MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CM18 RAL Alain Blondel 14 June MICE run plan -- steps I and II 1.Establishing the detailed run plan will be one of the mission of the MICE.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
MOM report – part I Roumen Tsenov as MOM ( )
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
M. apollonio MICE Beamline summary. - Beamline parallel session (June 1 st ): - envisaged goals (Alain) - assess readiness of the line magnet status (Ken)
MOM Report Victoria Blackmore VC /06/11 1/7.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Luminosity Monitor Status
Completing the Step IV Programme
Presentation transcript:

MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010

Commissioning Needs-Soler2 Commissioning Needs Decay Solenoid: further update —Linde refrigerator developed fault: large N 2 impurity level —Linde engineer changed charcoal in gas panel adsorber, March —Compressor shaft seal was then thought to be the culprit —HPC (local agents for Linde) tried to extract seal but had to dismantle compressor —Whole compressor replaced Tuesday 20 April —Matt measured impurity level on Thursday-Friday April (see next slide) with cryo-adsorber disconnected – N 2 level rises at ~3 ppm/hour, while H 2 0 impurity level remains constant —Mike thinks that we need to focus attention on adsorber and gas panel where there might be a leak since vacuum has never been very good in the adsorber – is it possible that one of the valves or piping has a leak when system is running? —Run leak tests with running system again (from this week)

April 26, 2010Commissioning Needs-Soler3 Commissioning Needs N 2, H 2 0 impurity levels

April 26, 2010Commissioning Needs-Soler4 Target —Investigation of target forces —Emily Longhi (from Diamond) working to find if magnetic centre = geometric centre Magnetic Centre

April 26, 2010Commissioning Needs-Soler5 Target Mechanical/Optical Measurements Bearing Tool Hall Probe A B Bore D C OpticalFaro A5.6 +/-0.1  AB=0.33 B5.89 +/-0.06 C6.57 +/-0.05  CD=0.94 D7.47 +/-0.05 Target —Mismatch between geometric and magnetic centre: ~0.5 mm —Is this the smoking for lateral forces in target shaft?

April 26, 2010Commissioning Needs-Soler6 Detectors —Luminosity Monitor o Successful run on Tuesday 20 April (runs ) for LM gate width studies: data 10, 20, 30, 40 ns gates for ~0.4 V, 1 V and 1.3 V – being analysed now —Tracker o Nothing new to report Detectors —CKOV,TOF0, TOF1, TOF2, KL: all powered up and ready to go o Request to have new TOF calibration with defocused beam to populate counters on the edge of acceptance o Ran this weekend April for TOF calibration 10,000 actuations with 300 MeV pion beam and 1,000 actuations with 300 MeV positron beam —Beam Profile Monitors: also running Beam Magnets —Had lots of problems with flow rate meters on power supplies during weekend run. Q6 and Q7 kept on tripping because of flow problems (typically every 10 minutes!) – maybe the flow rates are too high (recently changed to l/min) —Flow rate trips were annoying but maybe not too important for TOF claibration run. However, this would be an unacceptable running mode if we were doing emittance measurement runs. —Need to purchase new flow rate meters Hall work: —PPS electrical system installation has started with DL staff

April 26, 2010Commissioning Needs-Soler7 Summary last week’s runs Machine development period: April —One shift (18:00-1:30) on Friday 16 April for Luminosity Monitor gate width studies: all hardware worked well but had to abort due to bad ISIS beam ISIS run: 20 April – 28 May —Shift 20 April: rescheduled from Friday for LM gate studies o Run successful: took data 10, 20, 30, 40 ns gates for ~0.4 V, 1 V and 1.3 V – being analysed now —Weekend April o Performed TOF0,1,2 calibration with blown up defocused beam – 10,000 actuations of 300 MeV pi+ beam with defocused Q7, Q8, Q9 by 20%, 20%, 40%, and 1,000 actuations with e+ beam. o Friday 23 April running was hampered by EPICS problem – a change made to the slew rate to ramp up magnets was not communicated to MOM and had a bug – it always set the current at 0 A o After finding cause of problem, old EPICS version was reinstalled and magnets were then successfully ramped up. o Since it was 11:00 pm when this was fixed, we aborted run to return Saturday

April 26, 2010Commissioning Needs-Soler8 Summary last week’s runs ISIS run: 20 April – 28 May (cont.) —Weekend April (cont.) o Saturday 24 April: successful TOF calibration run with 300 MeV pi+ beam: 10,000 actuations with runs o Beamloss profile flatter by entering earlier ( delay)-see plot o Sunday 25 April: tried to run 1,000 actuations of a 300 MeV e+ beam with defocused Q6, Q7, Q8 o Unfortunately I forgot to raise beam stop, so the trigger rate was very low (~2 per spill)!!!! Since I did not know what rate to expect we ran for four hours in this way before realising mistake (runs ) o Then, we raised beam stop and runs contain the good positron runs for TOF calibration o Other issue: we need to make sure target calibrations (every 10,000 actuations) can be done by BLOC so as not to stop long weekend runs —Conclusion: o Apart from a few niggling problems (EPICS problem, Q6 and Q7 trips, and the bad positron run) I think weekend running was a success and allows for more efficient data taking. o I propose we continue with runs on weekends.

April 26, 2010Commissioning Needs-Soler9 Summary last week’s runs Beam loss profile

April 26, 2010Commissioning Needs-Soler10 Run plan ISIS run: 20 April – 28 May (cont.) —Chris Roger takes over as MOM from today so he should comment on schedule. However, we had a preliminary plan from VC that we could follow —Weekend 30 April – 3 May: o If Yordan needs more data for TOF calibration then we could run some more (he would have to tell us how much more) o However, if TOF calibration OK, then continue with plan: proton absorber tests – move different thickness of absorber to compare particle rate vs absorber thickness – Marco should say what are best settings and how much statistics —Weekend 7-10 May: likely that the Decay Solenoid will not be ready o Propose to continue with target scan: delay target vs depth (ie acceleration) to try and flatten spill and reduce pileup and beam overlaps.- suggestion for weekend of 7-10 May (Do we need to wait for DS to be ready?) o There was a successful flattening of beamloss profile during last weekend but might need to do it more systematically

April 26, 2010Commissioning Needs-Soler11 Run plan ISIS run: 20 April – 28 May (cont.) —Once Decay Solenoid is ready: o Work our way through Step I physics programme: matrix of emittance (4 , 6 , 10  ) vs momentum (160, 200, 240 MeV/c) with all detectors on – May, May o Statistics for each point? ~10 5 muons? ISIS shutdown: 29 May-6 June Next machine development period: 7-21 June —Request further activation run: 16 hours with 4V beamloss? ISIS users run: 22 June – 12 August —Continue with Step I programme of emittance vs momentum matrix. —Can cope with only running on weekends for the time being but if we are running out of time to complete programme, we could also schedule runs during the week for this period Machine Physics: August Long shutdown: 16 August January 2011