Management Tools Chapter 17

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Agenda For Today! Professional Learning Communities (Self Audit) Professional Learning Communities (Self Audit) School Improvement Snapshot School Improvement.
Tools and Techniques for Total Quality
Steps of a Design Brief V Design Brief  Problem, identification, and definition Establish a clear idea of what is to be accomplished. Identify.
Lumberton High School Sci Vis I V105.02
East Central Regional Hospital
Eight Basic Quality Improvement Tools – Part 2 Quality Engineering and Quality Management 1 © University of Wisconsin-Madison.
Definition of problem Unintended and unsatisfactory situations (something going wrong) Some deviation from the expected standard which prevent the achievement.
Basic Seven Tools of Quality
Seven Quality Tools The Seven Tools
Basic Problem Solving Tools Mark Pitman. Contents Topics/issues to be covered include: 1.Brainstorming 2.Cause and Effect diagrams 3.Pareto Charts 2.
Steps of a Design Brief V Obtained from workshop-July, 2014-in Guildford County.
Problem Solving Tools Prepared by Steven Schafer, September 16, 2009.
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Problem Solving Tools INSY 3021 Auburn University Spring 2008.
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
Management Tools Problem Solving Chapter 17 Doug Winter, Christy Blew, Anh Le, Jennifer Stoltz.
Chapter 10 Quality Improvement.
Chapter 10 The Tools of Quality.
Project Management March 9, 2001 Dr. Richard Chung Dept. Chemical & Materials Engineering San Jose State University.
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
Chapter 2 Basic Tools for Improving Quality. 7 Basic Tools by Ishikawa Histogram Pareto chart Scatter plot Control chart Cheek sheet Cause-and-effect.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Overview of DMAIC A Systematic Framework for Problem Solving
The Importance and Value of Process Improvement. Rationale for Process Improvement Establishing an attitude and culture of quality improvement and continuous.
Quality Control Chapter 12- Management and Planning Tools
IMPROVEMENT TOOLS Mahendrawathi ER, Ph.D. Outline  Classification of improvement tools  Purpose of the tools  Extent of change  Time and resource.
Tools for Process Improvement
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
SUBJECT  Industrial facility design. GROUP MEMBERS H.Hammad Ali 11-IE-32 S.Hammad shah 11-IE-21 Hammad Hassan 11-IE-41.
Client Logo LEAN ENTERPRISE Implementation Workshop.
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Tools and Techniques for Performance Excellence
Quality Function Deployment
CQI (TQM) Tools and Time Management. CQI or TQM?? u CQI – Continuous Quality Improvement or u TQM – Total Quality Management Technically, there are some.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Management and Planning Tools
ENGM 620: Quality Management
/ 241 An Workshop Wonca Europe, September 2008, Istanbul Basic Tools of Quality Dr. Zekeriya Aktürk, Dr. Nezih Dağdeviren, Dr. Turan Set
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
ENGM 620: New Magnificent 7 New Magnificent 7– 16 October 2010 Quality Tools –Ishikawa’s Basic Seven –The New Seven –Bonus Tools.
Steps of a Design Brief V  Is a Plan of work A written step-by- step process by which the goal is to be accomplished The plan can include expected.
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
Improvement Tools Interactive Lecture Tools Offer Assistance Understand the current state of a process Determine whether the process is in control Find.
Seven New Management and Planning Tools Reporter: Student no. 7.
Problem Solving Skills
Traditional Economic Model of Quality of Conformance
Seven Old Tools of Quality Management
Root Cause Analysis Analyze Kaizen Facilitation. Objectives Learn and be able to apply a fishbone diagram Utilize “Why” analysis technique to uncover.
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Nominal Group Process (NGP) A well researched technique (Delbecq et al., 1986) that is effective in facilitating a group to come to the best combined judgements.
Steps of a Design Brief V Purpose of a Design Brief  A design brief is the process used to solve problems or complete presentations.  It is very.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
IMPROVEMENT TOOLS Mahendrawathi ER, Ph.D.
QUALITY CONTROL CHAPTER 8.
Quality Function Deployment
Quick Overview The Seven Tools
Management & Planning Tools
GE 6757 TOTAL QUALITY MANAGEMENT
Assignment Name:-Planning Tools Submit To:- Sir Fahad Maqbool Submit By:-Zunera Latif Roll No: (1.5 year) Registration No:-2017-GCUF- Government.
CQE Handbook 3rd edition Ch. 27 Quality Control Tools
Project Theory and Application
Seven Quality Tools The Seven Tools
Facilities Planning and Design Course code:
Summer Training Industrial Engineering Department
New Quality Tools Douglas M. Stewart, Ph.D.
Chapter 10 Quality Improvement.
Seven Quality Tools The Seven Tools
Presentation transcript:

Management Tools Chapter 17 Ahmed Almehairbi Zee Davis Chris Schug Torre Walls

Management & Planning Tools Why Why?? Forced Field Analysis Nominal Group Technique

Why Why Tool Very simple and effective tool. Example Very simple and effective tool. Focuses on the process rather than on people. Quick method to solve problems. Why did we miss the deadline ? The machine broke. Why did the machine broke? The machine never had maintenance. Why? The maintenance record is missing

Forced Field Analysis What it does? How to use it: Define the objective Determine criteria/problem Brainstorm forces Prioritize forces Take action

Forced Field Analysis - +

Nominal Group Technique Developed in 1971 Consensus planning tool Used for: Identifying major strengths Equal opportunity/voice Increase participation Reduce errors Simple Process: Generate written ideas “individually”. List ideas on chart. Rank all the ideas on paper “individually”. Rank Most important

Nominal Group Technique Diagram Start In turn, each participant provides a response which is noted on flipchart Select Session Participants Present and Discuss Topic Participants Write Responses Have all responses been noted? No Yes

Management & Planning Tools Affinity Diagram Interrelationship Digraph Tree Diagram Matrix Diagram Prioritization Matrices Process Decision Program Chart Activity Network Diagram

Affinity Diagram What it does? When to use? Benefits of using The Process State the issue Brainstorm and post Sort ideas Create headings

What are the issues involved in missing shipping dates Affinity Diagram What are the issues involved in missing shipping dates Not enough fork trucks Insufficient training Engineering changes Overcrowded dock Shipping turnover No place for returns Teams not used Computer crashes Error on bill of lading Inexperienced supervisors

Affinity Diagram What are the issues involved in missing shipping dates Facilities People System Overcrowded dock Insufficient training Computer crashes No place for returns Engineering changes Teams not used Not enough fork trucks Shipping turnover Errors on bill of lading Inexperienced supervisors

Affinity Diagram Example

Interrelationship Digraph Clarifies interrelationship of many factors Classifies cause-and-effect relationships

The Process: Agree on the issue or question Add a symbol to the diagram Put ideas in a circle Compare elements to others Use arrows Draw arrows from element of influence Review and revise Determine root causes or drivers

Interrelationship Diagram Lack of respect for others Unnecessary packaging Lack of awareness of impact Lack of parental examples Inadequate penalties Outcome Not enough receptacles

Questions Comments

Tree Diagram Used to reduce encourage team members to think creatively, make large projects manageable and generates a problem-solving atmosphere. The Process: Choose action-oriented objective statement from “ interrelationship diagram, brainstorming or team mission statement”. Choose the major headings. Analyze the major headings. For each task node, think of the sub-tasks that will be required, and add them to the tree.

Tree Diagram Go on-line Create simple input system Provide documentation Create a workable process Do local evaluation Streamline evaluation MGMT evaluation Increase workplace suggestions Approval Quick implementation Monitor monthly Create capability Provide information Supply cost data

Matrix Diagram Used to identify, analyze and rate the relationship among two or more variables. Select factors. Select appropriate format. Define symbols. Analyze each cell by inserting the appropriate symbol.

Matrix Diagram Use Tool Tool Creativity Analysis Consensus Action Affinity Diagram Interrelationship Tree Diagram Prioritisation Matrix Diagram PDPC Activity network Always Frequently Occasionally

Prioritization Matrix What it does? When to use it: Broad objectives must be broken down All of the implementation options must be explored Assignable tasks must be created

Prioritization Matrix

Process Decision Program Chart (PDPC) What it does? When to use it: The task is new, unique The task is complex The implementation must keep to a tight schedule There are problems with a reasonable chance of happening

PDPC The process decision program chart is a tool for contingency planning. Helps the user to select the best processes to be used to accomplish a desired task Assists in visualizing the alternatives Forward planning Backward planning

Process Decision Program Chart Plan successful conference Registration Presentation Facilities Speakers late Audio fails Too long Have backup have substitute Use timekeeper Use AV person

Activity Network Diagram

Activity Network Diagram What it does? When to use it: The task is a complex one The sub tasks are familiar with know duration The projects is a critical org. target Simultaneous implementation paths must be coordinated There is little margin for error in the actual vs. the estimated time of completion

Activity Network Design Some other versions of this method PERT chart Programme evaluation review technique Arrow Diagram CPM Chart Critical Path Method

Cause & Effect (Fish bone) Quality Control Tools Cause & Effect (Fish bone) Flow Chart Run Chart Control Chart Histogram Pareto Chart

Cause & Effect Diagram A diagram composed of lines and symbols designed to represent a meaningful relationship between an effect and its causes Developed by Dr. Kaoruno Ishikawa and adapted to improving quality by Dr. W. Edwards Often referred to as an Ishikawa diagram or fishbone diagram

Flow Charts A flow chart is a pictorial representation showing all of the steps of a process. A Flowchart is used for: Defining and analyzing processes Building a step-by-step picture of the process for analysis, discussion, or communication purposes Defining, standardizing, or finding areas for improvement in a process

Symbols Used

Run Chart Run chart allows teams to study observed data for trends or patterns over a specified period of time.

Control Chart A statistical control chart is a graphic comparison of process performance data to computed “statistical control limits,” drawn as limit lines on the chart. A statistical tool used to distinguish between process variation resulting from common causes and variation resulting from special causes.

Control Chart Benefits Monitor process variation over time Differentiate between special cause and common cause variation Assess the effectiveness of changes to improve a process Communicate how a process performed during a specific period

Control Chart Types of Control charts Attribute Data Variables Data Data that results from counting the number of occurrences Variables Data Displays values resulting from the measurement of a continuance variable

Control Chart Three types of of charts: X-Bar and R Chart Individual X and Moving Range Chart for variables Data Individual X and Moving Range Chart for Attribute Data

Histogram A histogram is a graphic summary of variation in a set of data Basic data analysis tool for analyzing frequency of occurrence of items provides an easy-to-read picture of the location and variation in a data set.

Pareto Chart Pareto analysis is a ranked comparison of factors related to a quality problem Prioritized bar chart for determining which problem to work on first. Arranging data so that the few vital factors that are causing most of the problems reveal themselves.

Pareto Chart

Creativity Tools Brainwriting 6-3-5 Classic Brainstorming Imaginary Brainstorming Knowledge mapping Morphological Box Picture Associations and Biotechniques Problem Reformulation Purpose Hierarchy TILMAG Word Association and Analogies

QUESTIONS COMMENTS