Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.

Slides:



Advertisements
Similar presentations
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
Advertisements

SCT BARREL PAR - RAL May 2003 Status of Barrel Mechanical Structures - Cylinder manufacture - Bracket and small components manufacture - Dry assembly.
Rebuilding process for the Box Type Induction Furnace.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Personnel Schedules 21/817/724/731/77/814/8. 17/724/731/77/814/821/8.
KEK TB Phase II setup status Alan Bross MICE Tracking Group Meeting Daresbury Lab August 30, 2005.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Parents’ Information Evening Wednesday 1st July 2015
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
STEAM CONDENSERS.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Cryogenics Science Center/KEK (Nobuhiro KIMURA –20/April./2010 at ATF2 meeting ) 1 Resent Progress at KEK N. KIMURA, T. TOMARU, Y. AJIMA, T. KUME, A. YAMAMOTO,
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Stabilization of Focus at ATF2 David Urner University of Oxford.
BPM support and beam pipe length FD support status A.Jeremie.
MONALISA David Urner Oxford University. Straightness Monitor Build from Distance Metres Decision taken this workshop to move from existing extraction.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Today (2/11) Class schedule update & Presentation Forums (10’) Corporate Technology Commercialization- Dr. Thomas Lindner (40’) Developing timelines and.
ISTC Project #3888 Development, manufacture and experimental investigation of a unique pilot CCDTL accelerating section in the energy range of MeV.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
P.P.H.U SOMKOL S.C. Proudly introducing : Beef Slaughter Equipment.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
MONALISA Update David Urner ATF2 Meeting Dec
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
John Deere Team Weekly Status Report Week 3 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
1. Check your order….  Please check your order confirmation documents carefully and ensure that the style, colour and quantity of the items stated match.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
S A Griffiths CM42 June 2015 Electrical & Control.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Alignment and stability session
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Ventilation Upgrade August 2017.
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
IT-4189 Supply and installation of a cryogenic distribution system
Procurement, Measurement and Installation of 2 Octupoles for ATF
Baby MIND Logistics for Japan
IBBelle: Status Commissioning at MPP Transport to KEK
STO2 I&T at APL.
IP configuration session
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
MRV system budget and scheduling Short overview installation
SC1R Cold Box PDR Assembly Sequence
Chapter 4 CLT Packing and Shipping
Presentation transcript:

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 2 Timeline until 21 Jun Vacuum tests at Oxford 22 – 23 Packing for shipment 23 – 24 Collected from Oxford 30 Jun – 2 July Paul, David and equipment arrive at KEK 2 – 6 Assemble 1 st vac test, wooden frame 7 – 8 Transfer assembly to accelerator 9 – 15 Vibration tests on accelerator 16 – 18 Dismount assembly

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 3 Oxford status Wooden test frame assembled Double bellows in Oxford lab Vacuum end boxes being finalised in workshop Assembly mounting onto wooden test frame Pressure / leak tests until monday QD0 Shintake Table

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 4 Double bellows after unpacking

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 5 Shipment to Japan We will ship vacuum system and test frame. 2 crates: Size/weight in to Terunuma-san Arrival at Narita weekend of June We need contact for transport company which will collect from Narita. Paul arrives 30. June Expect crates to be received at KEK 1. July David arrives 2. July

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 6 KEK programme: Part 1 Receive 2 crates Wed 1 July –2 crates arrive at KEK Move both crates to 1 st test area –Assemble wooden frame –Assemble vacuum system: Leak test Pressure test –Disassemble vacuum system We would like to agree a suitable test area

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 7 KEK programme: Part 2 Move vacuum system parts to IP area –Tue 7 th July Assemble onto QD0 and Shintake table –Mount end boxes onto QD0 and shintake –Connect double bellows from the centre –Close vacuum system: Leak test Pressure test Run seismometer vibration tests 9 – 15 July –Disassemble vacuum system Place into storage until autumn

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 8 Reminder of requests We requested: –A scroll pump –Supply of compressed air –Leak test equipment –Hoist for lifting double bellows system We also need: –Area to assemble wooden frame with access to the 4 items listed above –Contact details for transport company carrying from NARITA to KEK

Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 9 Questions for Terunuma-san Where might be a suitable area for wooden frame assembly? What pneumatic fitting do we need to connect to compressed air supply source –in floor at IP and –in wooden frame assembly area (if supply is not from floor) What is the approximate maximum pressure of the compressed air supply?