Workshop TS 27-29 May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
JINR: J. Budagov, V. Glagolev, M. Lyablin, G. Shirkov CERN: H. Mainaud Durand, G. Stern A laser based fiducial line for high precision multipoint alignment.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
H. SCHMICKLER Alignment challenges for a future linear collider.
RasClic: A long-baseline 3-point alignment system for Linear Accelerators H. Manaud Durand, J-P. Quesnel, T. Touzé CERN TS-SU, Geneva, Switzerland Harry.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Tunnel implementations (laser straight) Central Injector complex.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Introduction to the PACMAN project A study on Particle Accelerator Components’ Metrology and Alignment to the Nanometre scale OUTLINE Scientific goals.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
PACMAN : technical objectives Hélène Mainaud Durand.
CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
CLIC Parameter Working Group Two Beam Module Design
ALIGNMENT OF THE NEW TRIPLETS
David Urner Oxford University/JAI
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
List of changes and improvements for the next generation CLIC module
Need for Alignment Position of off-momentum proton w.r.t. beam
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
Alignment challenges for a future linear collider
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 OVERVIEW INTRODUCTION – general alignment concept PROGRES ET STRATEGIE – around 4 key points A stable and accurate alignment system Associated sensors with the required uncertainty of measurement Fiducialisation and internal metrology Significance of the simulations CONCLUSION

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 CLIC synoptic for E CM = 3 TeV

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 CLIC and ALIGNMENT Tolerance of the transverse pre-alignment of the CLIC components: ± 10 microns (3  ) on a sliding window of 200m along each linac (the pre-alignment must allow the sending of a pilot beam, in order to implement the beam based alignment) At the micron scale: this pre-alignment needs to be active  the alignment of the components is monitored continuously and reajusted when necessary. A scale order concerning this pre-alignment tolerance : For the LHC: ± 0.3 mm over 100 m (3  ) CLIC pre-alignment = technological challenge

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 GENERAL ALIGNMENT CONCEPT Cross section

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 GENERAL ALIGNMENT CONCEPT As it is not possible to implement a straight alignment reference over 20 km: use of overlapping references Two references under study: a stretched wire a laser beam under vacuum

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 GENERAL ALIGNMENT CONCEPT The feasibility is proved if one can demonstrate: A stable alignment reference, known at the micron level Sub-micrometric sensors A mechanical/electrical zero of each sensor perfectly determined with respect to the reference of the component to align A solution of pre-alignment compatible with the general alignment strategy, and with the other accelerator equipment or services.  Implementation of a R&D strategy in order to prove the feasibility of the pre-alignment solution, reviewing each key point carefully.

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 PROGRESSES AND STRATEGY – around 4 key points A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology Significance of the simulations

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 A STRETCHED WIRE AS AN ALIGNMENT REFERENCE FOR THE LHC

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 A STRETCHED WIRE AS AN ALIGNMENT REFERENCE FOR THE LHC Wire Positioning System (WPS)

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 A STRETCHED WIRE AS AN ALIGNMENT REFERENCE On the scale of a micron, the stability and the determination of the shape of the wire are far more difficult to reach. Among the parameters that can contribute to variation in the shape of the wire: Gravity change, function of: Wire location Distribution of the masses in the neighborhood Attraction of the moon and the sun Effect of the rotation of the Earth Weather report (humidity, temperature) Air currents

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 TT1 TEST FACILITY Objectives:  comparison of the alignment systems  determination of the uncertainty of measurements of these alignment systems  a better knowledge of a stretched wire

 (rad): 0.4  m over 2 days  (vert): 0.6  m  (T)=0.2°C  humidity=7.7 % TT1 TEST FACILITY

500 m TEST FACILITY

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may m TEST FACILITY

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may m TEST FACILITY

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may m TEST FACILITY

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 PROGRESSES AND STRATEGY – around 4 key points A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology Significance of the simulations

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 SUITABLE SENSORS What is needed: A sub micrometric resolution A known and controlled drift A good interchangeability and a suitable mechanical interface Repeatability of measurement better than the micron

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 A STRETCHED WIRE ALIGNMENT SYSTEM What remains to be done: To validate experimentally the effect of the Earth rotation on the stretched wire To continue with the tests to obtain a better knowledge of the parameters which influence the shape of the wire (humidity,…) To study the influence of the gravity changes on a stretched wire and on the leveling system (foreseen for the modelization of the shape of the wire) To very accurately modelize a wire To develop an optical WPS sensor

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 AN OTHER ALIGNMENT SYSTEM: RasCLIC Several upgrades since 2006: Extension of the facility up to 140m Laser guided to the vacuum tube through an optical fiber Sub micrometric resolution Low frequency seismograph.  Problem: how to use it for the CLIC pre-alignment?

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 PROGRESSES AND STRATEGY – around 4 key points A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology Significance of the simulations

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 METROLOGY AND FIDUCIALISATION In the CTF2 facility, the components (CAS, PETS) were maintained aligned in a closed loop w.r.t. a stretched wire within a window of ± 5 microns, thanks to sensors and micro movers, in a very radioactive environment. Small scale solution to align the accelerating cavities on the girders Mechanical design to update (modification of the size of the components, integration of the other equipments and services) Fiducialisation within a few microns

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 Aligned independently from the girders along 5 degrees of freedom Micrometric supporting solution tested and validated in the CTF2 facility, but non compatible with the stabilization required (1 nm in vertical) All these solutions will be tested in the CLEX facility ( ), but before it is necessary: to propose a solution for the fiducialisation to finalize the technical specifications concerning the stepper motors in order to buy the propotypes asap. the compatibility between the pre-alignment solution and the stabilization solution concerning the « main beam » quadrupole is studied in conjunction with the Stabilization Working Group. METROLOGY AND FIDUCIALISATION The case of the « main beam » quadrupole

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 PROGRESSES AND STRATEGY – around 4 key points A known and stable alignment reference Sub micrometric sensors Fiducialisation and internal metrology Significance of the simulations

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 SIMULATIONS  To simulate the « absolute » uncertainty of position of the CLIC components along the linac, using the Survey standard tools, in order to get additional input for the simulations of the beam dynamics. Pre-alignment tolerance : ± 10 microns over 200 m

General CLIC alignment: progresses and strategy H. Mainaud Durand, 27 may 2008 CONCLUSION A R&D strategy around 4 key points is being actively followed. CLIC team working full time on the subject: a Surveyor doctorate student, in charge of the methods and strategies of alignment, the simulations, as well as the research studies on the wire itself. a Fellow in charge of the mechanical studies, of the development of an optical WPS, being also an interface with the stabilization studies. a geodesist doctorate student, in charge of the theoretical and practical studies concerning the influence of the gravity on a stretched wire.