MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.

Slides:



Advertisements
Similar presentations
MOM Report October 9- Now Linda R. Coney UCR. October 15 th Running Target Target Beamline Magnets Beamline Magnets Detectors? Detectors? Could not turn.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
MOM report 23/9 – 28/9 G.CECCHET. MOM report Hall PPS commissioning Target tests last night MOM laptop.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory MICO March 16, 2009.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 23, 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MOM’s report from G.CECCHET (abridged). MOM’s report First half of November we had normal operations with some data taking for Marco, Yordan, Maurizio.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
MOM Report. Shield Wall – Gone Before During After 2.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
MICE MICO September ‘07 Chris Nelson. Beamline and Hall Shielded area virtually complete –SW corner –Replacement West wall concrete ordered, corner pieces.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
MOM Commissioning Requests [Ken mail ] Target: - Timing - Turn-key system for target operation Beam counters: - Remove BC1 - Readout BC2 Electronics: -
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
MOM Report Victoria Blackmore VC /06/11 1/7.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference May 7, 2009.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.
S A Griffiths CM42 June 2015 Electrical & Control.
Target Installation Plan
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
MICE PM Report Progress with the Infrastructure A few problems
November technical stop activities:
Presentation transcript:

MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009

April 27, 2009Commissioning Needs-Soler2 Commissioning Needs After successful powering up of decay solenoid on 24/04/09, we had a set-back: —Decay solenoid chiller fan burnt out morning 28/04/09 —Burning smell detected —Linde fridge now turned off —Mike Courthold contacted Linde: fan sent by Linde (expected in UK on 5/05/09 but will arrive RAL later this week) —Local team to install fan once it arrives this week. —Solenoid has been warming up all week Plans are being put together to fit a header tank for the demineralised water for the Linde DS chiller Upstream Decay Solenoid shielding reinstated. Decay Solenoid Area is off-limits until new radiation survey carried out during beam (scheduled for today 11am?) – no beam at moment, probably this Friday

April 27, 2009Commissioning Needs-Soler3 Commissioning Needs Working target – Stands.. —one in R78 for demo —one in ISIS for data Detectors – —Tracker cryostats o On 28/04/09 (afternoon) fuse for tracker readout system chiller blew. o Fortunately, Malcolm present and a replacement fuse was found. o Temperature went up to 45K in a few hours but after fuse replaced went back down to normal (~6K) by 19:30. o Craig to reinstall alarm systems this week. —CKOV o Still need network connection in the DSA for new temp and humidity sensors. o Spare HV power supply that failed (faulty chip) has been taken to Geneva for repair Air conditioning —Ducting for A/C venting progressing well Daresbury Lab team carrying out electrical work on main distribution boards. All power to magnet chillers isolated so cannot turn on magnets until this work finished by the end of this week North baseplate grouted last week. Intermediate side plate due 7th May Dates for cleaning and decorating MICE Hall: 29 May-3 July. Need to protect all equipment with fire-resistant polyethylene.

April 27, 2009Commissioning Needs-Soler4 Issues Documentation inventory/overhaul - ongoing —Instructions for shifters – old documentation needs updating —Safety – need all relevant documents in one obvious place Computing —Need network connections to progress in Hall —Still cannot print on OKI printer in R76 but solution found with Kevin Dunford (cost £150) —Wiring for wireless in R76 installed but still not available. —Need Windows PC in MLCR – still pending —Need connection to GRID from MLCR – pending Need beamline magnets on to test alarm handler —Since chillers disconnected this week, water cannot be restored to magnets until next week —Pierrick Hanlet at RAL from 26 May: will test alarms then. Ray Gamet took over as MOM on 2 May