LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

256 channel data acquisition system for VISTA focal plane to readout sixteen 2k x 2k VIRGO detectors Largest ever such system.
The MAD chip: 4 channel preamplifier + discriminator.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
ESODAC Study for a new ESO Detector Array Controller.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
GlueX CDC Update and Electronics Outlook GlueX/HallD Collaboration Meeting Jefferson Lab April 2006 Michael McCracken Carnegie Mellon University.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
MiniBoone Detector: Digitization at Feed Through Student: John Odeghe ; SC State, Fermi Lab Intern Supervisor: JinYuan Wu; Fermi Lab 1.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
Front End DAQ for TREND. 2 Introduction: analog part 2015, feb 10 th.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
TPC Design Concept: From MicroBooNE to LAr20
Questions on IFPAC_SCHEMATIC. Signal Chain Preamplifier Compensation Capacitor should go to –Vs, not GND Where is resistor For compensation Network? Does.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
By: Uriel Barron Matan Schlanger Supervisor: Mony Orbach Final Review March 2015.
Preamplifiers : BGA 2003 (Silicon MMIC amplifier): In general, the function of a preamp is to amplify a low-level signal to line-level. DESCRIPTION: Silicon.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
False asymmetries/Ground Loops David Bowman 4/27/12.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
1 Carleton/Montreal Electronics development J.-P Martin (Montreal) Shengli Liu & M. Dixit (Carleton) LC TPC Meeting DESY Hamburg, 4 June 2007.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Installation of the T600 at Fermilab Fermilab, February 15,
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
PADME Front-End Electronics
Installation of the T600 at Fermilab
LKr status R. Fantechi.
Calorimeter Mu2e Development electronics Front-end Review
Readout System of the CMS Pixel Detector
EMC Electronics and Trigger Review and Trigger Plan
Open book, open notes, bring a calculator
University of California Los Angeles
BESIII EMC electronics
The CMS Tracking Readout and Front End Driver Testing
RPC Electronics Overall system diagram Current status At detector
ZDD status BESIII Collaboration Meeting, September 2012
ICARUS Internal Cryogenic Sensors
Presentation transcript:

LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010

History of the MSU LArTPC Electronics Work - Built a small warm DAQ system for the Bo LArTPC - Built a warm DAQ system with cold Bias Voltage distribution for the ArgoNeuT LArTPC - About one year ago Stephen Pordes ask us to work on a small multiplexed readout DAQ system that would operate cold in LArTPC test cryostats

Motivation and Goals of Our Current Work - Test this DAQ system in the Bo LArTPC - Provide a DAQ system for the “no pump out” long drift LAPD LArTPC at Fermi - Gain experience with multiplexed readout and cold electronics in a LArTPC DAQ system - Gain experience with digital signals inside the LArTPC cryostat - Work on ideas to reduce the cost of the DAQ system for a big detector (3 box to 2 box system)

Project Sections of our Current Work: 1. Characterize components at LN2 temperature 2. Inside the cryostat - Preamplifier - Filter - Multiplexer - Line Driver - Digital Control of the Multiplexer 3. At the Cryostat Feedthrough - Passive Noise Filters: power supply, analog common mode, digital control signal coupling transformers 4. In the DAQ Rack - Back of the backplane card: power supply regulators, analog signal receivers, digital control signal drivers - Firmware for the ADF-2 VME Readout Card 5. DAQ system software

Design Considerations: - Operate at RT or LN2 temperature without significant adjustment - Per readout card have a single twist-flat cable running inside: 4 differential analog signals 2 differential digital control signals 3 power supplies (6 conductors) 8 grounds (16 conductors) 50 – 100 mV signal levels - Control electrical noise inside the cryostat

Filter Step Response

Collection Plane Signal Preamp and Filter

Line Driver and Cable Response

Output from the Chain: Buffer, Multiplexer, Line Driver, Cable, and VME ADF-2 (ADC) Card Checking for Crosstalk

2 Channel Preamp-Filter Card - 4 layer with ground fill on all layers - double via connections - relieved ground plane under Hi Z traces - compromise between size and ease of modification

16 Channel Mother Board

Engineering Comments: If Fermi is going to be involved with the DAQ system for a large LArTPC detector (e.g. LBNE) then the electrical engineering work for that system should start soon. - Technical Challenges - Cost Control - Remote Assembly and Operation DAQ system engineering needs to be integrated with the mechanical and cryogenic engineering. We should “prove” that a fully thought out warm electronics system will not work before committing to put “all” of the electronics inside.

As far as I know the HEP community has no examples of a large system operating for 10 or 20 years without needing to work on its electronics. This is a one detector experiment, i.e. it must work. A thin wall stainless steel vessel will not shield electrical noise. There is no “ground” inside and there is no shield inside. Need a respected “Noise Czar” early (e.g. now).

Lots of room for DAQ design work: - Filtering of the hit data Inline Digital and Offline Slope dependent hit filtering Raw data beauty vs information content - Data Compression: Coding, ROI Readout - Triggering: Beam Spill vs Continuously Alive Low Temperature Components: - Some just don't work. - Subtle problems. - Circuit implications.

Backup