables.
Title Page programmemanagementsystem KPMD (IT Solutions) Ltd Blades Enterprise Centre, Bramall Lane, Sheffield S2 4SU, United Kingdom telephone: +44 (0)114.
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
* Property of STI Page 1 of 18 Software: Systems and Applications Basic Computer Concepts Software  Software: can be divided into:  systems software.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
8-Jul-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security (Report from the LCG Security Group) RAL, 8 July 2003 David Kelsey CCLRC/RAL, UK
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
Nature and Type of Audit Evidence
Run Coordination Summary of the May 14, 2004 Run Coordinator Meeting CT-EC2 Run Preparation Meeting May 17, 2004 Slide 1 Peter Loch University of Arizona.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
Compliance Suite™ Compliance Suite™ is Physical Plant’s software program for regulatory compliance and training tracking.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
AliEn AliEn at OSC The ALICE distributed computing environment by Bjørn S. Nilsen The Ohio State University.
Lesson 3.  Use of computers in recording, classifying, manipulating, and summarizing data.  Also called Automatic data processing, data processing,
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Master Formula And Batch MaNUFACTURING Record
Management Information System
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Learning Objectives Understand the concepts of Information systems.
Production Database Apollo Go, NCU Taiwan Preshower Silicon PRR July 5, 2001.
Module 12 - part 2Slide 1 of 23 WHO - EDM Basic Principles of GMP Documentation Part 2 Part One, 14.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
TBTS Test Program & Schedule G. Riddone
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Computers Are Your Future Tenth Edition Spotlight 5: Microsoft Office Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall1.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Building Valid, Credible & Appropriately Detailed Simulation Models
September 2003, 7 th EDG Conference, Heidelberg – Roberta Faggian, CERN/IT CERN – European Organization for Nuclear Research The GRACE Project GRid enabled.
Scientific data storage: How are computers involved in the following?
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
ADVANCED BATCH.
11 ii. Develop a plan for aDSM
BASIC INFORMATION ABOUT DATABASE MANAGEMENT SOFTWARE
Presentation transcript:

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 Production Monitoring and QC Peter Loch University of Arizona Peter Loch University of Arizona

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona Quality Control: large numbers of small, identical parts (tubes, rods): mechanical dimensions checked for ~2% samples (shipment acceptance inspection) ; mechanical features (straightness, edges, out-of-roundness) checked for each part individually prior to processing; individual inspections of all rods and tubes after de-burring, sanding (rods only), drilling (rods only), and cleaning; final inspection after retrieval from storage, right before insertion; final acceptance defined by go/no-go at insertion; absorber, far end and signal plates: overall dimensions checked for each plate (shipment acceptance inspection) ; ~100 electrode and ground pin holes (signal and far end plates only) in each plate checked for dimensions (go/no-go gauges); individual inspections of all plates and tubes after cleaning; large numbers of small, identical parts (tubes, rods): mechanical dimensions checked for ~2% samples (shipment acceptance inspection) ; mechanical features (straightness, edges, out-of-roundness) checked for each part individually prior to processing; individual inspections of all rods and tubes after de-burring, sanding (rods only), drilling (rods only), and cleaning; final inspection after retrieval from storage, right before insertion; final acceptance defined by go/no-go at insertion; absorber, far end and signal plates: overall dimensions checked for each plate (shipment acceptance inspection) ; ~100 electrode and ground pin holes (signal and far end plates only) in each plate checked for dimensions (go/no-go gauges); individual inspections of all plates and tubes after cleaning;

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona traveler forms are used to trace tubes, rods, etc. during the processing; information is later merged with logbook entries into electronic database, if applicable; traveler forms are used to trace tubes, rods, etc. during the processing; information is later merged with logbook entries into electronic database, if applicable; original packaging information date of QC and bagging is in logbook cleaning batch number is reference for tube insertion tags are used to identify cleaning batches through the cleaning procedure; Tracing of Small Parts by Batches:

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona treatment details of individual tubes can be traced through batch numbers; all traveler forms, tags, logbooks are archived at Arizona (present model); information available electronically can be distributed to a central archive at CERN, for example… treatment details of individual tubes can be traced through batch numbers; all traveler forms, tags, logbooks are archived at Arizona (present model); information available electronically can be distributed to a central archive at CERN, for example… Example: Tracing of Tubes after Insertion:

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona Production Monitoring: preliminary data collection for production monitoring, with minimum impact on the production itself (no computer input) done by crew as they go; relevant data is stored electronically in spreadsheets as soon as possible, to allow calculation of trends and status with respect to schedule, for example; comparison to schedule at least once/week at a local FCal1 production meeting (Tuesdays); results reported to FCal WG at the weekly phone conference (Wednesdays); preliminary data collection for production monitoring, with minimum impact on the production itself (no computer input) done by crew as they go; relevant data is stored electronically in spreadsheets as soon as possible, to allow calculation of trends and status with respect to schedule, for example; comparison to schedule at least once/week at a local FCal1 production meeting (Tuesdays); results reported to FCal WG at the weekly phone conference (Wednesdays);

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona tube insertion and swaging are traced using MS EXCEL spreadsheets;

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona comparisons to schedule can be done at any time using the same spreadsheets;

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona scheduled end of process projections of completion dates are also possible from the same data;

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona FCal1 quality control methods and documentation are in place for most detector parts; new methods are developed and the corresponding documentation is added as we go; process sheets have to be updated to describe the actual procedures (this is in part writing history for processes like tube cleaning, for example); production monitoring is in place for presently running processes; new monitoring will be added as we go; major concern: we need to make the essential information on our process organization available on the web (only fragments right now); FCal1 quality control methods and documentation are in place for most detector parts; new methods are developed and the corresponding documentation is added as we go; process sheets have to be updated to describe the actual procedures (this is in part writing history for processes like tube cleaning, for example); production monitoring is in place for presently running processes; new monitoring will be added as we go; major concern: we need to make the essential information on our process organization available on the web (only fragments right now); Conclusions:

Production Monitoring and QC FCal1 Production Advancement Review February 20, Peter Loch University of Arizona Tucson, Arizona Important: We build a “perfect” detector. This means that all parts in the module, specifically the electrodes, are technically ok after mechanical manipulations. As shorts in the electrodes are the major concern, we test each and every electrode with 600 V at 1 mA trip current immediately after assembly. Electrodes which do not hold this voltage are re-assembled after swabbing the tube, using a new rod. Shipping to CERN generates a hazard to the detector, and we have to re-test all electrodes after arrival. Problematic electrodes will be replaced, so that we maintain the “perfect” detector as long as technically possible.