Cryo Capture Cavity II Progress Mike McGee April 13, 2005.

Slides:



Advertisements
Similar presentations
Series I Pump and Prep Pump Prior to removing the head, rotate the flag on the top of the motor so the piston is fully retracted. Remove thumb nuts.
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Superconducting Spoke Resonator Cavities and Cryomodules
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Check the component list with FNAL solid model Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Teleconference ACS – FREIA 31th May 2017
Completion of the MICE-US construction project
TDR guideline discussion on Cavity Integration
FRIB Cryogenic Support
Meeting for S1-Global module design Cryomodule and Cryogenics
S1-G cryomodule assembly status
Cryostat design Mechanical design: Thermal screens: Specifications:
IHEP Cryomodule Status
On the accuracy of port assembly at Wendelstein 7-X
Cryomodule Assembly Plan
SC1R Cold Box PDR Assembly Sequence
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Cryo Capture Cavity II Progress Mike McGee April 13, 2005

Status at Fermilab Ordering stainless steel materials for transitions, spool and fixture Designing helium return pipe reducer and flanged connection Modifying helium vessel clamp design to accommodate type III helium vessel Designing shipping/installation fixture Preparing overall assembly procedure for Cryo Capture Cavity II during various stages Preparing for dry fit of assembly into vacuum vessel

Comparison of helium vessels Providing clearance for helium vessel tabs (4) Providing clearance for return pipe feed from helium vessel

Modified helium vessel clamp Modification areas are shown in red (note return pipe is actually rotated –45 degrees)

Openings for helium vessel clamps 4 openings in magnetic shielding per helium vessel clamp Will provide DESY with shielding drawing of opening placement by Thursday

Magnetic shield opening detail 4 screw cut-outs and 4 pad cut-outs

Modify 80K shield Horizontal orientation for both valves Cut holes in 80K shield

Modify VAT valve Machine off hex head and cut square (for use with ratchet extension) on VAT valve spindles

Existing Tuner Stepper motor interferes with bottom of US VAT valve Use of mirrored DESY tuner

Dry fit at Fermilab Assemble transitions and pseudo VAT valve spools with existing cavity on installation fixture

Dry fit at Fermilab Insert assembly into vacuum vessel off horizontal axis

Dry fit at Fermilab

Low radial profile end flange design

Assembly for DESY Send to DESY (May 2005) Cleaned US and DS warm-to-cold transitions and spool Under argon positive pressure valve w/filter blank flange

Assembly for DESY with fixture Assembly sent to DESY in crate with shipping fixture

VAT valve support

Assembly shipped from DESY Assembly Cavity and helium vessel Spool between VAT valve and cavity Mirrored tuner Magnetic shield Input coupler US & DS Warm-to-cold transitions and spool

Install cavity assembly into vacuum vessel Use of monorail with end supports Insert off horizontal axis

DS warm-to-cold transition

US warm-to-cold transition

Shipping fixture baseline vibration study en-route from DESY We need baseline information of overseas shipping for Capture Cavity II and other devices Media Recovery “Shock-Log” Provides acceleration measure in x, y and z Custom software provided is Windows compatible for use with laptop

Shock-Log Use Also features a “wake-up threshold if a specified acceleration is exceeded Cost of device with software $2,400 Features ability to optimize sample rate based on trip duration Checking on acceptance by US Customs and Homeland Security US Customs, Air Carriers and Homeland Security are more likely to allowable a commercial device rather than one homemade

Schedule