1 Copyright 1996 by The McGraw-Hill Companies, Inc WHAT DISCOUNT RATE SHOULD THE FIRM USE IN CAPITAL BUDGETING?  MANY FIRMS USE OVERALL FIRM COST OF CAPITAL.

Slides:



Advertisements
Similar presentations
Lecture-1 Financial Decision Making and the Law of one Price
Advertisements

Cost of Capital Chapter 13.
Capital Budgeting. Cash Investment opportunity (real asset) FirmShareholder Investment opportunities (financial assets) InvestPay dividend to shareholders.
The Capital Budgeting Decision (Chapter 12)  Capital Budgeting: An Overview  Estimating Incremental Cash Flows  Payback Period  Net Present Value 
Key Concepts and Skills
Session 7 Topics to be covered: Capital Budgeting 101
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
Where Do We Stand? Earlier chapters on capital budgeting focused on the appropriate size and timing of cash flows. This chapter discusses the appropriate.
1 Risk, Return, and Capital Budgeting Chapter 12.
Chapter – 5 & 6: NPV & Other Investment Rules, Cash flows
A Project Is Not a Black Box Chapter 10. Topics Covered  Sensitivity Analysis  Break Even Analysis  Monte Carlo Simulation  Decision Trees.
The McGraw-Hill Companies, Inc., 2000
4. Project Investment Decision-Making
Chapter 10 Project Analysis
Capital Budgeting & Risk Invest in highest NPV project Need Discount rate to get NPV.
Last Study Topics Company and Project Costs of Capital Beta As a Proxy.
CAPM and the capital budgeting
Corporate Finance Lecture 6.
Risk, Return and Capital Budgeting For 9.220, Term 1, 2002/03 02_Lecture15.ppt Student Version.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved CHAPTER 12 Risk, Cost of Capital, and Capital Budgeting.
Estimating Hurdle Rates. Cost of Capital To evaluate project, need estimates of cashflows, and also estimate of an appropriate hurdle rate (r). Hurdle.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Cost of Capital Chapter Fourteen.
 Capital Budgeting and Risk Principles of Corporate Finance Brealey and Myers Sixth Edition Slides by Matthew Will Chapter 9 © The McGraw-Hill Companies,
Chapter 12 – MBA5041 Cost of Capital Cost of Equity Capital Estimation of Beta Determinants of Beta Extensions of the Basic Model Estimating International.
QDai for FEUNL Finanças November 7. QDai for FEUNL Topics covered  CAPM for cost of capital  Estimation of beta.
Chapter 9 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Semih Yildirim ADMS Chapter 11 Risk, Return and Capital Budgeting Chapter Outline  Measuring Market Risk  The Beta of an Asset  Risk and Return.
Introduction to Risk and Return
Valuation and levered Betas
Steve Paulone Facilitator Sources of capital  Two basic sources – stocks (equity – both common and preferred) and debt (loans or bonds)  Capital buys.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
Risk, Cost of Capital, and Capital Budgeting Chapter 13 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 7 Project Cash Flows and Risk © 2005 Thomson/South-Western.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 0 Chapter 9 Making Capital Investment Decisions.
Risk, Return, and Capital Budgeting (Chapter 12) Financial Policy and Planning (MB 29)
Cost of capital. What types of long-term capital do firms use? Long-term debt Preferred stock Common equity Term loans Retained earnings.
CAPITAL BUDGETING INITIAL INVESTMENT PLANNING HORIZON TERMINAL VALUE REQUIRED RATE OF RETURN NET CASH FLOWS.
1 Today Discount rates Using the CAPM Estimating beta and the cost of capital Reading Brealey and Myers, Chapter 9.
McGraw-Hill/IrwinCopyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Risk, Cost of Capital, and Capital Budgeting Chapter 12.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
Chapter 10 Principles of Corporate Finance Eighth Edition A Project is Not A Black Box Slides by Matthew Will Copyright © 2006 by The McGraw-Hill Companies,
CORPORATE FINANCE III ESCP-EAP - European Executive MBA 24 Nov a.m. London Project Appraisal-Dealing with uncertainty I. Ertürk Senior Fellow in.
 Introduction to Risk, Return, and the Opportunity Cost of Capital Principles of Corporate Finance Brealey and Myers Sixth Edition Slides by Matthew Will.
A Project Is Not a Black Box Principles of Corporate Finance Sixth Edition Richard A. Brealey Stewart C. Myers Lu Yurong Chapter 10 McGraw Hill/Irwin.
McGraw-Hill/Irwin Corporate Finance, 7/e © 2005 The McGraw-Hill Companies, Inc. All Rights Reserved CHAPTER 12 Risk, Cost of Capital, and Capital.
Financial Management Unit – 2 Cost of Capital and Leverages.
FIN 819: lecture 4 Risk, Returns, CAPM and the Cost of Capital Where does the discount rate come from?
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
Finance Chapter 11 Cash flow estimation & risk analysis.
Chapter 11 Principles PrinciplesofCorporateFinance Ninth Edition Project Analysis Slides by Matthew Will Copyright © 2008 by The McGraw-Hill Companies,
10 Project analysis McGraw-Hill/Irwin
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
Slide 1 Cost of Capital, and Capital Budgeting Text: Chapter 12.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Cost of Capital.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Chapter 14 Cost of Capital McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin Cost of Capital Cost of Capital - The return the firm’s.
Lecture 9 Capital Budgeting and Risk Managerial Finance FINA 6335 Ronald F. Singer.
© The McGraw-Hill Companies, Inc., 2000 Irwin/McGraw Hill 7- 1 B Class #3  BM6 chapters 7, 8, 9  Based on slides created by Matthew Will  Modified.
Copyright © 2003 McGraw Hill Ryerson Limited 10-1 prepared by: Carol Edwards BA, MBA, CFA Instructor, Finance British Columbia Institute of Technology.
Investment Analysis Lecture: 13 Course Code: MBF702.
FIA Technical Workshop March 2015 Prepared by Yih Pin Tang.
F9 Financial Management. 2 Designed to give you the knowledge and application of: Section F: Estimating the cost of equity F1. Sources of finance and.
Chapter 9 Principles of Corporate Finance Eighth Edition Capital Budgeting and Risk Slides by Matthew Will, adopted by Craig Mayberry Copyright © 2006.
16BA608/FINANCIAL MANAGEMENT
Capital Budgeting Decisions
Cost of Capital Chapter 15 Reem Alnuaim.
Managerial Economics in a Global Economy
The McGraw-Hill Companies, Inc., 2000
Presentation transcript:

1 Copyright 1996 by The McGraw-Hill Companies, Inc WHAT DISCOUNT RATE SHOULD THE FIRM USE IN CAPITAL BUDGETING?  MANY FIRMS USE OVERALL FIRM COST OF CAPITAL TO DISCOUNT CASH FLOWS FOR ALL NEW PROJECTS  WRONG IF NEW PROJECT MORE OR LESS RISKY THAN ITS EXISTING BUSINESS  EACH PROJECT SHOULD IN PRINCIPLE BE DISCOUNTED USING ITS OWN OPPORTUNITY COST OF CAPITAL

2 Copyright 1996 by The McGraw-Hill Companies, Inc COMPANY COST OF CAPITAL AND REQUIRED RETURN ON PROJECT REQUIRED RETURN PROJECT BETA Company cost of capital required return on project Security market line showing Average beta of firm's assets

3 Copyright 1996 by The McGraw-Hill Companies, Inc COMPANY COST OF CAPITAL RULE  DUKE POWER HAS LOW RISK AND LOW COMPANY COST OF CAPITAL  MICROSOFT HAS HIGH RISK AND HIGH COMPANY COST OF CAPITAL  IF BOTH FIRMS USED THE COMPANY COST OF CAPITAL RULE TO EVALUATE THE SAME PROJECT, POSSIBLE THAT – DUKE POWER WOULD ACCEPT THE PROJECT – MICROSOFT WOULD REJECT THE PROJECT  WRONG!!

4 Copyright 1996 by The McGraw-Hill Companies, Inc COMPANY COST OF CAPITAL RULE  WIDESPREAD USE OF A UNIFORM COST OF CAPITAL BY MANY COMPANIES IN EVALUATING PROJECTS  BUT MANY FIRMS DO REQUIRE DIFFERENT RETURNS FOR DIFFERENT CATEGORIES OF INVESTMENT – EXAMPLE ON NEXT SLIDE

5 Copyright 1996 by The McGraw-Hill Companies, Inc CATEGORY DISCOUNT RATE SPECULATIVE VENTURES 30% NEW PRODUCTS 20% EXPANSION OF 15% ( company cost of capital ) EXISTING BUSINESS COST IMPROVEMENT 10% KNOWN TECHNOLOGY

6 Copyright 1996 by The McGraw-Hill Companies, Inc USING CAPM AND PROJECT  MANY LARGE CORPORATIONS USE CAPM AND AN ESTIMATE OF THE PROJECT  TO ESTIMATE PROJECT DISCOUNT RATE EXPECTED PROJECT RETURN = r f +  project ( r m - r f )

7 Copyright 1996 by The McGraw-Hill Companies, Inc BEGIN WITH PROBLEMS IN MEASURING COMPANY    IS DIFFICULT TO MEASURE FOR INDIVIDUAL FIRM  BETTER ACCURACY BY LOOKING AT AVERAGE OF SIMILAR COMPANIES – BUT FIRM’S BORROWING POLICIES AFFECTS ITS STOCK  – IBM AND DEC ARE NOT SIMILAR COMPANIES FOR PURPOSE OF ESTIMATING  BECAUSE THEY USE DIFFERENT DEGREES OF LEVERAGE

8 Copyright 1996 by The McGraw-Hill Companies, Inc MEASURING COMPANY   APPROPRIATE FOR ACROSS-THE-BOARD EXPANSION  COMPARE RETURN ON STOCK WITH MARKET RETURN OVER 60-MONTH TIME PERIOD – AT&T – HEWLETT-PACKARD  SLOPE IS   VARIES BY PERIOD  ESTIMATES OF  ARE PUBLISHED BY BROKERAGE HOUSES AND ADVISORY SERVICES

9 Copyright 1996 by The McGraw-Hill Companies, Inc ESTIMATING BETA RETURN ON SHARE RETURN ON MARKET + Beta = RETURN ON SHARE RETURN ON MARKET + Beta =

10 Copyright 1996 by The McGraw-Hill Companies, Inc PFIZER  WHICH IS THE BETTER ESTIMATE OF  FOR PFIZER? – PFIZER HAS A  OF 1.02 WITH A STANDARD ERROR OF 0.14 – A MARKET VALUE-WEIGHTED INDUSTRY PORTFOLIO OF LARGE PHARMACEUTICAL COMPANIES HAS A  OF 0.98 WITH A STANDARD ERROR OF 0.07  DIFFERENCE BETWEEN ESTIMATE OF COMPANY BETA AND INDUSTRY BETA IS PROBABLY NOISE – UNLESS YOU HAVE REASON TO BELIEVE THAT PFIZER IS RISKIER THAN INDUSTRY AVERAGE

11 Copyright 1996 by The McGraw-Hill Companies, Inc HOW CAPITAL STRUCTURE AFFECTS EXPECTED RETURNS  IF YOU OWN ALL OF THE EQUITY AND ALL OF THE DEBT OF A COMPANY, YOU WOULD ALSO RECEIVE ALL CASH FLOWS FROM THE COMPANY  COMPANY’S COST OF CAPITAL IS EXPECTED RETURN ON THIS PORTFOLIO

12 Copyright 1996 by The McGraw-Hill Companies, Inc HOW CHANGING CAPITAL STRUCTURE AFFECTS   AFTER REFINANCING, RISK OF TOTAL PORTFOLIO OF DEBT AND EQUITY IS UNCHANGED – BUT BOTH DEBT AND EQUITY ARE INDIVIDUALLY LESS RISKY  FIRM’S ASSET BETA IS WEIGHTED AVERAGE OF PORTFOLIO OF DEBT AND EQUITY BETAS

13 Copyright 1996 by The McGraw-Hill Companies, Inc HOW CHANGING CAPITAL STRUCTURE AFFECTS   AFTER REFINANCING, RISK OF TOTAL PORTFOLIO OF DEBT AND EQUITY IS UNCHANGED – BUT BOTH DEBT AND EQUITY ARE INDIVIDUALLY LESS RISKY  FIRM’S ASSET BETA IS WEIGHTED AVERAGE OF PORTFOLIO OF DEBT AND EQUITY BETAS  SUPPOSE  debt FALLS TO.1.8 = (.3 X.1) + (.7 X  equity )  equity = 1.1

14 Copyright 1996 by The McGraw-Hill Companies, Inc UNLEVERING BETAS  GOING FROM AN OBSERVED  equity TO  assets  WE KNOW  equity  debt MARKET WEIGHTS OF DEBT AND EQUITY, (D/V )AND (E/V)

15 Copyright 1996 by The McGraw-Hill Companies, Inc UNLEVERING BETAS  GOING FROM AN OBSERVED  equity TO  assets  WE KNOW  equity  debt MARKET WEIGHTS OF DEBT AND EQUITY, (D/V )AND (E/V)  WE WILL ADD TAX EFFECTS LATER

16 Copyright 1996 by The McGraw-Hill Companies, Inc REVIEW  COST OF CAPITAL IS RELEVANT IN CAPITAL BUDGETING DECISIONS – NOT EXPECTED RETURN ON COMMON STOCK  COMPANY COST OF CAPITAL IS WEIGHTED AVERAGE RETURN THAT INVESTORS EXPECT ON FIRM’S DEBT AND EQUITY – RELATED TO FIRM’S ASSET BETA, NOT TO EQUITY BETA  ASSET BETA CALCULATED AS WEIGHTED AVERAGE OF BETAS OF DEBT AND EQUITY  WHEN FIRM CHANGES ITS CAPITAL STRUCTURE – RISK AND EXPECTED RETURNS OF DEBT AND EQUITY CHANGE – ASSET BETA AND COMPANY COST OF CAPITAL DO NOT CHANGE

17 Copyright 1996 by The McGraw-Hill Companies, Inc WHAT DETERMINES ASSET BETAS?  FIRMS WITH HIGH ACCOUNTING OR CASH FLOW BETAS ALSO TEND TO HAVE HIGH STOCK BETAS – CYCLICAL FIRMS WHOSE EARNINGS ARE STRONGLY RELATED TO THE BUSINESS CYCLE TEND TO BE HIGH BETA FIRMS  DEMAND A HIGHER RATE OF RETURN FROM SECURITIES WHOSE PERFORMANCE MOVES WITH THE ECONOMY

18 Copyright 1996 by The McGraw-Hill Companies, Inc OPERATING LEVERAGE  WE KNOW FINANCIAL LEVERAGE INCREASES BETA  FOR SIMILAR REASONS, OPERATING LEVERAGE ALSO INCREASES BETA – PRESENCE OF FIXED COSTS OF PRODUCTION  CASH FLOWS FROM THE ASSET = REVENUES - FIXED COST - VARIABLE COST  PV(CASH FLOWS FROM THE ASSET) = PV(ASSET) =PV(REVENUE) - PV(FIXED COST) - PV(VARIABLE COST)  PV(REVENUE) =PV(FIXED COST) + PV(VARIABLE COST) + PV(ASSET)

19 Copyright 1996 by The McGraw-Hill Companies, Inc OPERATING LEVERAGE   FIXED COST = 0  ALSO  REVENUES  VARIABLE COST – AS THEY ARE BOTH PROPORTIONAL TO OUTPUT

20 Copyright 1996 by The McGraw-Hill Companies, Inc NET PRESENT VALUE RULE  WHY DOES THE NPV OF A PROJECT SHOW UP AS INCREASE IN MARKET VALUE?  IMAGINE THE CASH FLOWS OF THE PROJECT ARE PAID OUT AS DIVIDENDS  THE SHARE PRICE WOULD INCREASE BY THE PRESENT VALUE OF THE DIVIDENDS LESS THE COST OF THE PROJECT (DIVIDENDS FOREGONE) THIS IS THE NPV OF THE PROJECT

21 Copyright 1996 by The McGraw-Hill Companies, Inc INTERNAL RATE OF RETURN, IRR NPV = IRR IS THE DISCOUNT RATE FOR WHICH NPV=0

22 Copyright 1996 by The McGraw-Hill Companies, Inc CALCULATING IRR  FINANCIAL CALCULATOR.  TRIAL AND ERROR – EXAMPLE: C 0 = - 4,000 C 1 = +2,000 C 3 = +4,000 TRY IRR = 0, NPV = +2,000, IRR > 0 TRY IRR = 50%, NPV = - 889, IRR < 50 TRY IRR = 25%, NPV = +160, IRR >25 TRY IRR = 28%, NPV = 0

23 Copyright 1996 by The McGraw-Hill Companies, Inc IRR = 28% DISCOUNT RATE (%) NPV NET PRESENT VALUE PROFILE C 0 = - 4 C 1 = +2 C 3 = +4

24 Copyright 1996 by The McGraw-Hill Companies, Inc INTERNAL RATE OF RETURN RULE ACCEPT PROJECT IF IRR IS GREATER THAN THE OPPORTUNITY COST OF CAPITAL LOOKING AT THE NET PRESENT VALUE PROFILE FOR A CONVENTIONAL PROJECT, WE WILL BE ACCEPTING PROJECTS WITH POSITIVE NPV

25 Copyright 1996 by The McGraw-Hill Companies, Inc CONVENTIONAL PROJECT  CASH OUTFLOWS FOLLOWED BY CASH INFLOWS  NPV DECLINES WITH INCREASING DISCOUNT RATES

26 Copyright 1996 by The McGraw-Hill Companies, Inc WARNING  DISTINGUISH BETWEEN IRR AND OPPORTUNITY COST OF CAPITAL – BOTH APPEAR AS DISCOUNT RATES IN NPV FORMULA.  IRR IS A MEASURE OF PROFITABILITY, DEPENDS ON AMOUNT AND TIMING OF CASH FLOWS  OPPORTUNITY COST OF CAPITAL MEASURES WHAT WE COULD EARN BY INVESTING IN FINANCIAL ASSETS OF SIMILAR RISK – SET BY CAPITAL MARKETS – IT IS A COST OF FINANCING THE PROJECT – IT PROVIDES US WITH A MINIMUM ACCEPTABLE LEVEL OF PROFITABILITY

27 Copyright 1996 by The McGraw-Hill Companies, Inc NPV Year: 0 1 IRR(%) At 10% ($) A -1,000 +1, B +1,000 -1,  BOTH PROJECTS HAVE IRR OF 50%  NPV PROFILE FOR PROJECT B INCREASES WITH INCREASING DISCOUNT RATES  ACCEPT PROJECT B WHEN IRR IS LESS THAN THE OPPORTUNITY COST OF CAPITAL LENDING OR BORROWING?

28 Copyright 1996 by The McGraw-Hill Companies, Inc MULTIPLE RATES OF RETURN  DESCARTES’ RULE OF SIGNS SAYS THERE ARE AS THERE ARE CHANGES IN SIGN – BUT SOME OF THE ROOTS MAY BE THE SAME!  OFTEN HAVE CASH OUTCASH OUTFLOWS FROM INITIAL INVESTMENT, FOLLOWED BY POSITIVE CASH FLOWS DURING PROJECT LIFE, FOLLOWED BY CASH OUTFLOWS AT END OF PROJECT LIFE – DECOMMISSIONING COSTS OF NUCLEAR POWER PLANT – RECLAMATION COSTS AFTER STRIPMINING COAL – DELAY BETWEEN EARNING INCOME AND PAYING TAX

29 Copyright 1996 by The McGraw-Hill Companies, Inc MULTIPLE RATES OF RETURN Year: IRR 10 C % & 400% -1.9  TWO CHANGES IN SIGN OF CASH FLOWS  TWO INTERNAL RATES OF RETURN  r < 25%, NPV < 0

30 Copyright 1996 by The McGraw-Hill Companies, Inc MULTIPLE RATES OF RETURN Year: IRR 10 C % & 400% -1.9  TWO CHANGES IN SIGN OF CASH FLOWS  TWO INTERNAL RATES OF RETURN  r < 25%, NPV < 0  25% 0 ACCEPT PROJECT

31 Copyright 1996 by The McGraw-Hill Companies, Inc IRR MAY GIVE THE WRONG DECISION WITH MUTUALLY EXCLUSIVE PROJECTS WHICH DIFFER IN :  SCALE  PATTERN OF CASH FLOWS OVER TIME – COMPARE PROJECTS G AND H IRR 10% % 3, % 9,000 GHGH

32 Copyright 1996 by The McGraw-Hill Companies, Inc IRR MAY GIVE THE WRONG DECISION WITH MUTUALLY EXCLUSIVE PROJECTS WHICH DIFFER IN :  SCALE  PATTERN OF CASH FLOWS OVER TIME – COMPARE PROJECTS G AND H IRR 10% % 3, % 9, % 6,000  PROJECT H HAS HIGHER NPV THAN PROJECT G – BUT LOWER IRR GHIGHI

33 Copyright 1996 by The McGraw-Hill Companies, Inc H G NPV($) DISCOUNT RATE 6,000

34 Copyright 1996 by The McGraw-Hill Companies, Inc MUTUALLY EXCLUSIVE PROJECTS  PROJECT G HAS IRR OF 33%  PROJECT H HAS IRR OF 20%  NPV G = NPV H AT CROSSOVER POINT OF 15.6%  CASH FLOWS OF PROJECT H ARE LARGER BUT OCCUR LATER – FOR DISCOUNT RATES < 15.6%, PROJECT H HAS HIGHER NPV – FOR DISCOUNT RATES > 15.6%, PROJECT G HAS HIGHER NPV

35 Copyright 1996 by The McGraw-Hill Companies, Inc Real Options

36 Copyright 1996 by The McGraw-Hill Companies, Inc Topics Covered  Sensitivity Analysis  Break Even Analysis  Monte Carlo Simulation  Decision Trees

37 Copyright 1996 by The McGraw-Hill Companies, Inc How To Handle Uncertainty Sensitivity Analysis - Analysis of the effects of changes in sales, costs, etc. on a project. Scenario Analysis - Project analysis given a particular combination of assumptions. Simulation Analysis - Estimation of the probabilities of different possible outcomes. Break Even Analysis - Analysis of the level of sales (or other variable) at which the company breaks even.

38 Copyright 1996 by The McGraw-Hill Companies, Inc Monte Carlo Simulation  Step 1: Modeling the Project  Step 2: Specifying Probabilities  Step 3: Simulate the Cash Flows Modeling Process

39 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) +150(.6) +30(.4) +100(.6) +50(.4) -550 NPV= ? -250 NPV= ? or Turboprop Piston

40 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) +150(.6) +30(.4) +100(.6) +50(.4) -550 NPV= ? -250 NPV= ? or Turboprop Piston

41 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) +150(.6) +30(.4) +100(.6) +50(.4) -550 NPV= ? -250 NPV= ? or Turboprop Piston

42 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) -550 NPV= ? -250 NPV= ? or (.6) +30(.4) +100(.6) +50(.4) * Turboprop Piston

43 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) -550 NPV= ? -250 NPV= ? or (.6) +30(.4) +100(.6) +50(.4) NPV= NPV= NPV= NPV= * Turboprop Piston

44 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) (.6) (.4) +100(.6) (.4) * or NPV= NPV= NPV= NPV= NPV= ? -250 NPV= ? Turboprop Piston

45 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) (.6) (.4) +100(.6) (.4) -550 NPV= NPV= * or NPV= NPV= NPV= NPV= Turboprop Piston

46 Copyright 1996 by The McGraw-Hill Companies, Inc Decision Trees 960 (.8) 220(.2) 930(.4) 140(.6) 800(.8) 100(.2) 410(.8) 180(.2) 220(.4) 100(.6) (.6) (.4) +100(.6) (.4) -550 NPV= NPV= * or NPV= NPV= NPV= NPV= Turboprop Piston