LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.

Slides:



Advertisements
Similar presentations
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
Eric Bong LCLS FAC Injector-Linac April 7, 2005 LCLS Injector/Linac Systems Update E. Bong LCLS FAC April 7, 2005 LCLS.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
New 135-MeV injector energy requires minor changes to linac operating point…
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center 1 LCLS Linac TDR, December.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Low Emittance RF Gun Developments for PAL-XFEL
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
Basic Energy Sciences Advisory Committee MeetingLCLS February 26, 2001 J. Hastings Brookhaven National Laboratory LCLS Scientific Program X-Ray Laser Physics:
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
X-band Based FEL proposal
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Injector Performance Requirements Conventional Facilities Update
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
High Level Physics Applications for LCLS Commissioning
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Linac LLP Outline LINAC Long Lead Procurements
Linac Physics, Diagnostics, and Commissioning Strategy P
Maximum Credible Beam Event Paul Emma et al
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
LCLS Injector System Overview D. H
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Presentation transcript:

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC LCLS Linac Technical Design Review Management Eric Lind Bong December 12, 2003 System Description ProgressTimelineOrganization Work Breakdown Structure InterfacesRisk System Description ProgressTimelineOrganization Work Breakdown Structure InterfacesRisk

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC LCLS Linac System Schematic Single bunch, 1-nC charge, 1.2-  m slice emittance, 120-Hz repetition rate… (RF phase:  rf = 0 at accelerating crest) SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf   10° BC-1 L  6 m R 56   39 mm BC-2 L  22 m R 56   25 mm LTU L =275 m R 56  0 DL-1 L  12 m R 56  0 undulator L =125 m 6 MeV  z  0.83 mm    0.05 % 135 MeV  z  0.83 mm    0.10 % 250 MeV  z  0.19 mm    1.6 % 4.54 GeV  z  mm    0.71 % 14.1 GeV  z  mm    0.01 %...existing linac new rfgun 21-1b21-1d X Linac-X L =0.6 m  rf =  21-3b24-6d25-1a30-8c Shamelessly Stolen from Paul Emma

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC LCLS Linac System Summary L1(Linac Sector 21) Modified S-Band Structures New Quadrupoles BC1(Linac Sector 21) X-Band Structure Flexible Bunch Compressor Chicane Diagnostics Section L2(Linac Sector 21-24) New Wire Scanners BC2(Linac Sector 24) Flexible Bunch Compressor Chicane Diagnostics Section L1(Linac Sector 21) Modified S-Band Structures New Quadrupoles BC1(Linac Sector 21) X-Band Structure Flexible Bunch Compressor Chicane Diagnostics Section L2(Linac Sector 21-24) New Wire Scanners BC2(Linac Sector 24) Flexible Bunch Compressor Chicane Diagnostics Section L3(Linac Sector 24-BSY) Remove NPI Gun Install S-Band Structures Relocate Wire Scanners Transverse Structure LTU (C-Line – Research Yard) New Enclosure Re-use FFTB Magnets Diagnostics Section Single Beam Dumper E-Dump (Inside Ring Road) New Enclosure Spectrometer Permanent Mag Safety Bends L3(Linac Sector 24-BSY) Remove NPI Gun Install S-Band Structures Relocate Wire Scanners Transverse Structure LTU (C-Line – Research Yard) New Enclosure Re-use FFTB Magnets Diagnostics Section Single Beam Dumper E-Dump (Inside Ring Road) New Enclosure Spectrometer Permanent Mag Safety Bends

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Changes Since Spring ’03 Review SC Wiggler Eliminated Longitudinal Space Charge Instability Injector Laser Heater DL2 Expanded to LTU Accommodates Future Expansion Multiple Undulators Dumpline Redesign Remove Permanent Magnets in Dump Line Accommodates Energy Measurement Place Permanent Magnets in Photon Line SC Wiggler Eliminated Longitudinal Space Charge Instability Injector Laser Heater DL2 Expanded to LTU Accommodates Future Expansion Multiple Undulators Dumpline Redesign Remove Permanent Magnets in Dump Line Accommodates Energy Measurement Place Permanent Magnets in Photon Line

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Technical Progress Instability Studies & End to End Simulations System Re-optimized Lower Injection Energy Reduced Magnet Tolerances Component Specification Database System Layouts Generated From MAD in Solid Edge Bunch Compressor 1 Mechanics Concept Diagnostics EO Monitor Measurement in SPPS Spectrometers Upbeam & Downbeam of Undulator WBS & Manpower Loaded Schedule Component Counts from MAD Deck Operating Modes for Undulator Commissioning & Protection Instability Studies & End to End Simulations System Re-optimized Lower Injection Energy Reduced Magnet Tolerances Component Specification Database System Layouts Generated From MAD in Solid Edge Bunch Compressor 1 Mechanics Concept Diagnostics EO Monitor Measurement in SPPS Spectrometers Upbeam & Downbeam of Undulator WBS & Manpower Loaded Schedule Component Counts from MAD Deck Operating Modes for Undulator Commissioning & Protection

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Commissioning and Operations Scheduled Dates Decommission FFTBFY06 - Q1 L1-BC1 CommissioningFY07 - Q1 L2-BC2-L3 CommissioningFY07 - Q4 LTU CommissioningFY07 - Q4 Undulator CommissioningFY08 - Q1 Rate Limited Beam Beam to SBD Beam to Stoppers Beam to Main Dump LCLS OperationsFY08 - Q3 Decommission FFTBFY06 - Q1 L1-BC1 CommissioningFY07 - Q1 L2-BC2-L3 CommissioningFY07 - Q4 LTU CommissioningFY07 - Q4 Undulator CommissioningFY08 - Q1 Rate Limited Beam Beam to SBD Beam to Stoppers Beam to Main Dump LCLS OperationsFY08 - Q3

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC SLAC Operations Integration Goals LCLS Operation Dedicated LCLS Running 75% Main Linac Operation Beam Delivery to non-LCLS Experiments 25% Changeover X-Band Structure in place15 minutes High Charge Beam1 shift LCLS Operation Dedicated LCLS Running 75% Main Linac Operation Beam Delivery to non-LCLS Experiments 25% Changeover X-Band Structure in place15 minutes High Charge Beam1 shift

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Design, Long Lead Procurement, Construction, Installation, Laser Commissioning LCLS Linac Work Plan by Area Design, Long Lead Procurement, Construction, Installation, Laser Commissioning SLAC Linac Downtime

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC LCLS Linac Long Lead Procurement Items X-Band System Bunch Compressor Bend Magnets Long Lead Procurement Funds FY06, Construction Funds FY07 SLAC Linac Sector 21-1 & 21-2 X-Band Structure SLAC Linac Sector 24-7, -8 & -9 BC2 Bend Magnets BC1 Bend Magnets

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC LCLS Linac Organizational Chart Installation Manager Commissioning Manager Fabrication Coordinator Installation Manager Commissioning Manager Fabrication Coordinator

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Project Work Flow Beam Requirements (FEL) Optics Design Diagnostics Requirements System Requirements Component Specifications Mechanical Engineering and Design Controls System Specification and Design Device Control Hardware Device and System Control Software Beam Requirements (FEL) Optics Design Diagnostics Requirements System Requirements Component Specifications Mechanical Engineering and Design Controls System Specification and Design Device Control Hardware Device and System Control Software Component Fabrication/Acquisition Component Assembly Component Testing Systems Assembly & Installation Systems Testing & Checkout System Commissioning Beam Delivery Maintenance System Improvements Component Fabrication/Acquisition Component Assembly Component Testing Systems Assembly & Installation Systems Testing & Checkout System Commissioning Beam Delivery Maintenance System Improvements Data generated and passed between disciplines and across organizational boundaries.

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Technical Data Management System Definition Optics Design Beam Stability Modeling Codes Safety System (ES&H) Radiation Safety Hazardous Equipment Beam Containment Personnel Protection Component Specifications DefinitionDesignFabricationTestingInstallation System Definition Optics Design Beam Stability Modeling Codes Safety System (ES&H) Radiation Safety Hazardous Equipment Beam Containment Personnel Protection Component Specifications DefinitionDesignFabricationTestingInstallation Mechanical Drawing DB Controls System Power Conversion System Commissioning Beam Delivery Maintenance System Improvements Facility Expansion Mechanical Drawing DB Controls System Power Conversion System Commissioning Beam Delivery Maintenance System Improvements Facility Expansion Centralized data management insures consistent information distributed across disciplines.

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Work Breakdown Structure WBS used to fund activities and control budget.

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC WBS Sample Detail Types and quantities of devices derived from MAD deck

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC WBS Manpower Loading Detail Sample

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Design, Long Lead Procurement, Construction, Laser Commissioning LCLS Linac WBS Summary Design, Long Lead Procurement, Construction, Laser Commissioning All costs $k Data from DOE Critical Decision 1 Review

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC LCLS Linac System Interfaces LCLS Systems Injector LCLS Undulator LCLS X-Ray Systems LCLS Conventional Facilities LCLS Systems Injector LCLS Undulator LCLS X-Ray Systems LCLS Conventional Facilities SLAC Systems Technical Division Experimental Program Machine Operations Maintenance Organizations SLAC Systems Technical Division Experimental Program Machine Operations Maintenance Organizations Requires regular communication between LCLS system managers physicists. Requires regular design and construction progress reports to SLAC Tech Division and Accelerator Dept. Requires continued communications during operations. Requires regular communication between LCLS system managers physicists. Requires regular design and construction progress reports to SLAC Tech Division and Accelerator Dept. Requires continued communications during operations.

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Linac Controls System Use SLAC control system where it exists EPICS where new systems are implemented Main Electron Dump Linac to Undulator Beamline X-Band System Epics and SLAC Controls Interface LCLS Injector Interface Modules SLAC Timing Feedback Use SLAC control system where it exists EPICS where new systems are implemented Main Electron Dump Linac to Undulator Beamline X-Band System Epics and SLAC Controls Interface LCLS Injector Interface Modules SLAC Timing Feedback

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Technical Risk Low Risk Devices & Systems S-Band RF Configuration Changes Beamline Design Vacuum System Standard Diagnostic Devices Medium Risk Devices & Systems High Precision OTR Screens RF Stability High Risk Devices and Systems Bunch Length Measurement Devices Bunch Length Based Feedback Large Increase in Engineering Manpower in FY05 Low Risk Devices & Systems S-Band RF Configuration Changes Beamline Design Vacuum System Standard Diagnostic Devices Medium Risk Devices & Systems High Precision OTR Screens RF Stability High Risk Devices and Systems Bunch Length Measurement Devices Bunch Length Based Feedback Large Increase in Engineering Manpower in FY05

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Open Issues LTU and Dumpline Dumpline Optics Design Radiation Physics Approval PPS BCS MPS Conventional Facilities Parameters Control System Controls System Manager System Definition SLAC – EPICS Interface LTU and Dumpline Dumpline Optics Design Radiation Physics Approval PPS BCS MPS Conventional Facilities Parameters Control System Controls System Manager System Definition SLAC – EPICS Interface

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC Conclusion WBS derived from MAD deck. Main dump design immature (Rad Physics) Database will be used to manage technical information. Shared role of Linac requires ongoing communication between LCLS and TD/AD. Challenges in mixed control system Need more controls engineering involvement. High risk devices and systems need R&D. WBS derived from MAD deck. Main dump design immature (Rad Physics) Database will be used to manage technical information. Shared role of Linac requires ongoing communication between LCLS and TD/AD. Challenges in mixed control system Need more controls engineering involvement. High risk devices and systems need R&D.

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC End of Presentation

LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Linac TDR December 12, 2003 Eric Bong, SLAC K$