PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.

Slides:



Advertisements
Similar presentations
1 Parametric Oscillator Demonstration for NGAO Requirements Review Sept 9, 2010.
Advertisements

Thomas Stalcup June 15, 2006 Laser Guidestar System Status.
CHARA AO WFS Design JDM (+LS,MJI) 2012Sep06 v0.1 1.
“Riding the Hub”: The MMT Adaptive Secondary Douglas Miller University of Arizona The AO System Current Performance of the MMT AO System Ongoing Development.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
1 Visible Flexure Camera Analysis J. Kent Wallace March 14, 2006.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
PALM-3000 HOWFS - 5/29/09 C. Baranec. PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 HOWFS Design Update 2/27/08 C. Baranec Pasadena, CA February 27 th 2008.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Construction and Interfacing of a Solar Telescope Jon Turner University of Northern Colorado.
NGAO NGS WFS design review Caltech Optical Observatories 31 st March 2010.
TPAC update JC/31 st march TPAC1.2 Submitted – 2 nd March 2009 Lot started – 22 nd March 2009 Due date – 7 th May 2009.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
ME Final Project Fabian Wittmer Jason Lintker Stefan Bracher.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
1D or 2D array of photosensors can record optical images projected onto it by lens system. Individual photosensor in an imaging array is called pixel.
ISSAT “Telescope Alpha” Richard Berry Astronomical League.
Copyright : Marconi Applied Technologies Limited. All Rights Reserved. CCDs for Adaptive Optics CfAO Workshop: Nov 1999 By P.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
Characterizing Lenslet Arrays for the Keck Adaptive Optics System Laboratory for Adaptive optics (LAO) UC Santa Cruz Name: Abubakarr Bah Home Institution:
1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
1 1 st Light AO 4 LBT Pyramid WFS Adaptive Secondary MMT Unit.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
1 High-order coronagraphic phase diversity: demonstration of COFFEE on SPHERE. B.Paul 1,2, J-F Sauvage 1, L. Mugnier 1, K. Dohlen 2, D. Mouillet 3, T.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
The Active Optics System S. Thomas and the AO team.
Test Readiness Review 23 October 2003 CRAL - LYON.
Eye Tracking and its Application in MRI and EEG Settings
Active Optics and Wavefront Sensing at the Upgraded 6.5-meter MMT Xiaoyin Zhu Dec 12, 2012 OPTI 521 Paper Synopsis By T.E. Pickering, etc.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
1|8J.V. van Heijningen Cables finished! Assemble/ Disassemble Type B Payload LED selection measurements NAOJ GW Meeting, May 8 th,
CTF3 Streak Camera Results and Improvements Aurélie Rabiller BE-BI-PM
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
Better automation for lateral mark alignment 2 additional camera for measurement of marks. – 4 marks with 2 steps by fixing on main optics Idea of 2 additional.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Jeffrey R. Regester Physics Department High Point University
Project lead by Fusion For Energy (F4E)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Melissa Crawford, Renjie Zhou, and Prof. Lynford Goddard
Fabian Wittmer Jason Lintker Stefan Bracher
Quicken Problems with Application
CCD wavefront sensing system for the ESO Multi-conjugate Adaptive Optics Demonstrator (MAD) C.Cavadore, C.Cumani, The ESO-ODT team, F.Franza, E.Marchetti,
Spot-Projector System for the Measurement of Intra-Pixel Response
Presentation transcript:

PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009

PALM-3000 LabVIEW alignment GUI running on lab computer Optics assembled and tested CIN 636 – HOWFS Alignment guide version 1.0 released Final collimating mirror and cylindrical lens specified HOWFS Status Summary 2

PALM-3000 HOWFS 3 P3K - HOWFS

PALM P3K - HOWFS

PALM-3000 Live lab demonstration Start the music… Switch to remote desktop… 5 Show me the live lab demo!!! P3K - HOWFS

PALM-3000 P3K – HOWFS - s8 6

PALM-3000 P3K – HOWFS - s16 7

PALM-3000 P3K – HOWFS - s32 8

PALM-3000 P3K – HOWFS - s64 9

PALM-3000 P3K – HOWFS – Pupil imaging 10

PALM-3000 Analysis of current alignment Alignment Req.: 1/20 pixel RMS, Goal:1/40 pixel RMS –Is this the right requirement? Pupil size is what we expect to 0.2% Pupil A/B ratio: (target) ± 0.001(measured) 11

PALM-3000 HOWFS - Tasks Left Order new optics, install, re-align Test in white light Testing of new CCD50 readout modes Format Noise Internal compliance / flexure testing and validation Integration into the testbed Test pupil shift necessary for ‘s63’ mode Testing closed loop AO with HODM! 12

PALM-3000 Thanks!!! Acknowledgement to the people that have helped (in major and minor ways): Antonin, Jenny, Khanh, Rich, Mitch, Kent, Chris, Tom Stalcup (Keck), Mark Milton (UA) 13