1 Lucas-Lehmer Primality Tester Presentation 9 March 29, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.

Slides:



Advertisements
Similar presentations
Programmable FIR Filter Design
Advertisements

Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team M1 Enigma Machine Milestone March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team M1 Enigma Machine Milestone 5 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
1 Lucas-Lehmer Primality Tester Presentation 8 March 22nd 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Lucas-Lehmer Primality Tester Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design Manager: Prateek Goenka.
Virtual Wallet Gates Winkler Yin Shen Jordan Samuel Fei /23/2009 A handheld device that saves time and money through smart budget management and.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 7 MAD MAC th March, 2006 Functional Block.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 22 Overall Project Objective : Dynamic Control.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
1 Lucas-Lehmer Primality Tester Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design Manager: Prateek Goenka.
1 Lucas-Lehmer Primality Tester Presentation 6 March 1st 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
1 Team M1 Enigma Machine Milestone March, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager:
Lucas-Lehmer Primality Tester Presentation 1: Proposal Team: Nathan Stohs Joe Hurley Brian Johnson Marques Johnson.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 5 MAD MAC nd February, 2006 Top Level Integration.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
1 Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Lucas-Lehmer Primality Tester Presentation 2: Architecture Proposal February 1, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 3 MAD MAC th February, 2006 Size estimates/Floor.
1 Team M1 Enigma Machine Milestone April, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
Lucas-Lehmer Primality Tester Presentation 4 February 15, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Team M1 Enigma Machine Adithya Attawar (M1-1) Shilpi Chakrabarti (M1-2) Zaven Gabriel (M1-3) Michael Sokolsky (M1-4) Design Manager: Prateek Goenka Week.
Lucas-Lehmer Primality Tester Presentation 5 February 22, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Camera Auto Focus Presentation 10, April 11 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
1 Lucas-Lehmer Primality Tester Presentation 6 March 1st 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
1 Lucas-Lehmer Primality Tester Presentation 11 April 24th 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Team M1 Enigma Machine Milestone April, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Analog Simulation for ExtractedRC.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
1 Lucas-Lehmer Primality Tester Presentation 8 March 22nd 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Presentation 6, February 28 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Shiven Seth (W2-5) Presentation 1 MAD MAC st February,
1 Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 9 MAD MAC th March, 2006 Functional Block.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Lucas-Lehmer Primality Tester Presentation 2: Architecture Proposal February 1, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
ADPCM Adaptive Differential Pulse Code Modulation
Alpha Blending and Smoothing
Presentation transcript:

1 Lucas-Lehmer Primality Tester Presentation 9 March 29, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques Johnson W4-4 Design Manager: Prateek Goenka Overall Objective: Modular Arithmetic unit with a creative use

2 Status Finished –Project Chosen –C simulations –Behavioral Verilog –Structural Verilog –Floor Plan –Schematics –Pathmill Simulation of Top Level In Progress –Layout –Layout Simulations To Do –More Layout/Simulations

3 Simulation Notes Top Level Schematic Simulation Full run of smallest “interesting” case (p=7) –5 hours on new machines –4 Gb disk space* *now that new machines have /scratch, we can use them. Tests are re-run nightly to preserve sanity.

4 New “low-power” Registers Registers were overdue for an overhaul. Hacked together, very poor performance characteristics. Researched, decided to attempt a low power, or at least cleaner, design. Register layout not begun, best time to change things.

5 Low Power Schematic

6

7 Measured Simulation Characteristics Clk-Q 175ps Rise 115ps Fall 100ps Power: 250 MHz Less than 1% savings. Top level sim results: –Old: uM –New: uM

8 On the other hand… Initial extractedRC came out pretty badly Rise, Fall, Clk-Q all 3x longer. Obviously must handle with care Unless they clean up very very well, stick to a safter, practically-just-as-good conventional design.

9

10

11 More Power To You Other things helped far more –Switched largest multiplexers to n-pass* –Re-wrote several counters, turn off when not in use. –Removed unnecessary checking logic (only relates to cases larger than we can test). Power After Logic Changes: 438.7uM 30% less power. Embarrassingly better. Need to re-verify in detail.

12 16-bit Subtraction

13 Rise time, RC

14

15

16

17

18

19 General Purpose Shifter

20 Modular Adder

21

22

23 Areas ModuleArea (μm 2 ) Count13,200* Partial Product38,000* Sub 163,240 Compare200* ModP5,600* Registers3,000* Mod_add5,200 FSM3,000* *Estimate

24 Top Level Schematic

25 Floorplan

26 Partial Product Progress BlocksInstancesStatus Sub163DRC/LVS/sim Shift Left290% Layout Shift Right2100% Layout Muxes2DRC/LVS Logic (~200 transistors) 10% Layout FullAdder161DRC/LVS

27 Overall Status BlocksInstancesStatus Mod Add1DRC/LVS/sim ModP (shifter)190% Layout Sub 161DRC/LVS/sim FSM/Count110% Layout Registers220% Layout Compare10% Layout

28 What’s Next Layout Forever Continue Simulating Layout extractedRC power Optimize

29 Problems Waveforms are correct, but not always pretty.

30 Questions?