MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang.

Slides:



Advertisements
Similar presentations
Mice Beam Stop Geoff Barber 1 Mice Beam Stop (end of DSA) Details of the current Layout and how it was arrived at.
Advertisements

G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
G.Barber Mice Tracker Integration Jun Tracker integration.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Cooling Channel layout Presented by Stephanie Yang & Wing Lau.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
M.apollonioImperial College - London1 M. Apollonio University of Oxford the MICE diffuser: issues and operation MICE beamline review Nov. 16 th 2007 Imperial.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Summary of the change request from KEK KEK suggested 4 changes to be made on the AFC. We have looked into the request carefully and discussed the implications.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 PID Support Design Stephanie Yang.
MICE Collaboration Meeting 15 Fermilab MICE Integration By Oxford University.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
M.apollonioCM17 -CERN- (22/2-25/2/2007)1 M. Apollonio – University of Oxford sizes for PID & shields.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
EC: 7 DISK concept Preliminary considerations
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
Services Layout – Update
Design of Distribution Feedbox at LHC P7
Outcome 4 Mechanical central heating controls Unit 208: Central heating systems.
Integration and IR Hall
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Presentation transcript:

MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang

S Yang, 26-Jun Positional requirement of Diffuser

1046 mm mm z= mm End Coil 120 mm mm mm 7.6 mm mm Diffuser position (relative to the centre of MICE in stage VI). Q9 Diffuser 17-Jan mm 250mm Iron Shield Patch panel 163mm -6173mm Courtesy of Paul Drumm

S Yang, 26-Jun Clearance envelop for the diffuser assembly approx. 150 mm Diffuser envelop when fully withdrawn Patch panel Tracker solenoid Iron shield Clearance gap = 250mm Patch panel Tracker solenoid Iron shield Clearance gap = 250mm 163 mm from flange face The space constraint & positioning requirement for the diffuser 95 mm Diffuser fully extended The design as it was Now it has changed!

S Yang, 26-Jun The task To design a mechanism that allows the insertion and mounting of the lead diffuser into the inner bore of the tracker module without having to disturb the mounting arrangement of the PID components; The tight space (about 140mm gap) between the fibre tracker patch panel and the Iron shield is such that it makes the mounting operation awkward and unreliable; This design employs a mechanism that is user friendly and guarantees the positioning of the diffuser to the required tolerance level Lets look at the design principle of that mechanism

S Yang, 26-Jun Insertion of diffuser assembly caused the main arm to be rotated, thereby extending the arm mechanism See animation in the next 9 pages on how this works

S Yang, 26-Jun-20057

8

9

10

S Yang, 26-Jun

S Yang, 26-Jun

S Yang, 26-Jun

S Yang, 26-Jun

S Yang, 26-Jun

S Yang, 26-Jun The Knife edge flange mounted on the top of the patch panel cover plate The original arrangement

S Yang, 26-Jun NO NO NO! You are not serious! Nothing can touch my Patch Panel. Imperial College Confirmation was sought from our collaborator on Fibre Tracker…………and…

S Yang, 26-Jun Patch Panel module Drawing received from Geoff Barber in Imperial Collage on 23 rd Jun, 2005 Courtesy of Geoff Barber

S Yang, 26-Jun Adaptive Knife-edge flange mounting on the end plate of the tracker module

S Yang, 26-Jun The need to feed the fibres from the fibre tracker out to the patch panel requires extra radial space. As a result, we have to modify the top-hat design to accommodate both the diffuser and the extra room for the fibre feed through. Radial space needed by the diffuser Space needed by the fibre

S Yang, 26-Jun One of the solution for fixing the diffuser mounting problem:

S Yang, 26-Jun D exploded view

S Yang, 26-Jun

S Yang, 26-Jun Summary We believe the diffuser works well. We have made two prototype (a scaled model and a full model) to demonstrate how the mechanism works; The need to liaise with other component supplier is essential. In the case of the patch panel we are pleased that we have identified the problem at this early stage which saved us having to redesign the diffuser mechanism although minor modification was needed to keep both sides happy; Further improvement is still possible to ease the handling of the diffuser if and when the lead plate needs replacing