GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
Nightly Releases and Testing Alexander Undrus Atlas SW week, May
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Primary Boot Code (PBC) D. Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectT&C Database Management, 1 July GLAST Large Area Telescope T&C Database Management 1 July 2005 Bryson Lee
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectISOC Peer Review March 2, 2004 GLAST Large Area Telescope ISOC Peer Review Section 4.2 FSW Code Maintenance Tools T. L. Schalk U. C. Santa.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectGLAST Flight Software, 7 February 2003 FSW Development Plan 1 GLAST Large Area Telescope: Instrument Flight Software Development Plan.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Jeff Fisher, FSW Manager Flight Unit Peer Review Overview/Management/Schedule September 16, 2004.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Test Executive Trades (1)
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
EPU load – same as SIU load except…
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
Presentation transcript:

GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller Configuration Manager A. P. Waite S/C Interface D. Wood Calibration J. Swain LAT Configuration J. Swain Software Architectures A. P. Waite Thermal Control M. Monirzad FSW Independent Test-Team Lead M. Huffer Test Executive S. Maldonado Front End Simulators O. Saxton Cmd & Telem Database B. Davis Boot/RAD750 Processor R. Caperoon Test Team Rama, Shanu (tbd) Mission Project Office FSW Management E. Andrews Algorithms J. J. Russell Tools K. Lo Driver Development C. Brune On-line, Test- Scripts R. Claus, S. Tuvi I&T Manager E. Bloom Documentation R. Morin FSW Management Support T. Schalk C&DH A.P. Waite

GLAST LAT Project4.1.7 Dec 15’03 V 2 Software planning (TS me ) Current activity (working on a roadmap) –Reviewing processes, issues, status –Evaluating re-baseline schedule (work in progress) –Establish metrics Insertion of Demos and mini demos as milestones monthly activity –Understand FS & mini tower status wrt FSW usage –Add people

GLAST LAT Project4.1.7 Dec 15’03 V 3 Software planning (TS me ) Major drivers –EM2 (may) Build Integrates with Multiple Towers –ISIS (may) Em2 base + more formal docs; testing; support –Start of FU hardware integration (I&T) july –FU Dec 2004 –FU acceptance Testing Feb 2005 – FU delivered to I&T for Instrument System Testing Establish a CCB for FSW to control potential feature creep (FSW Peer Review (2?)) Navigate the extensive documentation and identify holes QLR response

GLAST LAT Project4.1.7 Dec 15’03 V 4 QLR response / “plan” Requirements –Completeness… control… traceability… tests Mike DeKlotz CCB in place well before ISIS Schedule –Reflect real work load (eg hardware testing) –Reflect real priorities for FU elements –Margins ? –With integrated milestones / demos –Expect updates to PMCS during Jan Metrics –Useful to project –and- team –Resource usage Testing (support & planning) CCB and Reviews (including Jan EM2 peer review) staffing

GLAST LAT Project4.1.7 Dec 15’03 V 5 Organization Status Manpower issues –M. Monirzad ? –Test script writers –ISIS owner ? (remember this is more formal) –New people have a schedule impact both ways Technical status –primary and secondary boot code (pulled next page from QLR) –Code management tools (CMT CMX CVS) upgrades –Housekeeping design progress –Cmd and event server developments –LCB driver testing –Web access to existing docs

GLAST LAT Project4.1.7 Dec 15’03 V 6 Accomplished since CDR (5) Primary boot of RAD750 (from “internal” RAD750 SUROM) –Integrated polled 1553 driver Secondary boot of RAD750 (from “external” SIB EEPROM) SIB EEPROM formatted, file system laid out Performed successful communication test with the Spacecraft Instrument Interface Simulator (SIIS) provided by Spectrum Astro Other tasks such as VxWorks upgrade, etc.

GLAST LAT Project4.1.7 Dec 15’03 V 7 Command & Telemetry Database Three Pieces –Utility to capture & edit the information (python) –The information itself (xml files) –Software to respond to telecommand / generate telemetry (data stmts) Utility –Prototyped a version allowing entry into a ‘neutral’ database Will export in a variety of formats –ITOS –Autogen FSW code tables –Autogen documentation (web and full doc) Test output in ITOS format sent to NRL to try on the SIIS Information –Two extensives documents defining Telecommands/Telemetry for File System / Memory Dumps / Task Status / Memory Usage Critical Housekeeping information Software –Critical Housekeeping gathering/reporting in design phase To Do –Move utility from prototype to production quality code –Implement critical housekeeping code

GLAST LAT Project4.1.7 Dec 15’03 V 8 Near term activities (jan) testing of EM1 Build –TRK/CAL/DAQ configuration –Event Filtering Demonstration of flight crate boot Demonstrate software control of GASU –Configuration –Control and readout Table driven cmd server prototype EM2 event server prototype Housekeeping design & toy version of code

GLAST LAT Project4.1.7 Dec 15’03 V 9 Additional Tasks in next 3 Months Design Internal LAT Software Communication Protocols –Communication task-to-task and CPU-to-CPU Framework (mode control) –What commands can be sent in various modes EM1 packages have been tested, but no formalized reports –EM1 packages were extensively tested before delivery to I&T Detailed Unit testing of EM2 packages (uses EM1 packages) Design Software watchdog Support test-bed effort with software

GLAST LAT Project4.1.7 Dec 15’03 V 10 More short term tasks –Incorporate GASU/PDU/EPU code to complete software for test- bed –SIB thermal control/main power switch driver (minor, just register writes) –Service level software for EBM/AEM to be tested with hardware –Service level software for inter-task communication –Finish/test health/housekeeping code –Applications level software scheduled for EM2/FU –Testing

GLAST LAT Project4.1.7 Dec 15’03 V 11 PMCS next 2 months…

GLAST LAT Project4.1.7 Dec 15’03 V 12 PMCS next 2 months…