TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10, 2009 1.

Slides:



Advertisements
Similar presentations
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Advertisements

Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
G2P Target installation and Beyond. Schedule Pivot before.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Jim Stewart (JLAB) Internal Magnet Review May 2009.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Thomas Jefferson National Accelerator Facility Hall D Tagger Magnet Review July 10, 2009 Hall D Tagger Infrastructure Presented by Tim Whitlatch Hall D.
Jim Stewart JLAB Internal Review May Tagger magnet design 1.5 T nominal field 1.1 m wide 1.4 m high 6.3 m long Slabbed construction Heaviest piece.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Jim Stewart Tagger Magnet Design Review July 2009.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
Bubble Chamber Planning Meeting 04 September
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
23 July 2012D. Sober1 Some thoughts on Hall D tagger magnet field mapping D. Sober Catholic University of America GlueX Beam/Tagger biweekly meeting 23.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
GlueX Collaboration Meeting. Jefferson Lab. September 9 – 11, Review of Tagger System.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
SBS Magnet and Support Status Robin Wines June 2013.
The integration of 420 m detectors into the LHC
Shielding review for temporary spectrometer for RUBICON experiment, ATF beamline #2 K. Kusche, M. Fedurin RSC meeting, Jan 20, 2015.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Concepts of the Mu2e Electrostatic Septa - Large Scale Prototype David Tinsley Mu2e Resonant Extraction Technical Review August 25, 2015.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
R. Arnold SLAC 24 June 2002 Real Photon Collaboration Conceptual Design Review Beam Monitoring Instruments.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
The design schemes of the low field dipole magnets
The Budker Institute of Nuclear Physics
Vacuum chamber for experiment HIHEX at FAIR
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
HRS at small angles for e+/ e- pair for APEX
XFEL Collimation and Beam Switchyard Vacuum Issues
Additional Upstream Coil Shielding
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
CRYOMODULE FINAL ASSEMBLY
IR Beam Transport Status
Presentation transcript:

TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,

Tagger Area Hall D Tagger Magnet Design Review July 10, North Wall Shielding Beamline encasement to Hall D AC ducts Radiator Vacuum Chamber Quad Electron dump Truck ramp entrance Permanent Magnet Tagger Magnet Photon Beamline Beam Current Monitor Vacuum gages and pump

Tagger Components Hall D Tagger Magnet Design Review July 10, Tagger support stands Hodoscope frame attach points Tagger strong back Vacuum Chamber supports Magnet steel Vacuum chamber Coils Preloaded threaded rod

Adjustment cartridges use wedge type for vertical Sliders for X-Z +/- 1cm horizontal plane adjustment +/-9mm vertical adjustment (standard part) Each piece under 25 tons Provision for porta-power for alignment Vacuum chamber and pole form integral vacuum space 4 Hall D Tagger Magnet Design Review July 10, 2009 Tagger Cross-Section Adjustment cartridges

Magnet Cross-Section from Yang’s TOSCA (early version) Hall D Tagger Magnet Design Review July 10, Rowgoski contour all edges Gap machined to within ±.004 inches All steel 1006 annealed

Vacuum Chamber Support Hall D Tagger Magnet Design Review July 10, Window opening Support rods Support tubes Vacuum Chamber Window opening 45mm x 11.2 m O-ring Support rods

Vacuum Chamber Hall D Tagger Magnet Design Review July 10, Stiffening ribs 1 inch plate Skin, 0.25 inch plate O-ring groove along entire edge, top and bottom Photon beam tube 12GeV electron beam exit opening Additional port for mag field probes both ends (location TBD due to synchrotron radiation) Add vacuum pumping port (not shown) Beam

Port for mag field probes both ends O-ring Groove (3/8) Hall D Tagger Magnet Design Review July 10, Thin window Thicker flange for radius of o- ring groove Beam tube Generous Radii (1.3 in) for better sealing Support features Add pumping port Beam

Vacuum Seal Details Hall D Tagger Magnet Design Review July 10, Coil Vacuum Chamber back wall O-ring Pole tip Lower pole Upper pole Support rod 30mm gap

Vacuum Chamber Exit 25 x 4.5 cm 12GeV electron beam opening 2.5 cm thick flange 10 Hall D Tagger Magnet Design Review July 10, mm x 11.2 m window opening (thin window)

Coils m 548 mm Magnet Coils 12 by 7 cu/epoxy matrix. 11 mm sq cu 7 mm water path 1.5 T  220A 105V 1.8 T  366A 200V 11 Hall D Tagger Magnet Design Review July 10, 2009

Coils Connections Magnet Coils Electrical Series 1.8 T  366A 200V 0.52 ohms Klixons and electrical flag connections needed 12 Hall D Tagger Magnet Design Review July 10, 2009 Tubes brazed together to form series circuit Plexiglass shield for safety Magnet Coils Cooling 28 parallel circuits LCW 34GPM 8°C∆T 6.5 ft/sec

Tagger Support Hall D Tagger Magnet Design Review July 10, I-beam strongback 3-point adjustment ±9mm vertical adjustment ±1cm x-y adjustment Vacuum chamber support Stands grouted in place after alignment Final magnet alignment after install Strongback Vacuum Chamber supports Base stands Adjustment cartridges Hodoscope attach points

Tagger Alignment Use optical means to determine relation between pole edges and fiducials on each slab within 50 microns Laser tracking fiducial targets on tagger magnet to position relative to monuments within 40 microns Targets visible after install on upstream end 14 Optically sight pole edges

Status of 3D Model Magnet mostly modeled (needs coil support features) Coil attach and layout needs to be complete Vacuum chamber needs flange and window attach features Support stands and adjustment mechanisms need more detail Need to add jacking and alignment features to magnet steel Hall D Tagger Magnet Design Review July 10,

What Needs to be done? Finalize analysis on vacuum chamber and stand Finalize hodoscope attachment Analyze magnet support structure Complete coil support design Complete coil electrical/cooling design Finalize tagger spec and SOW Produce complete design drawings for tagger components Procure/manufacture components Detail installation procedure Write analysis tech note (pressure system and structural) Perform ES&H detailed analysis Develop detailed plan for mapping Thin window design Look at ¼” o-ring Hall D Tagger Magnet Design Review July 10,