NGAO discussion: Science Operations NGAO Meeting #4 D. Le Mignant 22 Jan. 2007.

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

Highly Efficient Operations Keck Scientific Strategic Planning 2009 Hilton Lewis T. Armandroff, S. Adkins, R. Goodrich J. Johnson, K. Kinoshita, R. Matsuda.
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
National Research Council Canada Conseil national de recherches Canada Observing Efficiency and Reliability of Gemini South MCAO Glen Herriot Herzberg.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/16/2012OVSA Preliminary Design Review.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
LGS AO Operations Transition: Introduction to Meeting April 15, 2005.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
Trying to connect WBSs with people and phases Relevant questions to my work: How the realistic NGAO strategies will/should affect the work in progress?
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Keck AO Operations D. Le Mignant for the Keck AO team.
1 HST Status Cycle 14 TAC/Panels 14 March Telescope and Instrument Status Telescope and support systems are all working well – no unexpected limitations.
W. M. Keck Observatory Subaru Users’ Meeting
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
J. Large Binocular Telescope (LBT) Operational Readiness
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
LGS AO Readiness for 05B AOWG meeting February 4, 2004 Keck LGS AO team.
DCS Overview MCS/DCS Technical Interchange Meeting August, 2000.
LBTI HOSTS Science Operations Plan Draft 0 – Feb
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
Integrated Data Cycle Systems Harvey E. Rhody Chester F. Carlson Center for Imaging Science.
SCIOPS 2013 Reinhard Hanuschik, ESO Garching The VLT Quality Control Loop.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
Why is the VLT very efficient? Fernando Comerón On behalf of Francesca Primas and Martino Romaniello.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
OpSim4 vs OpSim3 Francisco Delgado
JCMT Observation Management Project
Launch and On-orbit Checkout
NGAO topical discussion: Observing Efficiency and Uptime Budgets
Presentation transcript:

NGAO discussion: Science Operations NGAO Meeting #4 D. Le Mignant 22 Jan. 2007

2 Outline 1.Words of introduction on the topic 2.Lessons learned 1.Weather impact 2.Efficiency - weather removed 3.The good things here at Keck 4.The good things.. elsewhere 3.Top-level goals for science operations 1.Science return 2.Facility-class 3.Long-term operations 4.Observing efficiency (and uptime) 1.Proposed definitions 2. A spiritual agreement 5.Observing models and science data products 1.Instrument calibrations, maintenance and performance monitoring 2.Automation and flexibility during the observations 3.Facility science calibrations 4.Planning for science beyond our reach 6. Conclusion and Discussion

3 Science operations: an important point.. too! Science Operations Design choices have a very major impact: –On the design/cost of the AO/Laser and science instruments –On the observing model for the observers –On the science return –On the observatory budget (see NSF review) –On the Observatory future priorities Work in progress –WBS Observatory Requirements: Science Operations Requirements –WBS System Design Approach / System Engineering / Performance Budget Observing Efficiency and Observing Uptime –WBS System Design Approach / System Engineering / Trade Studies Observing Models TS –WBS System Design Approach / Science Operations AO-Instrument operations

4 Observatory Rqts Science Operations Science Requirements Observing Scenarios Observing Models TS Observing Efficiency Budget System Design Approach System Engineering Science Operations Performance budget Trade Studies AO-instruments Ops Functional and Performance Requirements Lessons Learned…

5 101 nights of Keck II LGS AO ops since Nov. 04 till Jul. 06 Lessons Learned

6 Lessons learned: weather From our statistic: ~25% of the allocated time ~18 % are entire nights close dome situation ~ 7% marginal weather affecting 1/5 of the open-dome nights -> Only ~60% of the nights are ~photometric nights Looking at other statistics: -Study for New Initiatives AURA office (Erasmus and van Staden) -ESO site search (ESPAS, 2003) - -Kaufmann and Vechhione (1981) Observing qualityPhotometric“Spectroscopic”unusableUsable Frequency of occurence (%) ~ 70-75%

7 Kaufmann and Vecchione ( )

8 Weather impact: From ESPAS and AURA report on Mauna Kea: –Usable nights with LGS < 75%: About 55% of the nights are >6h of photometric conditions) An additional fraction 10-15%? are likely usable with LGS (light cirrus) The maximum of usable time is around 2/3 of the time (240 n/yr) –Photometry: Best months are Jan and Feb. Worst months are October and April – Winds: A few nights (~3-4%) are affected by very strong winds Winds ENE-ESE in the summer, more W and SW in winter –Seeing Seeing is considered the best for the existing astronomical sites (0.5”) Seasonal trends? –Global warming (long term trend) 3.7deg / century for Mauna Loa Should the science operations takes this information in consideration and study the feasibility of more flexible schedule? –Increase observing efficiency –Reduce observing support load (?)

9 Lessons Learned: overheads are too much 1.LGS AO checkout 30min/night 2.Telescope slew and pointing 3.Target ID and centering 4.LGS AO readiness min/target 5.LGS AO optimization 2min per hour on target 6.Telescope/AO handshakes 30+ sec per dither 7.Scientific instrument setup and readout Observing strategy     Ref: 2006 SPIE papers and some Keck internal discussion for K1 LGS AO

10 Lessons learned: Observing Efficiency Keck NGS AO observing efficiency for nights w/o weather or technical problems at best vary from 25% (snapshot surveys, Lp and Ms obs) to 60-80% for deep-exposure science programs. LGSAO shows roughly the same values, except that it is more impacted by weather and technical problems For a reliable system in good weather conditions, we are currently mostly limited by 1.Serial (vs parallel) algorithms (DCS /inst/AO) during observations 2.Under-designed telescope pointing and acquisition systems 3.Under-designed AO nodding/dithering hardware and software 4.Under-designed science instrument readout 5.Aging (WFC) and/or complex instrumentation (laser) 6.Under-designed ancillary systems (photometry, seeing, PSF, etc) 7.Minimal maintenance, calibrations and performance monitoring for science instruments, AO and laser 8.Operations (Laser traffic rules, overall cost including energetic)

11 Lessons learned: some Keck goodies… A flexible and (rather) small community –Ability for observers to combine their observing time –Close interaction between observers and support staff Science Instruments –Ability for observers to try new observing modes (“push the limits”), and/or calibrate for problems they discover. –Possibility to script for simple instruments like NIRC2 –New generation of observing software with OSIRIS: OPGui and DRP AO / Laser –A best-effort / shared-risk science mode –Ability to optimize (and keep optimizing..), except for the telescope. –Proximity to the instruments for troubleshooting Community Experience: –Development, integration of new concepts on large telescope (Keck!, LGS, etc) –New-generation of instrument: OSIRIS, etc –Archive (KOA)

12 Lessons learned: other observatories’ goodies A flexible scheduling of the instruments: –Instrument failures has less impact on observing efficiency –Management of observing and eng. time w.r.t. observing conditions Instrumentation Management –Strict review for integration, testing and commissioning processes –High-quality maintenance and calibrations All instruments have maintenance schedules with archived calibrations Easier traceability of problems/trends Scientific Operations –Integrated operations Automated telescope acquisition (Magic?) Observing planning tool (obs. seq., AO/inst. config, performance estimate) Observing sequence templates for instruments / telescope –Facility calibrations Flat-field, astrometry, photometry, etc Ancillary data are archived –Archived science data for long term use –Data reduction pipeline and support. –Service observing ??

13 Observatory Rqts Science Operations Science Requirements Observing Scenarios Observing Models TS Observing Efficiency Budget System Design Approach System Engineering Science Operations Performance budget Trade Studies AO-instruments Ops Functional and Performance Requirements

14 Science Operations Goals for the Next Generation of AO instruments at Keck ( ) The spirit: “Maximize the scientific return of the allocated observing time with the NGAO instruments from 2012 to 2020” Top-level goals: 1.More than 80% of the time allocated is spent on collecting science-quality data. 2.The NGAO system combined with its science instruments is a facility-class instrument. 3.The Observatory is capable of supporting the equivalent of 240 nights/year for NGAO science operations. …btw, are we including the interferometer?..!-)

15 Some flow-down thoughts 1 - More than 80% of the time allocated should be spent on collecting science-quality data. 1.Software should permit simultaneous commands to multiple sub-systems, as well as within a sub-system 2.The time allocation method and the Keck science operations model should minimize the average impact due to lost time from bad observing conditions year-round 3.A heck of an efficient and skilled astronomer! 4.> 80% observing efficiency & uptime > 98% ? 5.Science instrument performance (image quality, sensitivity, observing efficiency and calibration stability) are documented, simulated, and monitored by the observatory on a routine basis. 1.The simulation tools should provide key-parameters with a 10 % accuracy within a range of observing conditions and instrument setup. 2.The relative astrometry solution error over the field of view should be less than 2% of a pixel. The pointing and positioning accuracy error on the science field should be known with an error less than 20% of the measured FWHM. 3.The relative and absolute photometry should be monitored throughout the observations with a precision of xx % at the observed wavelength. 6.Etc

16 Some flow-down thoughts 2 - The NGAO combined with its science instruments is facility-class instrument. 1.Facility-class has many implications on safety, operability, reliability, maintainability, lifetime, documentation, configuration management, etc. 2.Sustainability 1.Sustainable development program for the instrument? 2.Observatory cost for the operations (including energetic cost) 3.The Mauna Kea laser projection requirements must be satisfied 4.The NGAO installation, integration, testing and commissioning phases should follow the highest Observatory standards and be reviewed by the Keck community: 5.Interferometer- & Ohana- related requirements: a)NGAO should support IF and Ohana science operations b)The interferometry modes should not require the NGAO light path for optical alignment in the basement.

17 Some flow-down thoughts 3 - The Observatory is capable of supporting the equivalent of 240 nights/year for NGAO science operations. 1.Auto-calibration for NGAO performed by non AO-experts. 2. < 30 minutes of daytime telescope restriction on a science night. 3.< 30 minutes per observing night for maintenance and science instrument performance calibrations. 4.Observing tools: 1.Simulation module (telescope, natural and laser stars) for calibrating and troubleshooting the AO system, as well as a stable and accurate calibration module (wavelength, flat-field, field distortions, sensitivity) for the science instruments. 2.Atmospheric parameters and system diagnostics for image quality monitoring and PSF reconstruction. 5.A heck of a observing support team: 1.Expandable and flexible library of observing sequences for each instrument/type of science/etc. Support astronomer review the observing sequences prior to the observations. The SA will be on-call and may be present during the observations. 2.The science instrument should be operated remotely or on-site by one Observer or a Support Astronomer. 3.The telescope, the AO & laser facility should be operated by two or less Observing Assistants (or equivalent skills).

18 Observatory Rqts Science Operations Science Requirements Observing Scenarios Observing Models TS Observing Efficiency Budget System Design Approach System Engineering Science Operations Performance budget Trade Studies AO-instruments Ops Functional and Performance Requirements

19 Observing Efficiency: we care defining it! The Observing Efficiency is the open shutter time during dark time when the instrument runs at the performance level where it is designed to operate, for the given observing conditions. We care for loss of science return - no matter what! –Observing efficiency is linked to science return during the allocated time (hence weather and seeing impact should be considered)? 1.Marginal weather accounting: time loss or not, NGS AO data useful or not, etc 2.Idea of allocating few nights by TAC: highest ranked proposal gets best conditions, etc 3.Understanding observing efficiency for NGAO may require tagging the various sets of data (science, calibrations, etc). 1.Which part of the calibrations are part of the science-quality data? 2.Need for facility calibrations 4.Efficiency per brain cell (the best use of everyone's time by not having to re-invent the wheel over and over).

20 Observing efficiency and uptime (2) A spiritual agreement 1.The time allocation method and the Keck science operations model should minimize the impact due to lost time year-round. 2.Quicker, better slews, setups and moves: 1.Smaller telescope pointing error (<2 arcsec?), fast telescope slews (xdeg/min). 2.Faster target acquisition and accurate centering on science array 3.Faster dither, parallel readout, faster on-line data viewer. 4.Fast chopper (few Hz) for thermal NIR imaging? Software permits simultaneous commands to multiple sub-systems, as well as within a sub-system, in order to minimize time overhead during telescope dither, telescope slew, target acquisition, instrument setup, instrument data readout, etc. 3.The Observatory manages instrument calibrations & performance at a high-quality level. 4.The Observatory provides simulation, planning tools, observing templates, etc. 5.The PIs are responsible for performing their observations, given these tools. Mean-time-between **any failure mode** should be > 3 hour? Instrument uptime should remain higher than 98% through the night (12 min)?

21 Observatory Rqts Science Operations Science Requirements Observing Scenarios Observing Models TS Observing Efficiency Budget System Design Approach System Engineering Science Operations Performance budget Trade Studies AO-instruments Ops Functional and Performance Requirements

22 Observing Models Preliminary thoughts… Scheduling Mode Ownership Mngmnt Science Programs Weather Impact Backup options Classical night/night PI flexible highNGS AO NIRSPEC Night blocks per TAC TAC TAC/Keck 1… 5 flexible Medium to Low NGSAO NIRSPEC DEIMOS Engin.? NGAO-only Queue PI Keck 1… 5 flexible LowIden. Keck Queue ?? PI Keck Flexible LowIden.

23 Science data-products Preliminary thoughts… Science + Specifics Calibration Support Ancillary data Data reduction Archive Monitoring ClassicalobserverObservernominimumNo So-so PlusObserver Archived YesminimumCalibrations AdvancedObserverObservatoryYesMinimum calibrated Cals+science performance ServiceObservatory YescalibratedCals+science performance

24 Conclusion Next steps: 1.Help build the Observing Scenario SpreadsheetObserving Scenario Spreadsheet 2.Discussion and feedback: observing modes and science operations are not very well documented. 3.Propose to delay: 1.From the WBS Dictionary ( ): Define the overall architecture, the method and design the interfaces for operating the sub-systems of the NG AO-instrumentation. Here AO-instrument refer to AO, laser, SC, science instrument, etc. 2.Discuss operations team's strategy for structuring the remainder of the SD phase tasks under More work in many areas. One main challenge: coordinating the work with Keck and the science community, while staying in the numbers of allocated hours.