Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 16 Monday 4/9.

Slides:



Advertisements
Similar presentations
Mitosis and Meiosis.
Advertisements

Scribe, Watch act 4 scenes, Begin reading act 5 HW: make-up work, redo work Monday: Scribe, Watch act 4 scenes, Begin reading act 5 Tuesday: Scribe, PLN.
Scott Coffin Adam Faucher Jason Graika Brian Voelz Client: Honeywell Advisor: Dr. Zhengdao Wang.
MicroCART Micro processor C ontrolled A erial R obotics T eam Abstract MicroCART is a group of EE/CprE students tasked with developing an autonomous helicopter.
1 Fifteen Steps to Developing an Effective Outline
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 1-6 Monday 11/20.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 14 Monday 3/26.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 8 Monday 2/5.
System for Engine Location Final Presentation for EE 452 Senior Capstone Project Bradley University ECE Department Adam Weintrop and Paul Wimmer Advisors:
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 10/31/05.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 3 Tuesday 10/24 – Monday 10/30.
Webtrain Decoupling Adam Kadolph EE451/452 Bradley University Advisors: Dr. Irwin, Dr. Schertz Final Presentation.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 15 Monday 4/2.
A.G.I.L.E Team Members: Brad Ramsey Derek Rodriguez Dane Wielgopolan Project Managers: Dr. Joel Schipper Dr. James Irwin Autonomously Guided Intelligent.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 2/13/06.
Networked HVAC Controller Bradley University Department of Electrical & Computer Engineering By: Ed Siok Advisor: Dr. Malinowski.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 1-6 Monday 11/27.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 4/3/06.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 5 Monday 11/13.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 3/27/06.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 13 Monday 3/12.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 12/5/05 Project Proposal -CTCDS.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 11/14/05.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 2/27/06.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 1/30/06.
1. Wind Tunnel Control (WEBWIND) By: Adam Green Advisor: Dr. Aleksander Malinowski Dr. Scott Post Bradley University Department of Electrical Engineering.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 11/21/05.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 10 Monday 2/19.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 2/6/06.
RISC Processor I/O By Eric Schultz Under Advisement of Dr. Vinod Prasad.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 9 Monday 2/12.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Design Review Presentation - Week 12 Tuesday 3/6.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 11 Monday 2/26.
EE42/100 Spring 2006Week 9a, Prof. White1 AC  DC: Using a full-wave diode rectifier circuit (used in the music system final project) The 20:1 turns ratio.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 11/7/05.
System for Engine Location of the WebTrain Adam Weintrop and Paul Wimmer Advisors Dr. Irwin and Dr. Schertz.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 3/6/06.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 17 Monday 4/16.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 3/20/06.
Natasha Benko, Kevin Jacobsen, Marcus LaRose, Scott Timme October 14, 2009 Our design will automatically calibrate your speedometer according to tire size.
Spice Chiefs Samuel Fuga Joseph Berceau Brian Mason Suleiman Alshumemry Mark Richard Advisor: Paris Wiley CDR January 26,
1 Test Slide Text works. Text works. Graphics work. Graphics work.
The Biography Unit An Online Learning Experience.
Tips for fishtank programming living with the lab © 2013 David Hall.
SENSORY BOARD FOR ADAMS ADVENTURE PLAYGROUND Danielle Napoli Alyssa Smith Christine Wakefield NAPOLI, SMITH, WAKEFIELD 1 Team 22 Project 41 TA – Sarah.
EE/CS 480 Fall University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope.
Revision – a single class portfolio that will go on web Portfolio for week one – revise your analysis products and complete the following: For each individual.
Loops, Databases, Procedures, and Lists Dr. José M. Reyes Álamo.
WEEK 1 You have 10 seconds to name…
SENSORY BOARD FOR ADAMS ADVENTURE PLAYGROUND Danielle Napoli Alyssa Smith Christine Wakefield NAPOLI, SMITH, WAKEFIELD 1 Team 22 Project 41 TA – Sarah.
By Levi Koller. SCHOOL  Spend 8 hours a day four days a week HOME WORK  1 ½ hours after school to work on it five days a week.
Semester Calendar Academic Affairs. Proposed Calendar Outline Two 15 weeks semesters, one week of finals, one week for grading Fall Semester – Begin:
Project Long Tom OTTR Team Annette Collins Tom Kinnear Jeff Scott Advisor Dr. Aziz Inan Dr. Peter Osterberg Industry Representative Mr. Mike Desmith Intel.
Nathanael O’Hara. IDEAS I Researched Games Tables I liked these designs in part I decided to mesh the designs into something I liked and also could work.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Our Robotics Experience Marlon, Erie, Leslie, Marleny, Ayla.
By: Ryan Irwin 6th Grade Globaloria.
Dr. Kyung Eun Park Summer 2017
Social Studies Project
Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz
Introduction to AC Bridge.
System for Engine Location Of a Web Train
Arduino Part 4 Let there be more light.
Cleaning Up November 28, 2005.
Project 7: Modeling Social Network Structures and their Dynamic Evolutions with User- Generated Data from IoT REU Student: Emma Ambrosini Graduate mentors:
Year 2 Spring Term Week 3 Lesson 3
Can you put the symbols in?
GPS Navigation System ET Spring 2018
Year 2 Spring Term Week 3 Lesson 3
Presentation transcript:

Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 16 Monday 4/9

2 Outline Last Week Current Week –Calibration Program –Autodecouple Program –Final Issues Questions and Comments

3 Last Week Finished Calibration Program –Some coding Started Autodecouple Program –Began coding stage 1 of 3 Setup hardware to allow all four sensors to work –Measured voltages from sensors –Discovered that empirical data is consistent due to my Resistor biasing scheme

4 Current Week Test Calibration Program Finish Autodecouple stage 1 Final Issues to close up

5 Timeline

6 Calibration Program Coding is finished Testing needs to be done –My approach is to break into parts –Test one part at a time

7 Autodecouple Program Start and Finish Stage 1 of 3 Coding is very similar to Calibration Program –Using CJNE and JC/JNC commands in conjunction –Can make comparisons

8 Finalizing the Project Finish all stages of autodecouple Improve coupler using finite graphite Putting all the code together Clean up code

9 Questions? The End