Managing Capacity and Demand

Slides:



Advertisements
Similar presentations
Chapter 13 Revenue Management (a.k.a. yield management)
Advertisements

McGraw-Hill © 2000 The McGraw-Hill Companies 1 S M S M McGraw-Hill © 2000 The McGraw-Hill Companies Chapter 14 MANAGING DEMAND AND CAPACITY.
Managing Capacity.
Managing Demand and Capacity
Operation Research By Anitha Chandran Chitra.R Radha.R Sudhit Sethi.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
IES 371 Engineering Management Chapter 14: Aggregate Planning
19–1. 19–2 Chapter Nineteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Pricing and Revenue Management in a Supply Chain
Managing Capacity and Demand Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Sales and Capacity Planning
MANAGING DEMAND AND CAPACITY Donna J. Hill, Ph.D. Fall 2000.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management.
Managing Capacity and Demand McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
ISM 270 Service Engineering and Management Lecture 7: Forecasting and Managing Service Capacity.
Managing Capacity and Demand Chapter - 12
Yield/revenue management and a dynamic price model
Yield Management Chapter 9.
POST GRADUATE DIPLOMA IN BUSINESS MANAGEMENT November 2013 Lesson 1.
OPSM 405 Service Management
Airline Revenue Management
Pricing Strategy …critical marketing mix variable actually produces revenue shortest term marketing mix variable relates directly to microeconomics supply.
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Pricing and Revenue Management in a Supply Chain
Strategic Positioning
MKT 346: Marketing of Services Dr. Houston Chapter 9: Balancing Demand Against Productive Capacity.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
© 2007 Pearson Education 15-1 CHAPTER 15 PRICING AND REVENUE MANAGEMENT IN THE SUPPLY CHAIN Supply Chain Management (3rd Edition)
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
ISM 270 Service Engineering and Management Lecture 7: Forecasting and Managing Service Capacity.
1 Chapter 14 Managing Capacity and Demand 1 Chapter 14 MANAGING CAPACITY AND DEMAND McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights.
Chapter 11 Managing Capacity and Demand
Managing Demand and Capacity
Service and Relationship Marketing Module:3 Chapter 9- Managing Capacity and Demand.
Slide 1 Revenue Management Appendix 10A Revenue Management is the problem of the disappearing inventory. Managers must be flexible to change their predicted.
How Hotels Count and Measure
DO NOT COPY Chapter 10 Capacity Management in service operations.
“MANAGING DEMAND & CAPACITY AND WAITING LINE STRATEGIES”
Balancing Demand and Capacity
Managing Supply and Demand. Strategies for Matching Supply and Demand for Services DEMAND STRATEGIES Partitioning demand Developing complementary services.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
Managing Capacity and Demand. Airlines miss out on revenue if the seats are not filled. The railways lose money if trains have empty seats. Similarly,
Chapter 9: Balancing Demand and Productive Capacity.
MANAGING DEMAND AND CAPACITY. Capacity is usually constant whereas demand usually fluctuates. Fluctuations could be due to various reasons, predictable.
Copyright ©2016 Cengage Learning. All Rights Reserved
Managing Service operation. Strategies for Matching Capacity and Demand for Services MANAGING DEMAND Partitioning demand Developing complementary services.
Review of the Previous Lecture Business Fixed Investment –Stock Market and Tobin’s q –Financing Constraints Residential Investment.
 Capacity Management seeks to improve organizational effectiveness by increasing operational efficiency and reducing patient congestion.  To include.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
McGraw-Hill/Irwin ©2003. The McGraw-Hill Companies. All Rights Reserved Chapter 14 Managing Demand and Capacity The Underlying Issue: Lack of Inventory.
MANAGING DEMAND AND CAPACITY Chapter 15. Objectives Explain the underlying issue for capacity-constrained services: lack of inventory capability Present.
Chapter 3 Lect 6 Forecasting. Seasonality – Repetition at Fixed Intervals Seasonal variations –Regularly repeating movements in series values that can.
Chapter 12 With Woodruff Modification Sales and Operations Planning – Aggregate Planning Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights.
Managing Demand and Supply A Service Perspective.
CH 12 Managing Capacity and Demand
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
Chapter 11 Managing Capacity and Demand
Managing Capacity and Demand
Beni Asllani University of Tennessee at Chattanooga
Chapter 9: Balancing Demand and Productive Capacity.
Chapter 9: Balancing Demand and Productive Capacity.
Balancing Demand and Capacity
Aggregate Production Planning (APP)
Presentation transcript:

Managing Capacity and Demand

Learning Objectives Describe the strategies for matching capacity and demand for services. Recommend an overbooking strategy. Use Linear Programming to prepare a weekly workshift schedule. Prepare a work schedule for part-time employees. Use yield management.

Strategies for Matching Supply and Demand for Services Partitioning demand Increasing customer participation Developing complementary services Sharing capacity Establishing price incentives Scheduling work shifts Cross- training employees Developing reservation systems Creating adjustable capacity Promoting off-peak demand Using part-time employees Yield management

Segmenting Demand at a Health Clinic Smoothing Demand by Appointment Scheduling Day Appointments Monday 84 Tuesday 89 Wednesday 124 Thursday 129 Friday 114

Discriminatory Pricing for Camping Experience No. of Daily type Days and weeks of camping season days fee 1 Saturdays and Sundays of weeks 10 to 15, plus 14 $6.00 Dominion Day and civic holidays 2 Saturdays and Sundays of weeks 3 to 9 and 15 to 19, 23 2.50 plus Victoria Day 3 Fridays of weeks 3 to 15, plus all other days of weeks 43 0.50 9 to 15 that are not in experience type 1 or 2 4 Rest of camping season 78 free EXISTING REVENUE VS PROJECTED REVENUE FROM DISCRIMINATORY PRICING Existing flat fee of $2.50 Discriminatory fee Experience Campsites Campsites type occupied Revenue occupied (est.) Revenue 1 5.891 $14,727 5,000 $30,000 2 8,978 22,445 8,500 21,250 3 6,129 15,322 15,500 7.750 4 4,979 12,447 …. …. Total 25,977 $ 64,941 29,000 $59,000

Hotel Overbooking Loss Table Number of Reservations Overbooked No- Prob- shows ability 0 1 2 3 4 5 6 7 8 9 0 .07 0 100 200 300 400 500 600 700 800 900 1 .19 40 0 100 200 300 400 500 600 700 800 2 .22 80 40 0 100 200 300 400 500 600 700 3 .16 120 80 40 0 100 200 300 400 500 600 4 .12 160 120 80 40 0 100 200 300 400 500 5 .10 200 160 120 80 40 0 100 200 300 400 6 .07 240 200 160 120 80 40 0 100 200 300 7 .04 280 240 200 160 120 80 40 0 100 200 8 .02 320 280 240 200 160 120 80 40 0 100 9 .01 360 320 280 240 200 160 120 80 40 0 Expected loss, $ 121.60 91.40 87.80 115.00 164.60 231.00 311.40 401.60 497.40 560.00

Daily Scheduling of Telephone Operator Workshifts Topline profile Scheduler program assigns tours so that the number of operators present each half hour adds up to the number required Tour 12 2 4 6 8 10 12 2 4 6 8 10 12 12 2 4 6 8 10 12 2 4 6 8 10 12

LP Model for Weekly Workshift Schedule with Two Days-off Constraint Schedule matrix, x = day off Operator Su M Tu W Th F Sa 1 x x … … … … ... 2 … x x … … … … 3 … ... x x … … … 4 … ... x x … … … 5 … … … … x x … 6 … … … … x x … 7 … … … … x x … 8 x … … … … … x Total 6 6 5 6 5 5 7 Required 3 6 5 6 5 5 5 Excess 3 0 0 0 0 0 2

Scheduling Part-time Bank Tellers Decreasing part-time teller demand histogram Tellers required 5 4 4 0 1 2 3 4 5 6 7 Tellers required 3 3 0 1 2 3 4 5 2 2 1 Two Full-time Tellers 1 1 5 2 Fri. Mon. Wed. Thurs Tues. Mon. Tues. Wed. Thurs. Fri. DAILY PART-TIME WORK SCHEDULE, X=workday Teller Mon. Tues. Wed. Thurs. Fri. 1 x …. x …. x 2 x …. …. x x 3,4 x …. …. …. x 5 …. …. x …. x

Ideal Characteristics for Yield Management Relatively Fixed Capacity Ability to Segment Markets Perishable Inventory Product Sold in Advance Fluctuating Demand Low Marginal Sales Cost and High Capacity Change Cost

Seasonal Allocation of Rooms by Service Class for Resort Hotel First class Standard Budget 20% 20% 20% 30% 50% 30% 50% 60% Percentage of capacity allocated to different service classes 50% 30% 30% 10% Peak Shoulder Off-peak Shoulder (30%) (20%) (40%) (10%) Summer Fall Winter Spring Percentage of capacity allocated to different seasons

Demand Control Chart for a Hotel Expected Reservation Accumulation 2 standard deviation control limits

Yield Management Using the Critical Fractile Model Where x = seats reserved for full-fare passengers d = demand for full-fare tickets p = proportion of economizing (discount) passengers Cu = lost revenue associated with reserving one too few seats at full fare (underestimating demand). The lost opportunity is the difference between the fares (F-D) assuming a passenger, willing to pay full-fare (F), purchased a seat at the discount (D) price. Co = cost of reserving one to many seats for sale at full-fare (overestimating demand). Assume the empty full-fare seat would have been sold at the discount price. However, Co takes on two values, depending on the buying behavior of the passenger who would have purchased the seat if not reserved for full-fare. if an economizing passenger if a full fare passenger (marginal gain) Expected value of Co = pD-(1-p)(F-D) = pF - (F-D)

Topics for Discussion What organizational problems can arise from the use of part-time employees? How can computer-based reservation systems increase service capacity utilization? What possible dangers are associated with developing complementary services? Will the widespread use of yield management eventually erode the concept of fixed prices? What possible negative effects can yield management have on customer relations?

Interactive Exercise Watch the PowerPoint presentation concerning the overbooking experience at the Doubletree Hotel in Houston, Texas. How could this situation been handled differently?